Text

3 , hf

.

, ## 4, UNlTED STATES

., q f' 4 NUCLEAR REGULATORY COMMISSION

f ,. Z

  • ;

h

REGloN til

799 ROOSEVELT ROAD

4 oLEN ELLYN, ILLINols 60137

,

.....

SEP 141978'  :

Docket No. 50-358

Cincinnati Cas and Electric

f

Company

ATTN: Mr. Earl A. Borgmann

Vice President Engineering

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the inspection conducted by Messrs. P. A. Barrett,

J. Hughes, G. F. Maxwell,'and T. E. Vandel, of this office on

August 2-4, 1978, of activities at the Wm. H. Zimmer Nuclear

Power Station authorized by NRC Construction Permit No. CPPR-88

and to the discussion of our findings with Messrs. B. K. Culver

and W. W. Schwiers, others of your staff, and others of the

Zimmer staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared to

be in noncompliance with NRC requirements, as described in the

enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you to

submit to this office within thirty days of your receipt of

this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

i action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved. i

781101@ 60

- . - - - -- --

._

1

1

% l

.

.

Cincinnati Gas and -2- ]3{p 14 Jg7g'

Electric Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of'this

letter, the enclosures, and your response to this letter will

be placed in the NRC's Public Document Room, except as follows.

If the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The appli-

cation must include a full statement of the reasons for which

the information is considered proprietary, and should be pre-

pared so that proprietary information identified in the

application is contained in an enclosure to the application.

!

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e}

a l. '- /

.-

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Rpt

No. 50-358/78-16

cc w/encls:

Mr. J. R. Schott, Plant

Superintendent

Central Files '

ReproductionUnitNRC20b

l MDR

'

Local PDR

NSIC

TIC

, U. Young Park, Power Siting

( Commission

(

l

I

!

l

'

-