ML20141N806
| ML20141N806 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/13/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20141N807 | List: |
| References | |
| NUDOCS 8603180153 | |
| Download: ML20141N806 (1) | |
See also: IR 05000414/1986014
Text
'M
gha
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
<
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NO. 50-414/86-14
On February 10-21, 1986, NRC inspected activities authorize'd by NRC Construction
Per. nit No. CPPR-117 for your Catawba facility. At the conclusion of the inspec-
tion, the findings were discussed with those members of your staff identified in
the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
,
Sincerely,
Isl
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/86-14
cc w/ enc 1:
R. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bec w/ enc 1:
8603100153 e60313
K. N. Jabbour, NRR
ADUCK O
4M4
'
Document Control Desk
0
State of South Carolina
'
gt
.
RI
RI!
RI!
1 homas:cdg
FJap
ARHerdt
'
03//d/86
03/ ,80
03/0 /86
'
oI
,
5 of