February 24, 1986 l
l Docket No.'50-219' Mr. P. B. Fiedler Vice President and Director Oyster. Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
Dear Mr. Fiedler:
SUBJECT:
DEFERMENT OF FEEDWATER N0ZZLE INSPECTIONS FROM THE CYCLE 11R OUTAGE Re:
Oyster Creek Nuclear Generating Station By letter dated April 9,1981, you committed to follow the recormended NRC inspection program for feedwater nozzle and sparger configurations in Table 2 of NUREG-0619, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking, November 1980. This commitment requires you to inspect the feed-water nozzles in the upcoming Cycle 11 Refueling (Cycle 11R) outage which is scheduled to begin in April 1986. However, by letter dated November 20, 1985, you have requested that the feedwater nozzle inspection be deferred to the Cycle 12R outage which is scheduled for 1988.
The staff has reviewed your request and has had a meeting with your staff on December 13, 1985. Based on our review, we conclude that any previous undetected flaws, if any exist, in the feedwater nozzles will not grow to an i
unacceptable size during one more operating cycle and that this inspection deferment is acceptable. Enclosed is the staff's Safety Evaluation for this action.
Sincerely, BHsinal signed w t
John A. Zwolinski, Director BWR Project Directorate #1 Division of'BWR Licensing
Enclosure:
Safety Evaluation cc w/ enclosure:
gRo3030474 e60224 See next page a
ADOCK 05000219 PDR DISTRIBUTION Docket EJordan Glainas NRC PDR BGrimes JTsa o Local PDR JPartlow PD #1 RDG JDonohew RBernero CJamerson OELD JZwolinski ACRS(10)
OC File, DBL:PD#1 J,
- D#1 CJamersonM JD hew:jg JZwolinski 1/.1f/86(
}/
86
@f86
i Mr. P. B. Fiedler Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station cc:
G. F. Trowbridge, Esquire Resident Inspector i
Shaw, Pittman, Potts and Trowbridge e/o U.S. NRC 1800 M Street, N.W.
Post Office Box 445 Washington, D.C.
20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy i
1155 Avenue of the Americas 101 Conenerce Street i
New York, New York 10036 Newark, New Jersey 07102 a
s Eugene Fisher, Assistant Director J
j Regional Administrator, Region I Division of Environmental Quality
~
i U.S. Nuclear Reguiatory Commission Department of Environmental j
631 Park Avenue Protection King of Prussia, Pennsylvania 19406 380 Scotch Road
)
Trenton, New Jersey 08628 l
BWR Licensing Manager
[
i GPU Nuclear l
100 Interpace Parkway j
Parsippany, New Jersey 07054 t
Deputy Attorney General
[
- State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 j
Trenton, New Jersey 08625 j
Mayor Lacey Township 818 West Lacey Road
+
Forked River, New Jersey 08731 i
i D. G. Holland l
Licensing Manager Oyster Creek Nuclear Generating Station
{
Post Office Box 388 Forked River, New Jersey 08731
(
i
{
l i
--