Text
..
~
f y,
TABLE 4.3-2 "8
8 38 g
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION co SURVEILLANCE REQUIREMENTS y
~
DIGITAL OR TRIP o c)
ANALOG ACTUATING MODES c
CHANNEL DEVICE MASTER SLAVE FOR WHICH a83 5
CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RFLAY SURVEILLANCE O 2.a)
- FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
- 1. Safety Injection (Reactor Trip, Feedwater Isolation, Control Room Emergency Ventilation, Start Standby Diesel Generators, Reactor Containment Fan Coolers, and Essential Cooling Water)
- a. Manual Initiation N.A.
N.A.
N. A.
R N. A.
N.A.
N.A.
1,2,3,4 Yg
- b. Automatic Actuation N.A.
N.A.
N.A.
N.A.
N(1)
N.A.
N.A.
1,2,3,4 Logic
- c. Actuation Relays N.A.
N.A.
N.A.
N.A.
N.A.
M%
Q(4,% 1, 2, 3, 4 %
- d. Containment Pressure-S R
M N.A.
N.A.
N.A.
N.A.
1,2,3,4 High-1
- e. Pressurizer Pressure-S R
M N.A.
N.A.
N.A.
N.A.
1,2,3 Low
- f. Compensated Steam Line S R
M N.A.
N.A.
N.A.
N.A.
1,2,3 Pressure-Low
- g. Compensated T S
R H
N.A.
N.A.
N.A.
N.A.
1,2,3 COLD Low-Low (interlocked with P-15)
TABLE 4.3-2 (Continued) g C
E2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS y
R R
DIGITAL OR TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH c5 CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE
]
FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1,2,3,4
- b. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
N.A.
N.A.
1,2,3,4 Logic t'
- c. Actuation Relays N.A.
N.A.
N.A.
N.A.
N.A.
M(O Q
1,2,3,4 4
a Y
- d. Containment Pressure-S R
M N.A.
N.A.
N.A.
N.A.
1,2,3 High-3
- 3. Containment Isolation
- a. Phase "A" Isolation
- 1) Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A 1,2,3,4
- 2) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
N.A.
N.A.
1,2,3,4 Logic
- 3) Actuation Relays N.A.
N.A.
N.A.
N.A.
N.A.
M(fry Q(4) 1, 2, 3', 4 @
- 4) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- b. Containment Ventilation Isolation
- 1) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
N.A.
N.A.
1,2,3,4 Logic W.
- 2) Actuation Relays N.A.
N.A.
N.A.
N.A.
N.A.
M(fd -
Q(4) 1, 2, 3, 4 C
TABLE 4.3-2 (Continued) g S
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS R
DIGITAL OR TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE c-FUNCfl0NAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
~
- 3. Containment Isolation (Continued)
- 3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- 4) RCB Purge Radioactivity-High S
R M
N.A.
N.A.
N.A.
N.A.
1,2,3,4,5*,6*
- 5) Containment Spray -
See Item 2. above for Containment Spray manual initiation Surveillance Manual Initiation Requirements.
- 6) Phase "A" Isolation-See Item 3.a. above for Phase "A" Isolation manual initiation w1 Manual Initiation Surveillance Requirements.
Y
- c. Phase "B" Isolation
- 1) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
N.A.
N.A.
1,2,3,4 Logic g
- 2) Actuation Relays N.A.
N.A.
'N.A.
N.A.
N.A.
M(Ed Q
1,2,3,4 h
- 3) Containment S
R M
N.A.
N.A.
N.A.
N.A.
1,2,3 Pressure--High-3
- 4) Containment Spray-See Item 2. above for Containment Spray manual initiation Surveillance Requirements.
Manual Initiation
- 4. Steam Line Isolation
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A N.A.
1,2,3
- b. Automatic Actuation N.A.
N.A N.A N.A.
M(1)
M Q
1, 2, 3 Logic and Actuation Relays
- c. Steam Line Pressure-S R
M N.A.
N.A.
N.A.
N.A.
3 Negative Rate-High
- d. Containment Pressure -
S R
H N.A.
N.A.
N.A.
N.A.
1,2,3 High-2
TABLE 4.3-2 (Continued) v, o
5 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION I
SURVEILLANCE REQUIREMENTS Q
DIGITAL OR TRIP R
ANALOG ACTUATING MODES CilANNEL DEVICE MASTER SLAVE FOR WHICH CHANNEL CilANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE c_
2 FUNCTIONAL UNIT CiiECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
- 4. Steam Line Isolation
- e. Compensated Steam Line S
R M
N.A.
"..A.
N.A.
N.A.
1,2,3 Pressure-Low-
- f. Compensated T S
R M
N.A.
N.A.
N.A.
N.A.
1,2,3 COLD Low-Low (interlocked with P-15)
- 5. Turbine Trip and Feedwater m1 Isolation M(d[
Y
- a. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
Q(4) 1, 2, 3 (
g Logic and Actuation Relays
- b. Steam Generator Water 5
R M
N.A.
N.A.
N.A.
N.A.
1, 2, 3 Level-High-High (P-14)
- c. Compensated T
-Low 5
R H
N.A.
N.A.
N.A.
N.A.
1,2,3 COLD (interlocked with P-15)
- d. Feedwater Flow-High 5
R H
N.A.
I;. A.
N.A.
N.A.
1, 2, 3 (interlocked with P-15)
Coincident with either of the following in 2 of 4 loops:
Reactor Coolant Flow-Low or T,yg-Low
- e. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- f. T,yg-Low Coincident S
R H
N.A.
N.A.
N.A.
N.A.
1,2,3 with Reactor Trip (P-4)
(Feedwater Isolation Only)
TABLE 4.3-2 (Continued) y, EM ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS
~
x$
DIGITAL OR TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH c-5 CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC lEST TEST, TEST IS REQUIRED
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1,2,3
- b. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
N.A.
N.A.
1,2,3 Logic g
- c. Actuation Relays N.A.
N.A.
N.A.
N.A.
N.A.
M(FJ Q
1,2,3 @
- d. Steam Generator Water S
R H
N.A.
N.A.
N.A N.A 1,2,3 Level--Low-Low y
- e. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- f. Loss of Power See Item 8. below for all Loss of Power Surveillance Requirements.
7.
Automatic Switchover to Containment Sump
- a. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M M(Ed
-Q 1,2,3,4k Logic and Actuation Relays
- b. RWST Level--Low-Low S
R M
N.A.
N.A.
N.A.
N.A 1,2,3,4 Coincident With:
Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- 8. Loss of Power
R N.A M
N.A.
N.A.
N.A.
1,2,3,4 Undervoltage (Loss of Voltage)
g TABLE 4.3-2 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS a
O F.
DIGITAL OR TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH c5 CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE
]
FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
- 8. Loss of Power,,(Continued)
R N.A.
M N.A.
N.A.
N.A.
1,2,3,4 Undervoltage (Tolerable Degraded Voltage Coincident with SI)
R
R N.A.
M N.A.
N.A.
N.A.
1,2,3,4 Undervoltage (Sustained
{
Degraded Voltage) w
- 9. Engineered Safety Features Actuation System Interlocks
- a. Pressurizer N.A.
R M
N.A.
N.A.
N.A.
N.A.
1,2,3 Pressure, P-11 N.A.
R M
N.A.
N.A.
N.A.
N.A.
1,2,3
- b. Low-Low T,y9, P-12
- c. Reactor Trip, P-4 N.A.
N.A N.A.
R N.A.
N.A.
N.A.
1,2,3
- d. Power Range Neutron N.A.
R(2)
M(3)
N.A.
N.A.
N.A.
N.A.
1,2,3 Flux Input to Excessive Cooldown Protection, P-15
- 10. Control Room Ventilation
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
All
y TABLE 4.3-2 (Continued) y, o
h ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE@IREHENTS y
C 2-DIGITAL TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH 5
CHANNEL CilANNEL CilANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE FUNCTIONAL UNIT CllECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED w
- 10. Control Room Ventilation (Continued)
- b. Safety Injection SeeItem1.aboveforallSafetyInjectionSurveillgnceRequirements.
- c. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M N.A.
N.A.
All Logic and Actuation Relays e,
K
- d. Control Room Intake Air S R
M N.A.
N.A.
N.A.
N.A.
All y
Radioactivity-High
- e. Loss of Power See Items 8. above for all Loss of Power Surveillance Requirements.,
1
- 11. FHB HVAC
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1,2,3,4, or with irradiated fuel in the l
spent fuel l
pool r
8 i
M(d N.A.
N.A.
1,2,3,4,(C
- b. Automatic Actuation N.A.
N.A.
N.A.
N.A.
or with Logic and Actuation irradiated Relays fuel in the spent fuel pool
a g
TABLE 4.3-2 (Continued) 5 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION
[
SURVEILLANCE REQUIREFiERIS 0
DIGITAL OR TRIP ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH c-CHANNEL CHANNEL CilANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE
{
FUNCTIONAL UNIT CllECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED
~ 11. FilB HVAC (Continued)
- c. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
- d. Spent Fuel Pool S
R H
N.A.
N.A.
N.A.
N.A.
With Exhaust Radio-irradiated activity-High fuel in spent fuel pool.
k
{
TABLE NOTATION so (1) Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(2) Neutron detectors may be excluded from CHANNEL CALIBRATION.
7 (3) With Rated Thermal Power greater than or equal to the P-15 interlock setpoint, the ANALOG CHANNEL OPERATIONAL TEST shall consist of verifying that the P-15 interlock is in the required state by observing the permissive annunicator window.
Sif K2 49 ickv4 m o
(-
Except relays K807, K814, K829 (Train 8 only), K831, K845, K852 and K8 4 (Trains 3mo%
%y
- b. A (4) and C onl which shall be tested at least once per 18 months during refueling and during each COLD SHUIDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless they have been tested within the previous 92 days.
(5) ExceptrelayK815whichshallbetestedatindicatedintervalonlywhenreactorcoolantpressure]
is above 700 psig. f f f&f Each actuation train shall be tested at least every 92 days on a STAGGERED TEST 3 ASIS. Testing of each actuation train shall include master relay testing of both logic trains.
If an ESFAS instru-mentation channel is inoperable due to failure of the Actuation Logic Test and/or Master Relay Test, increase the surveillance frequency such that each train is tested at least every 62 days on a STAGGERED TEST BASIS unless the failure can be determined by performance of an engineering evaluation to be a single random failure.
- During CORE ALTERATIONS or movement of irradiated fuel within containm nt.