|
---|
Category:INSPECTION REPORT
MONTHYEARML20217B4801999-09-21021 September 1999 Insp Rept 70-1201/99-03 on 990823-27.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls,Maint/Surveillance & Training ML20211F7051999-08-19019 August 1999 Insp Rept 70-1201/99-02 on 990726-27.No Violations Noted. Major Areas Inspected:Decommissioning Activities Associated with Wet Weather Stream ML20210G0141999-07-28028 July 1999 Insp Rept 70-1201/99-202 on 990716.No Violations Noted. Major Areas Inspected:Plant Activities,Administrative & Engineered Controls,Ncs Function & Chemical Safety ML20196H9311999-06-25025 June 1999 Insp Rept 70-1201/99-01 on 990524-28.Violations Noted.Major Areas Inspected:Operations,Maint,Training,Transportation & Mgt Programs ML20206A5791999-04-23023 April 1999 Partially Withheld Insp Rept 70-1201/99-201 (Ref 10CFR2.790) on 990323-26.Details Withheld ML20198L1801998-12-28028 December 1998 Partially Withheld Insp Rept 70-1201/98-203 on 981130-1203. Details Withheld,Per 10CFR2.790 ML20154C2341998-09-18018 September 1998 Insp Rept 70-1201/98-06 on 980824-28.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Control,Solid Radwaste Mgt & Housekeeping ML20239A5041998-08-21021 August 1998 Insp Rept 70-1201/98-04 on 980727-31.No Violations Noted. Major Areas Inspected:Review Licensee Fire Protection Program ML20236H1931998-06-12012 June 1998 Insp Rept 70-1201/98-03 on 980518-22.No Violations Noted. Major Areas Inspected:Review of Licensee Radiation Protection Program ML20249A2141998-06-0404 June 1998 Insp Rept 70-1201/98-02 on 980511-15.Violations Noted.Major Areas Inspected:Plant Operations,Waste Mgt,Transportation, Maint/Surveillance & Training ML20216J3361998-04-15015 April 1998 Insp Rept 70-1201/98-01 on 980309-27.No Violations Noted. Major Areas Inspected:Licensee Actions for Decommissioning of Wet Weather Stream ML20216F1571998-04-10010 April 1998 Partially Withheld Insp Rept 70-1201/98-202 on 980309-12.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20217Q3101998-03-0505 March 1998 Partially Withheld Insp Rept 70-1201/98-201 on 980120-23. Violations Noted.Details Withheld,Per 10CFR2.790 ML20198Q2021998-01-12012 January 1998 Insp Rept 70-1201/97-205 on 971217.No Violations Noted.Major Areas Inspected:Receiving & Storage Vault Areas,Pellet Loading Room,Fuel Rod Processing Area & Fuel Bundle Assembly & Storage Areas ML20203E5701997-12-15015 December 1997 Insp Rept 70-1201/97-204 on 971117-18.No Violations Noted. Major Areas Inspected:Chemical Safety,Fire Protection Assessment & Sys & Testing & Emergency Response ML20203A0891997-12-0505 December 1997 Insp Rept 70-1201/97-06 on 971103-07.Violations Noted:Major Areas Inspected:Licensee Operations,Mgt Controls,Training, Environ Protection,Transportation & Waste Mgt Programs ML20149F9101997-07-11011 July 1997 Insp Rept 70-1201/97-05 on 970616-20.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Licensee Programs for Operation Safety,Mgt Organization & Controls, Conduct & Control of Maint & Testing of Safety Equipment ML20140E6471997-06-0606 June 1997 Insp Rept 70-1201/97-04 on 970512-15.Violations Noted.Major Areas Inspected:Licensee Fire Protection Program ML20148B5531997-05-0202 May 1997 Insp Rept 70-1201/97-03 on 970331-0403.Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls & Matls Control & Accounting ML20140E2871997-04-23023 April 1997 Partially Withheld Insp Rept 70-1201/97-203 on 970325-27 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected: Review of Response to Notice of Violation & Proposed Imposition of Civil Penalty, ML20136J5651997-03-11011 March 1997 Insp Rept 70-1201/97-02 on 970224 & 970306.Deviation Noted. Major Areas Inspected:Physical Security Plan ML20147E5491997-02-14014 February 1997 Insp Rept 70-1201/97-202 on 970213 & 14.No Violations Noted. Major Areas Inspected:Adminstrative Practices for Ncs,Ncs Function,Plant Activities,Ncs Change Control,Ncr Training Activities,Ncs Insp,Audits & Investigations & NCS Er ML20134N8651997-02-14014 February 1997 Insp Rept 70-1201/97-01 on 970113-17.No Violations Noted. Major Areas Inspected:Radiological Controls,Environmental Protection & Waste Mgt ML20129H0901996-10-23023 October 1996 Insp Rept 70-1201/96-04 on 960910,13 & 23.Violations Noted. Major Areas Inspected:Solid Radwaste,Effluents,Environ Monitoring Program,Onsite Storage & Waste Manifests ML20129B0451996-09-0606 September 1996 Partially Withheld Insp Rept 70-1201/96-201 on 960819-21. One Noncited Violation,One Unresolved Item & Four New Ifis Opened.Major Areas Inspected:Resolution,Measurement Control, Inventory & Recordkeeping.Details Withheld (Ref 10CFR2.790) ML20057E3401993-09-29029 September 1993 Insp Rept 70-1201/93-04 on 930830-0903.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Maint of Selected Emergency & Fire Protection Equipment,W/Respect to Operational Readiness ML20057E5841993-09-28028 September 1993 Insp Rept 70-1201/93-03 on 930830-0902.No Violations or Deviations Noted.Major Areas Inspected:Organization & Staffing,Audits,Radiation Protection Training,Procedures, External Exposure Control & Control of Radioactive Matl ML20056G8811993-08-26026 August 1993 Insp Rept 70-1201/93-02 on 930809-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection ML20127G6651993-01-0808 January 1993 Insp Rept 70-1201/92-09 on 921207-11.No Violations Noted. Major Areas Inspected:Mgt Controls,Training,Nuclear Criticality Safety,Operations & Maint & Surveillance Testing ML20062F7731990-11-16016 November 1990 Insp Rept 70-1201/90-06 on 901015-19.One Noncited Violation Noted.Major Areas Inspected:Emergency Preparedness Program ML20058B2551990-10-16016 October 1990 Insp Rept 70-1201/90-05 on 900917-20.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring, Instrumentation & Audits ML20059K8511990-09-11011 September 1990 Insp Rept 70-1201/90-04 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations & Maint & Surveillance Testing ML20248C8191989-09-27027 September 1989 Insp Rept 70-1201/89-06 on 890828-30.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluent Monitoring & Control,Radiological Environ Monitoring & QC ML20248B7331989-09-22022 September 1989 Insp Rept 70-1201/89-07 on 890911-13.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Operations Review, Maint & Followup on Previous Insp Findings ML20245K7501989-08-0909 August 1989 Insp Rept 70-1201/89-05 on 890717-20.No Violations & Deviations Noted.Major Areas Inspected:Review of Radiation Protection Program,Including Daily Radiation Protection Activities & Transportation of Radioactive Matl ML20245A7601989-05-26026 May 1989 Insp Rept 70-1201/89-03 on 890417-21.No Violations & Deviations Noted.Major Areas Inspected:Implementation of Agreement Between Us & IAEA for Application of Safeguards in Us ML20247H5131989-05-16016 May 1989 Partially Withheld Insp Rept 70-1201/89-04 on 890502 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Requirements for Physical Protection of Low Enriched Nuclear Matl ML20247M2071989-05-12012 May 1989 Insp Rept 70-1201/89-02 on 890412-14 & 0504-05.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring & Radiological Confirmatory Measurement ML20247E9311989-03-23023 March 1989 Insp Rept 70-1201/89-01 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations,Maint & Followup on Previously Identified Items ML20155F0521988-09-28028 September 1988 Partially Withheld Insp Rept 70-1201/88-09 on 880906-09 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Measurements & Matl Control & Accountability Assessment ML20154R7901988-09-22022 September 1988 Insp Rept 70-1201/88-10 on 880915-16.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls,Nuclear Criticality Safety,Plant Operations,Training & Followup on Operational Safety Assessment ML20151K1361988-07-18018 July 1988 Insp Rept 70-1201/88-08 on 880613-15.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Exposure Controls,Staffing,Radwaste Mgt, Transportation & Followup on Previous Enforcement Issues ML20195H9901988-06-15015 June 1988 Insp Rept 70-1201/88-06 on 880518-20.No Violations or Deviations Noted.Major Areas Inspected:Liquid Gaseous Radwaste,Environ Monitoring & Confirmatory Measurements ML20154A7001988-04-22022 April 1988 Insp Rept 70-1201/88-03 on 880411-15.No Violations & Deviations Noted.Major Areas Inspected:Followup on Inspector Identified Items & Measurement Controls ML20148F6191988-03-0808 March 1988 Insp Rept 70-1201/88-01 on 880201-03.Violation Noted.Major Areas Inspected:Areas of Radiation Protection Program,Solid Radwaste Mgt,Transportation of Radioactive Matls & IE Info Notices ML20150B1371988-03-0202 March 1988 Insp Rept 70-1201/88-02 on 880210-12.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Mgt & Environ Monitoring ML20238F6021987-09-0404 September 1987 Insp Rept 70-1201/87-06 on 870819-20.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Mgt,Environ Monitoring & Confirmatory Measurements ML20215A5431987-05-29029 May 1987 Insp Rept 70-1201/87-05 on 870518-21.No Violations or Deviations Noted.Major Areas Inspected:Review of Radiation Protection Program,Solid Radwaste Mgt,Transportation of Radioactive Matls & Info Notices ML20205Q1941987-03-25025 March 1987 Partially Withheld Insp Rept 70-1201/87-03 on 870223-27 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Measurement,Training Records,Receipts of SNM & Followup on Inspector Identified Items ML20207U0721987-02-27027 February 1987 Operational Safety Assessment Insp Rept 70-1201/87-02 on 870202-06.No Violations Identified.Four Weaknesses & 32 Improvement Items Re Emergency Contingency Planning,Fire Protection,Maint & Nuclear Criticality Safety Identified 1999-09-21
[Table view] Category:NRC-GENERATED
MONTHYEARML20217B4801999-09-21021 September 1999 Insp Rept 70-1201/99-03 on 990823-27.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls,Maint/Surveillance & Training ML20211F7051999-08-19019 August 1999 Insp Rept 70-1201/99-02 on 990726-27.No Violations Noted. Major Areas Inspected:Decommissioning Activities Associated with Wet Weather Stream ML20210G0141999-07-28028 July 1999 Insp Rept 70-1201/99-202 on 990716.No Violations Noted. Major Areas Inspected:Plant Activities,Administrative & Engineered Controls,Ncs Function & Chemical Safety ML20196H9311999-06-25025 June 1999 Insp Rept 70-1201/99-01 on 990524-28.Violations Noted.Major Areas Inspected:Operations,Maint,Training,Transportation & Mgt Programs ML20206A5791999-04-23023 April 1999 Partially Withheld Insp Rept 70-1201/99-201 (Ref 10CFR2.790) on 990323-26.Details Withheld ML20198L1801998-12-28028 December 1998 Partially Withheld Insp Rept 70-1201/98-203 on 981130-1203. Details Withheld,Per 10CFR2.790 ML20154C2341998-09-18018 September 1998 Insp Rept 70-1201/98-06 on 980824-28.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Control,Solid Radwaste Mgt & Housekeeping ML20239A5041998-08-21021 August 1998 Insp Rept 70-1201/98-04 on 980727-31.No Violations Noted. Major Areas Inspected:Review Licensee Fire Protection Program ML20236H1931998-06-12012 June 1998 Insp Rept 70-1201/98-03 on 980518-22.No Violations Noted. Major Areas Inspected:Review of Licensee Radiation Protection Program ML20249A2141998-06-0404 June 1998 Insp Rept 70-1201/98-02 on 980511-15.Violations Noted.Major Areas Inspected:Plant Operations,Waste Mgt,Transportation, Maint/Surveillance & Training ML20216J3361998-04-15015 April 1998 Insp Rept 70-1201/98-01 on 980309-27.No Violations Noted. Major Areas Inspected:Licensee Actions for Decommissioning of Wet Weather Stream ML20216F1571998-04-10010 April 1998 Partially Withheld Insp Rept 70-1201/98-202 on 980309-12.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20217Q3101998-03-0505 March 1998 Partially Withheld Insp Rept 70-1201/98-201 on 980120-23. Violations Noted.Details Withheld,Per 10CFR2.790 ML20198Q2021998-01-12012 January 1998 Insp Rept 70-1201/97-205 on 971217.No Violations Noted.Major Areas Inspected:Receiving & Storage Vault Areas,Pellet Loading Room,Fuel Rod Processing Area & Fuel Bundle Assembly & Storage Areas ML20203E5701997-12-15015 December 1997 Insp Rept 70-1201/97-204 on 971117-18.No Violations Noted. Major Areas Inspected:Chemical Safety,Fire Protection Assessment & Sys & Testing & Emergency Response ML20203A0891997-12-0505 December 1997 Insp Rept 70-1201/97-06 on 971103-07.Violations Noted:Major Areas Inspected:Licensee Operations,Mgt Controls,Training, Environ Protection,Transportation & Waste Mgt Programs ML20149F9101997-07-11011 July 1997 Insp Rept 70-1201/97-05 on 970616-20.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Licensee Programs for Operation Safety,Mgt Organization & Controls, Conduct & Control of Maint & Testing of Safety Equipment ML20140E6471997-06-0606 June 1997 Insp Rept 70-1201/97-04 on 970512-15.Violations Noted.Major Areas Inspected:Licensee Fire Protection Program ML20148B5531997-05-0202 May 1997 Insp Rept 70-1201/97-03 on 970331-0403.Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls & Matls Control & Accounting ML20140E2871997-04-23023 April 1997 Partially Withheld Insp Rept 70-1201/97-203 on 970325-27 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected: Review of Response to Notice of Violation & Proposed Imposition of Civil Penalty, ML20136J5651997-03-11011 March 1997 Insp Rept 70-1201/97-02 on 970224 & 970306.Deviation Noted. Major Areas Inspected:Physical Security Plan ML20147E5491997-02-14014 February 1997 Insp Rept 70-1201/97-202 on 970213 & 14.No Violations Noted. Major Areas Inspected:Adminstrative Practices for Ncs,Ncs Function,Plant Activities,Ncs Change Control,Ncr Training Activities,Ncs Insp,Audits & Investigations & NCS Er ML20134N8651997-02-14014 February 1997 Insp Rept 70-1201/97-01 on 970113-17.No Violations Noted. Major Areas Inspected:Radiological Controls,Environmental Protection & Waste Mgt ML20129H0901996-10-23023 October 1996 Insp Rept 70-1201/96-04 on 960910,13 & 23.Violations Noted. Major Areas Inspected:Solid Radwaste,Effluents,Environ Monitoring Program,Onsite Storage & Waste Manifests ML20129B0451996-09-0606 September 1996 Partially Withheld Insp Rept 70-1201/96-201 on 960819-21. One Noncited Violation,One Unresolved Item & Four New Ifis Opened.Major Areas Inspected:Resolution,Measurement Control, Inventory & Recordkeeping.Details Withheld (Ref 10CFR2.790) ML20057E3401993-09-29029 September 1993 Insp Rept 70-1201/93-04 on 930830-0903.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Maint of Selected Emergency & Fire Protection Equipment,W/Respect to Operational Readiness ML20057E5841993-09-28028 September 1993 Insp Rept 70-1201/93-03 on 930830-0902.No Violations or Deviations Noted.Major Areas Inspected:Organization & Staffing,Audits,Radiation Protection Training,Procedures, External Exposure Control & Control of Radioactive Matl ML20056G8811993-08-26026 August 1993 Insp Rept 70-1201/93-02 on 930809-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection ML20127G6651993-01-0808 January 1993 Insp Rept 70-1201/92-09 on 921207-11.No Violations Noted. Major Areas Inspected:Mgt Controls,Training,Nuclear Criticality Safety,Operations & Maint & Surveillance Testing ML20062F7731990-11-16016 November 1990 Insp Rept 70-1201/90-06 on 901015-19.One Noncited Violation Noted.Major Areas Inspected:Emergency Preparedness Program ML20058B2551990-10-16016 October 1990 Insp Rept 70-1201/90-05 on 900917-20.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring, Instrumentation & Audits ML20059K8511990-09-11011 September 1990 Insp Rept 70-1201/90-04 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations & Maint & Surveillance Testing ML20248C8191989-09-27027 September 1989 Insp Rept 70-1201/89-06 on 890828-30.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluent Monitoring & Control,Radiological Environ Monitoring & QC ML20248B7331989-09-22022 September 1989 Insp Rept 70-1201/89-07 on 890911-13.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Operations Review, Maint & Followup on Previous Insp Findings ML20245K7501989-08-0909 August 1989 Insp Rept 70-1201/89-05 on 890717-20.No Violations & Deviations Noted.Major Areas Inspected:Review of Radiation Protection Program,Including Daily Radiation Protection Activities & Transportation of Radioactive Matl ML20245A7601989-05-26026 May 1989 Insp Rept 70-1201/89-03 on 890417-21.No Violations & Deviations Noted.Major Areas Inspected:Implementation of Agreement Between Us & IAEA for Application of Safeguards in Us ML20247H5131989-05-16016 May 1989 Partially Withheld Insp Rept 70-1201/89-04 on 890502 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Requirements for Physical Protection of Low Enriched Nuclear Matl ML20247M2071989-05-12012 May 1989 Insp Rept 70-1201/89-02 on 890412-14 & 0504-05.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring & Radiological Confirmatory Measurement ML20247E9311989-03-23023 March 1989 Insp Rept 70-1201/89-01 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations,Maint & Followup on Previously Identified Items ML20155F0521988-09-28028 September 1988 Partially Withheld Insp Rept 70-1201/88-09 on 880906-09 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Measurements & Matl Control & Accountability Assessment ML20154R7901988-09-22022 September 1988 Insp Rept 70-1201/88-10 on 880915-16.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls,Nuclear Criticality Safety,Plant Operations,Training & Followup on Operational Safety Assessment ML20151K1361988-07-18018 July 1988 Insp Rept 70-1201/88-08 on 880613-15.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Exposure Controls,Staffing,Radwaste Mgt, Transportation & Followup on Previous Enforcement Issues ML20195H9901988-06-15015 June 1988 Insp Rept 70-1201/88-06 on 880518-20.No Violations or Deviations Noted.Major Areas Inspected:Liquid Gaseous Radwaste,Environ Monitoring & Confirmatory Measurements ML20154A7001988-04-22022 April 1988 Insp Rept 70-1201/88-03 on 880411-15.No Violations & Deviations Noted.Major Areas Inspected:Followup on Inspector Identified Items & Measurement Controls ML20148F6191988-03-0808 March 1988 Insp Rept 70-1201/88-01 on 880201-03.Violation Noted.Major Areas Inspected:Areas of Radiation Protection Program,Solid Radwaste Mgt,Transportation of Radioactive Matls & IE Info Notices ML20150B1371988-03-0202 March 1988 Insp Rept 70-1201/88-02 on 880210-12.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Mgt & Environ Monitoring ML20238F6021987-09-0404 September 1987 Insp Rept 70-1201/87-06 on 870819-20.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Mgt,Environ Monitoring & Confirmatory Measurements ML20215A5431987-05-29029 May 1987 Insp Rept 70-1201/87-05 on 870518-21.No Violations or Deviations Noted.Major Areas Inspected:Review of Radiation Protection Program,Solid Radwaste Mgt,Transportation of Radioactive Matls & Info Notices ML20205Q1941987-03-25025 March 1987 Partially Withheld Insp Rept 70-1201/87-03 on 870223-27 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Measurement,Training Records,Receipts of SNM & Followup on Inspector Identified Items ML20207U0721987-02-27027 February 1987 Operational Safety Assessment Insp Rept 70-1201/87-02 on 870202-06.No Violations Identified.Four Weaknesses & 32 Improvement Items Re Emergency Contingency Planning,Fire Protection,Maint & Nuclear Criticality Safety Identified 1999-09-21
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20217B4801999-09-21021 September 1999 Insp Rept 70-1201/99-03 on 990823-27.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls,Maint/Surveillance & Training ML20211F7051999-08-19019 August 1999 Insp Rept 70-1201/99-02 on 990726-27.No Violations Noted. Major Areas Inspected:Decommissioning Activities Associated with Wet Weather Stream ML20210G0141999-07-28028 July 1999 Insp Rept 70-1201/99-202 on 990716.No Violations Noted. Major Areas Inspected:Plant Activities,Administrative & Engineered Controls,Ncs Function & Chemical Safety ML20196H9311999-06-25025 June 1999 Insp Rept 70-1201/99-01 on 990524-28.Violations Noted.Major Areas Inspected:Operations,Maint,Training,Transportation & Mgt Programs ML20196H9201999-06-25025 June 1999 Notice of Violation from Insp on 990524-28.Violation Noted: on 990525,inspector Observed That Gate 6 Was Not Closed & Locked & Was Not Attended or in Use ML20206A5791999-04-23023 April 1999 Partially Withheld Insp Rept 70-1201/99-201 (Ref 10CFR2.790) on 990323-26.Details Withheld ML20198L1801998-12-28028 December 1998 Partially Withheld Insp Rept 70-1201/98-203 on 981130-1203. Details Withheld,Per 10CFR2.790 ML20154C2341998-09-18018 September 1998 Insp Rept 70-1201/98-06 on 980824-28.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Control,Solid Radwaste Mgt & Housekeeping ML20239A5041998-08-21021 August 1998 Insp Rept 70-1201/98-04 on 980727-31.No Violations Noted. Major Areas Inspected:Review Licensee Fire Protection Program ML20236H1931998-06-12012 June 1998 Insp Rept 70-1201/98-03 on 980518-22.No Violations Noted. Major Areas Inspected:Review of Licensee Radiation Protection Program ML20249A2141998-06-0404 June 1998 Insp Rept 70-1201/98-02 on 980511-15.Violations Noted.Major Areas Inspected:Plant Operations,Waste Mgt,Transportation, Maint/Surveillance & Training ML20249A2131998-06-0404 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: from 1993 Until Feb 1998,Framatome Cogema Fuels Did Not Make or Cause to Be Made,Surveys Neccessary to Show Compliance w/10CFR20.2003(a) to Evaluate Concentrations ML20216J3361998-04-15015 April 1998 Insp Rept 70-1201/98-01 on 980309-27.No Violations Noted. Major Areas Inspected:Licensee Actions for Decommissioning of Wet Weather Stream ML20216F1571998-04-10010 April 1998 Partially Withheld Insp Rept 70-1201/98-202 on 980309-12.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20217Q3101998-03-0505 March 1998 Partially Withheld Insp Rept 70-1201/98-201 on 980120-23. Violations Noted.Details Withheld,Per 10CFR2.790 ML20198Q2021998-01-12012 January 1998 Insp Rept 70-1201/97-205 on 971217.No Violations Noted.Major Areas Inspected:Receiving & Storage Vault Areas,Pellet Loading Room,Fuel Rod Processing Area & Fuel Bundle Assembly & Storage Areas ML20203E5701997-12-15015 December 1997 Insp Rept 70-1201/97-204 on 971117-18.No Violations Noted. Major Areas Inspected:Chemical Safety,Fire Protection Assessment & Sys & Testing & Emergency Response ML20203A0891997-12-0505 December 1997 Insp Rept 70-1201/97-06 on 971103-07.Violations Noted:Major Areas Inspected:Licensee Operations,Mgt Controls,Training, Environ Protection,Transportation & Waste Mgt Programs ML20203A0821997-12-0505 December 1997 Notice of Violation from Insp on 971103-07.Violation Noted: Health Physics Audit Conducted 970128-0203 Only Included Review of RP Procedures in Context of Impact on EP & Did Not Consist of Review of Effectiveness of Procedural Controls ML20149F9101997-07-11011 July 1997 Insp Rept 70-1201/97-05 on 970616-20.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Licensee Programs for Operation Safety,Mgt Organization & Controls, Conduct & Control of Maint & Testing of Safety Equipment ML20140E6401997-06-0606 June 1997 Notice of Violation from Insp on 970512-15.Violation Noted: No Fire Safety Insp Was Conducted During 1996 at Facility ML20140E6471997-06-0606 June 1997 Insp Rept 70-1201/97-04 on 970512-15.Violations Noted.Major Areas Inspected:Licensee Fire Protection Program ML20148B5471997-05-0202 May 1997 Notice of Violation from Insp on 970331-0403.Violation Noted:On 970402,approx One Hundred Nylon Straps Were Being Temporarily Stored in Fuel Assembly Storage Area in Anticipation of Future Usage ML20148B5531997-05-0202 May 1997 Insp Rept 70-1201/97-03 on 970331-0403.Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls & Matls Control & Accounting ML20140E2871997-04-23023 April 1997 Partially Withheld Insp Rept 70-1201/97-203 on 970325-27 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected: Review of Response to Notice of Violation & Proposed Imposition of Civil Penalty, ML20136J5421997-03-11011 March 1997 Notice of Deviation from Insp on 970224-0306.Deviation Noted:Licensee Failure to Meet Commitment That Procedure Would Be Completed by 960430 ML20136J5651997-03-11011 March 1997 Insp Rept 70-1201/97-02 on 970224 & 970306.Deviation Noted. Major Areas Inspected:Physical Security Plan ML20135D6831997-03-0404 March 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500.Noncompliance Noted:From 960914-25, Procedure MA-587 Not Adhered To,Operators Performing Fuel Assembly Off Loading Operations Failed to Ensure Unloading ML20137M0451997-02-27027 February 1997 EN-97-016:on 970304,notice of Proposed Imposition of Civil Penalty in Amount of $12,500 Issued to Licensee.Action Based on Five Violations Involving Event low-enriched,unirradiated Fuel Assembly Inadvertently Returned in Original Container ML20134N8651997-02-14014 February 1997 Insp Rept 70-1201/97-01 on 970113-17.No Violations Noted. Major Areas Inspected:Radiological Controls,Environmental Protection & Waste Mgt ML20147E5491997-02-14014 February 1997 Insp Rept 70-1201/97-202 on 970213 & 14.No Violations Noted. Major Areas Inspected:Adminstrative Practices for Ncs,Ncs Function,Plant Activities,Ncs Change Control,Ncr Training Activities,Ncs Insp,Audits & Investigations & NCS Er ML20129H0651996-10-23023 October 1996 Notice of Violation from Insp on 960910,13 & 23.Violation Noted:Licensee Failed to Review,Document Results & Take Appropriate Corrective Actions for Vegetation Sample Collected May 1995 That Exceeded Licensee Action Limits ML20129H0901996-10-23023 October 1996 Insp Rept 70-1201/96-04 on 960910,13 & 23.Violations Noted. Major Areas Inspected:Solid Radwaste,Effluents,Environ Monitoring Program,Onsite Storage & Waste Manifests ML20129B0451996-09-0606 September 1996 Partially Withheld Insp Rept 70-1201/96-201 on 960819-21. One Noncited Violation,One Unresolved Item & Four New Ifis Opened.Major Areas Inspected:Resolution,Measurement Control, Inventory & Recordkeeping.Details Withheld (Ref 10CFR2.790) ML20057E3401993-09-29029 September 1993 Insp Rept 70-1201/93-04 on 930830-0903.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Maint of Selected Emergency & Fire Protection Equipment,W/Respect to Operational Readiness ML20057E5841993-09-28028 September 1993 Insp Rept 70-1201/93-03 on 930830-0902.No Violations or Deviations Noted.Major Areas Inspected:Organization & Staffing,Audits,Radiation Protection Training,Procedures, External Exposure Control & Control of Radioactive Matl ML20056G8811993-08-26026 August 1993 Insp Rept 70-1201/93-02 on 930809-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection ML20127G6651993-01-0808 January 1993 Insp Rept 70-1201/92-09 on 921207-11.No Violations Noted. Major Areas Inspected:Mgt Controls,Training,Nuclear Criticality Safety,Operations & Maint & Surveillance Testing ML20062F7731990-11-16016 November 1990 Insp Rept 70-1201/90-06 on 901015-19.One Noncited Violation Noted.Major Areas Inspected:Emergency Preparedness Program ML20058B2551990-10-16016 October 1990 Insp Rept 70-1201/90-05 on 900917-20.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring, Instrumentation & Audits ML20059K8511990-09-11011 September 1990 Insp Rept 70-1201/90-04 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations & Maint & Surveillance Testing PNO-II-90-036, on 900707,licensee Notified NRC That tractor- Trailer Carrying 6 Containers of New Fuel Assemblies Destined for Power Plant in Arkansas Had Been Involved in Accident.Two Containers Had Damaged Outer Seals1990-07-0909 July 1990 PNO-II-90-036:on 900707,licensee Notified NRC That tractor- Trailer Carrying 6 Containers of New Fuel Assemblies Destined for Power Plant in Arkansas Had Been Involved in Accident.Two Containers Had Damaged Outer Seals ML20248C8191989-09-27027 September 1989 Insp Rept 70-1201/89-06 on 890828-30.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluent Monitoring & Control,Radiological Environ Monitoring & QC ML20248B7331989-09-22022 September 1989 Insp Rept 70-1201/89-07 on 890911-13.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Operations Review, Maint & Followup on Previous Insp Findings ML20245K7501989-08-0909 August 1989 Insp Rept 70-1201/89-05 on 890717-20.No Violations & Deviations Noted.Major Areas Inspected:Review of Radiation Protection Program,Including Daily Radiation Protection Activities & Transportation of Radioactive Matl ML20245A7601989-05-26026 May 1989 Insp Rept 70-1201/89-03 on 890417-21.No Violations & Deviations Noted.Major Areas Inspected:Implementation of Agreement Between Us & IAEA for Application of Safeguards in Us ML20247H5131989-05-16016 May 1989 Partially Withheld Insp Rept 70-1201/89-04 on 890502 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Requirements for Physical Protection of Low Enriched Nuclear Matl ML20247M2071989-05-12012 May 1989 Insp Rept 70-1201/89-02 on 890412-14 & 0504-05.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring & Radiological Confirmatory Measurement ML20247E9311989-03-23023 March 1989 Insp Rept 70-1201/89-01 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mgt Controls, Training,Nuclear Criticality Safety,Plant Operations,Maint & Followup on Previously Identified Items ML20155F0521988-09-28028 September 1988 Partially Withheld Insp Rept 70-1201/88-09 on 880906-09 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Measurements & Matl Control & Accountability Assessment 1999-09-21
[Table view] |
Text
_ __ ._ _ .. . ._ . . . . ._ . _ .
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED U. S. NUCLEAR REGULATORY COMMISSION 1
REGION II
, Docket No.: 70 1201 j
- 1 License No.: SNM 1168 4
Report No.: 70-1201/97 03 Licensee: Framatome Cogema Fuels
. 1 Facility: Lynchburg Manufacturing Facility
{
Location: Lynchburg, VA Dates: March 31 through April 3, 1997 Inspectors: C. Bassett, Senior Radiation Specialist D. Ayres, Fuel Facilities Inspector Approved by: E. J. McAlpine, Chief Fuel Facilities Branch Division of Nuclear Materials Safety l
l Enclosure 2 DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED 9705130138 970502 PDR ADOCK 07001201 C PDR,
- _ ._ _ . _ .. .__-m._ _ _ . _ _ . _ _ _ _ __ _ .-__ _ _ _ _ . _
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED '
a
~
EXECUTIVE
SUMMARY
Framatome'Cogema Fuels i NRC Inspection Report No. 70-1201/97 03 i
The primary focus of this inspection was the observation and evaluation of the i licensee's programs for operational safety, configuration management, and t
maintenance of safety controls. The report includes inspection efforts of two i regional inspectors. The inspection identified the following aspects of the
[ licensee programs as outlined below:
PLANT OPERATIONS e Criticality safety postings and safety rules were properly issued and ,
4 conspicuously posted. However, some of the posted instructions were found 1 s to be confusing or ambiguous. The postings were also widely issued
, without an indication on them as to management approval and may be ;
susceptible to producing conflicts with approved procedures or document l control problems. '
4
~
e Despite recent retraining efforts and emphasis on procedural compliance, the licensee's adherence to approved procedures and postings was found to be less than adequate. A violation of required procedures and postings in the plant operations realm was identified by the inspectors (VIO 97 03-01). Although the inspectors found no immediate hazards, improvements in the licensee's content of and conformity to safety related instructions are necessary for continued assurance of safety.
e An unresolved item (URI 97 03 02) was identified concerning an unanalyzed condition regarding moderating materials in the fuel. assembly storage area.
e The licensee's Configuration Control Program was found to have a detailed, programmatic method for reviewing, approving, and implementing facility modifications. However, the licensee *s implementation of this program and the maintaining of the required document trail were found to be 2
incomplete, although adequate safety reviews were performed. The incomplete document trail is another example of failure to follow procedures and is noted as a non cited violation (NCV 97 03 03).
l MANAGEMENT ORGANIZATION AND CONTROLS e No problems were noted with the recent changes that had been made in the licensee's organization and the individuals were aware of their responsibilities with respect to nuclear criticality safety.
j
. DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
.- _ _ . - ~ .
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED i
i e The inspectors concluded that qualified personnel were conducting the audits, that issues were being identified that required corrective actions, and that the audit findings were being forwarded to and reviewed by management. One audit item concerning NCS postings on scrap pellet storage trailers was noted by the inspectors as a non cited violation (NCV 97-03 04). l e The intervals between safety audits were such that the licensee did not adequately fulfill the semi annual audit requirements. A violation was ;
cited by the insxictors (VIO 97 03 05) for failure to adhere to the !
l commitments in t1e license application concerning audit frequency. l J
MATERIAL CONTROL AND ACCOUNTING e A violation of internal procedure for failure to control access to tamper-safing devices was identified and is described in Enclosures 3 and 4 '
(VIO 97 03 06).
1
Attachment:
Persons Contacted l Inspection Procedures Used j List of Items Closed and Opened I
i l
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED 1
' Report Details #1 I. Safety Operations A. Plant Operations (03) (88020) l
, l
. 1. Conduct of Operations (03.01)
- a. Inspection Scooe i
The inspectors conducted plant tours of various facility areas to confirm that operations were being performed as described in written procedures and in accordance with posted instructions to assure safe operations of the facility processes.
.b. Observations and Findinas l
4 The inspectors were initially given a tour of the Lynchburg Manufacturing Facility and observed material handling activities in the pellet loading room (observed through a window from a "non-controlled"
) area): fuel rod fabrication area; and fuel bundle assembly, storage, and shipping areas. The inspectors also toured areas which routinely involve radioactive material handling, but in which material handling activities were not being performed at the time of the tour. These '
areas included the pellet receiving room, and two of the Service )
Equipment Reconditioning Facilities (SERF-1 and SERF 4). Criticality l safety postings and other posted safety related instructions were 1 observed at various locations throughout the facility. The inspectors found most of the postings to be framed and neatly displayed and easily .
recognizable. However, the inspectors found some of the instructions !
confusing or too ambiguous to be clearly understood by someone who is I not already familiar with the intent of the instructions. Examples include maintaining a 12 foot separation between differ at accumulations of SNM (with no indication as to what constitutes "different accumulations") and limiting pellets to a 4 inch slab height configuration except when transferring fuel from the shipping container .
to a conveyor (with no indication as to the limits during this '
transfer). These observations were shared with the licensee's Safety and Licensing support staff.
During the facility tour, the inspectors observed two slightly different '
sets of safety instructions posted in the same part of the pellet receiving area. The inspectors informed the licensee of the discrepancy and the licensee subsequently removed the outdated posting. Although not specifically required by NRC regulations, the inspectors also identified that none of the postings were marked with any type of i indicator.s for document control nor for management approval. These J
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
l DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED l
l l 2 indicators (which can include a document or form number, a revision number, copy number, and a management contact reference) are typically useful for maintaining control of posted instructions. A system for l controlling safety and licensing documents already exists for procedures
! and forms (in the licensee's procedure SL 1000), and could be similarly applied to safety postings. The inspectors identified this potential )
l problem area to the licensee's Safety and Licensing support staff, i The inspectors performed numerous reviews to confirm the licensee's compliance with approved procedures and postings in its conduct of operations. A review of a recent process equipment change prompted the inspectors to examine posted instructions for the operation and inspection of a vacuum cleaner used to remove SNM residues from a downdraft table in the pellet loading room. As part of the new installation, the vacuum cleaner bag casing was modified to limit the size of the filter bag and to restrict the volume of SNH accumulating within the casing. The posting included an instruction for a daily visual inspection of the filter bag inside the vacuum cleaner to verify the integrity of the bag, and thus to verify that criticality safety controls remain intact. A logsheet was also provided to document these inspections. The inspectors found that in the previous six months, the filter bag inspections were not being documented except when the filter ;
bag was changed (once or twice a month). Interviews with operations 1 mrsonnel indicated that these inspections were being performed daily. I iowever, the documentation of safety related inspections are important I for confirming that safety requirements are being met by the licensee.
The licensee's internal Health Safety inspection program is maintained ,
to provide assurance that plant activities are conducted safely and in 1 accordance with license specifications. This internal program should )
have been able to detect the lack of documentation Sf required safety- I related inspections, and is an example of the ongoing problems the licensee has experienced with adherence to procedures.
During an inspection of the fuel assembly storage area on April 2,1997, the inspectors observed a large collection of nylon straps (anproximately 100) within the designated storage area. The straps were !
ea:h anproximately 5 cm wide and 1 meter in length. About 60 straps l were observed to be neatly coiled into individual bundles and placed in i various locations along the catwalks between rows of storage racks.
Another collection of about 40 straps were loosely piled at the end of one of the catwalks next to a wall. These straps were found to have been placed in the area in anticipation of their use in securing NUKEH l fuel assemblies into the storage racks. The inspectors found the '
accumulation of nylon straps to be in contradiction with the posted criticality limits in the area which stated, " Moderating material (plastics, liquids, etc.) MUST NOT be stored ir the fuel assembly storage area...." The as found condition of the storage racks was such j
i DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED 1
4 DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED 3
that fuel assemblies containing SNM were not present in the vicinity of the moderating materials. However, the lack of control of unanalyzed moderating materials in a SNM storage area can result in a situation in :
which acceptable safety margins are compromised. Even though the as- !
found condition did not directly affect fuel assemblies containing SNM, i strict adherence to criticality safety rules is expected. Due to its
. potential safety risk, this issue is cited as a violation for failure to follow posted safety instructions (VIO 70-1201/97 03 01).
Additionally, the use of nylon straps to secure NUKEM fuel assemblies into the racks was found to have not been fully analyzed as to their effect on the k,,, value of the storage array, but had been deemed i insignificant by the licensee. Further discussions with licensee management revealed that the effects of other plastics used for protecting fuel assemblies from damage had not been fully analyzed. The inspectors could not assess the significance of the effects of these unanalyzed moderating materials, and this issue will be referred to NRC -
Headquarters for further evaluation and is identified as an unresolved '
item (URI 70 1201/97 03 02).
- c. Conclusions The licensee's adherence to approved )rocedures and postings was found to be less than adequate. Although t1e inspectors found no immediate hazards, improvements in the licensee's content of and conformity to safety related instructions are necessary for continued assurance of safety.
- 2. Facility Modifications and Confiauration Controls (03.02)
- a. Insoection Scooe The licensee's Configuration Control Program was reviewed to confirm that any recent changes or modifications to the facility with nuclear criticality safety implications were reviewed, approved, and implemented as required by procedure.
- b. Observations and Findinas The licensee's Configuration Control Program was outlined in procedure AS 1120, "CNFP Safety Review Board," Revision 5, dated December 8, 1993.
The inspectors reviewed the procedure and noted that, even though a modification could be reviewed, ap3 roved, and completed, the procedure did not specifically address how t1e modification could affect and cause a need for revisions to the affected piping and instrumentation diagrams DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
DECONTROLLED WHEN 2,790 INFORMATION IS REMOVED i
4 (P& ids) or revisions to the maintenance program. However, the inspectors confirmed that appropriate controls for implementing the actual changes and modifications were established to meet the intent of the license.
The inspectors also reviewed the forms completed by the licensee to document the implementation of the modifications and the controls
. smcified or required by such changes. The inspectors determined that 2
t1e documentation was not always complete. Nine project packages for facility modifications dating back over the past three years were reviewed for compliance with the program outlined in procedure AS 1120.
The insmetors identified deficiencies in the completion of the prescri ad forms for eight of these projects. Auxiliary documents (memos, analyses, etc.) confirmed that adequate reviews by the safety functions had been performed, but the intent of the completion of the prescribed forms was to provide an easily recognizable status of the safety requirements associated with a process modification. The deficiencies in the completion of the forms prescribed in procedure AS-1120 was found to be a violation of the license application. However, adequate safety reviews had been performed and corrective actions were
- being implemented to address a previous similar violation. Therefore, this NRC identified violation is not being cited because criteria smcified in Section VII.B of the NRC Enforcement Policy were satisfied (4CV 70-1201/97-03 03).
- c. Conclusions t
4 The licensee's Configuration Control Program was found to have a 2
detailed, programmatic method for reviewing, approving, and implementing facility modifications. The licensee's implementation of this program and the maintaining of the required document trail were found to be incomplete, although adequate safety reviews were performed.
B. Management Organization and Controls (05) (88020)
- 1. Oraanizational Structure (05.01)
- a. Insoection Scope 4
The inspectors reviewed the licensee's organizational structure to determine whether changes had been made since the last inspection at the facility.
- b. Observations and Findinas During the inspection, the inspectors were provided with a copy of the i
facility organizational structure. It was noted that changes had been
- made to the organization since the last Region II inspection. The DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED i
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED i
j 5 3ersons filling the positions of Manufacturing Engineering and Fuel i
4anufacturing were new to those positions but not new to the company or the facility. Through discussions with those individuals the inspectors j determined that they were aware of and understood their responsibilities i
- concerning nuclear criticality safety as well as their other 1 responsibilities for production and safety in general.
1-4- C. Conclusions 4 No problems were noted with the recent changes that had been made in the licensee's organization and the individuals were aware of their j- responsibilities with respect to nuclear criticality safety.
[ 2. Internal Reviews and Audits (05.03) j a. Inspection Scooe
- The inspectors reviewed recent audits to ensure that the audits were i
being conducted by the appropriate staff as required by the license application and in accordance with applicable procedures and to ensure a that procedural violations and equipment or system failures related to i NCS were being identified and reported.
j b. Observations and Findinas 3
The inspectors reviewed the most recent semi annual audits in the area i
of nuclear criticality safety. The inspectors noted that the audits had been conducted and reviewed by personnel from the nuclear criticality j staff and the results had been forwarded to the Manager of Safety and Licensing, as well as the Plant Manager. The inspectors noted that two 3 audits were conducted each year and included a review of the activities
! in the various receiving, manufacturing, and storage areas of the plant.
When an audit identified items that needed to be corrected, a response
[ was generated and corrective actions were initiated by the licensee.
One of the audit findings noted by the licensee's auditors during December 1996 was that some trailers used to store U0 scrap material did not have criticality safety signs affixed to the krailer doors indicating the presence of the SNM material inside. The auditors noted
- that the failure to post the trailers was an apparent violation of i License Condition 10 of Materials License SNM 1168 which requires the l licensee to comply with all listed conditions in Safety Conditions.
1 Safety Condition S 1 requires the licensee to comply with the i
statements, representations, and conditions in Part I of the License A) plication dated June 22, 1990, and supplements thereto. Part I, a
Clapter 4, Section 4.1.5 of the Application, requires that nuclear
- safety postings, approved by Health Safety, shall be maintained
- specifying nuclear safety parameters that are subject to procedural j DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED 1 !
! 6 i controls. Section 4.1.5 also stipulates that operations for which
- j. specific (dedicated) controls are applicable shall be individually posted. In response to this audit, the licensee 3osted each trailer
' containing U0g scrap material with signs designat ng that SNM was stored ;
inside and stipulating the Criticality Safety Limits for the trailers. l The licensee also submitted all the criticality safety postings to the
, nuclear criticality safety group for review and revision as necessary.
The inspectors informed the licensee that this licensee-identified and i
! corrected violation was not being cited because criteria specified in
, Section VII.B of the NRC Enforcement Policy were satisfied (NCV 70-4 1201/97-03 04).
l i The insactors reviewed the timeliness of the audits. It was noted that audits 1ad been conducted as follows: December 13,1994, July 20,1995, i
October 6, 1995, August 26, 1996, and December 16, 1996. The inspectors l noted that the time span between the inspection in October 1995 and j
. August 1996 appeared to be in violation of License Condition 10 of ;
- Materials License SNM-1168 which requires the licensee to comply with !
all listed conditions in Safety Conditions. Safety Condition S-1
- requires the licensee to comply with the statements, representations, i and conditions in Part I of the License Application dated June 22, 1990,
!' and supplements thereto. Part I, Chapter 2. Section 2.7 of the Application, requires that independent auditors shall conduct, as a l minimum, semi annually nuclear safety, fire safety, and health physics j inspections at the CNFP. Procedure No. RP 000, " Radiation Protection
! Program Definitions " Revision 1, dated January 31, 1996, which is i applicable to the plant Safety and Licensing Department, defines " semi-annual" in Section 4.24 as being at least once every six (6) calendar months +25% (45 days). The licensee was informed that the failure to
! complete a semi-annual audit of the nuclear safety program within the i required time frame was cited as a violation for failure to follow
- procedures (VIO 70 1201/97-03-05).
- c. Conclusions
! The inspectors concluded that qualified personnel were conducting the
- audits, that issues were being identified that required corrective !
i actions, and that the audit findings were being forwarded to and ;
- reviewed by management. However, the intervals between audits were such '
that the licensee did not adequately fulfill the semi-annual audit i frequency requirement.
l l
l- I
- DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
! s
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED II. Mana m nt Meetinas A. Exit Interview (MI)
On April 3, 1997, the inspection scope and results were summarized with licensee representatives. The inspectors discussed in detail the routine program areas inspected, and the findings, including violations.
4 No dissenting comments were expressed by the licensee.
, The licensee did not identify any of the materials provided during the inspection as proprietary.
{
I g
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED a
d l
ATTACHMENT
- 1. PERSONS CONTACTED 2
Licensee Personnel
- T. Allsep, Health Physicist
- C. Carr, Vice President Manufacturing and Services
- G. Elliott, Manager, Safety and Licensing
- R. Gardner, Manager, Quality, FCF 4
- D. Gordon, Sr. Health Physicist
! *G. Lindsey, Health Physicist
- F. Masseth. Manager, Operations and Resource Control
- D. Minor, Manager, Manufacturing Engineering
- T. Wilkerson, Manager, Nuclear Fuel Manufactu^ ring Other licensee employees contacted included engineers, technicians, security, and office personnel.
- Denotes those present at the exit meeting on April 3, 1997.
- 2. INSPECTION PROCEDURE USED l
IP 88020 Regional Nuclear Criticality Safety Inspection Program
- 3. LIST OF ITEMS OPENED, CLOSED, AIO DISCUSSED Item Number Status Descriotion 70-1201/97 03 01 Open VIO - Failure to comply with posted NCS recuirements concerning storage of mocerating materials in the fuel assembly storage area.
70 1201/97 03 02 Open URI - Plastic materials used in the fuel assembly storage area have not been fully analyzed for their effect on k,,,.
70-1201/97 03 03 Closed NCV - Failure to comply with documentation requirements of the licensee's Safety Review Board procedure (AS 1120).
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED l 4
1 s
70 1201/97 03 04 Closed NCV - Failure to properly post storage trailers containing unirradiated scrap I fuel pellets per the approved license ;
application. I i 70 1201/97 03 05 Open VIO Failure to comply with the j timeliness requirements of semi-annual i safety audits per the approved license l application and the Radiation Protection ,
Program Definitions procedure (RP-000).
70 1201/97 03 06 Open VIO - Failure to control access to i tamperseals per FNHC Plan.
- 4. LIST OF ACRONYMS 8
CNFP Commercial Nuclear Fuel Plant l FCF Framatome Cogema Fuels l FNHC Fundamental Nuclear Materials Control IP InspctionProcedure NCS Nuc ear Criticality Safety NCV Non Cited Violation SERF Service Equipment Reconditioning Facility SNM Special Nuclear Material URI Unresolved Item VIO Violation i
i i
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED '