s m

i BYRON NUCLEAR POWER STATION l

UNIT 1 i

I MONTIILY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 l

LICENSE NO. NPF-37 4

I t

f i

t i

i

[?

I i

\\

l (0625M/62M) l 4y

~ v. (-

l t.

O

(

. - ~..

m.

}

I.

Monthly Report for Byron Unit 1 A.

Summary of Operating Experience for Unit l-l The Unit continued in a scheduled outage through December 16th. On the 17th the reactor was brought critical and power ascension began.

3 The return to 92% power was slightly delayed dse to condenser tube leakage On the 26th, power was reduced to 75% to facilitate-repairs on a leak developed in a Moisture Separator Reheater Drain Tank. 'On the'27th, while at 75% power, the reactor was tripped due to a turbine trip.

The turbine tripped from a high Steam Generator level, caused by a maintenance mechanic working on a feed flow instrument loop, which was providing an input to the automatic Steam Generator level control program.

The reactor was returned to 92% power on the 28th and remained at powerithrough the end of the reporting period.

M

f.

'I l

4 l

i i

y i

l i

~

t i

i

. B.

OPERATING DATA REPORT DOCKET NO.: 050-454 UNIT: -Byron One l

DATE:

1/10/86 COMPILED BY:

J.E. Langan TELEPHONE:

(815)234-5441 x2825 OPERATING STATUS 1.

Reporting Period:

December 1985. Gross Hours: 714 2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (Mie-net) 4 l

Max Dependable Capacity (MWe-net): Not DETERMINED I

3.

Power Level to Which Restricted (If Any): 1075 (Mie-gross).

4.

Reasons for Restriction (If Any):

Excessive S/G Moisture Carryover THIS MONTH YR TO DATE CUMUIATIVE j

5.

Number of Hours Reactor was Critical 327.5 1281.0 1281.0 6.

Reactor Reserve Shutdown Hours 16.1 16.1 16.1 7.

Hours Generator on Line 313.7 1192.4 1192.4 8.

Unit Reserve Shutdown Hours 0-0 0

9.

Gross Thermal Energy Generated (MWH) 799491 3339192 3339192 l

10. Gross Elec. Energy Generated (MWH) 256082 1088590 1088590

[

11. Net Elec. Energy Generated (MWH) 232386 1012898

.1012898

12. Reactor Service Factor 44.0-

-49.9 49.9

13. Reactor Availability Factor 46.2 50.5 50.5
14. Unit Service Factor 42.2.

46.4 46.4

15. Unit Availability Factor 42.2 46.4 46.4 4

16._ Unit Capacity Factor (Using MDC)

N/A

.N/A N/A

17. Unit Capacity Factor (Using Design MWe)'
18. Unit Forced Outage Rate 4.9 7.9 7.9
19. Shutdowns Scheduled Over Next 6 Months (Scheduled outage is in progress.) None
20. If Shutdown at End of Report Period, Estimated Date of Startup: 12/16/85
21. Units in Test Status (Prior to Commercial Operation): -None
22. Report Period Hours

-744.

256'9

-2569 l

- 23. Forced Outage Hours 16.1

.102.6 102.6-ACHIEVED

~

Initial Criticality 2-2-85 Initial Electricity.

3-1-85 c==arcial 0;;,eration 9-16-85 w-eN-u

m y*,c-im++@

- +-

y my+y-+,

g n

e.

p y

re.

ym r e.,--c g-p f--16

C.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE:

1/10/86 COMPILED BY:

J.E. Langan TELEPl!ONE:

(815)234-5441 x2825 MONTil: December, 1985 DAY AVERAGE DAILY p0WER LEVEL (MWe-Net) 1.

O MW 17.

O MW 2.

O MW 18.

90 MW 3.

O MW 19.

371 MW 4.

O MW 20.

658 MW 5.

O MW 21.

785 MW 6.

O MW 22.

943 MW 7.

O MW 23, 955 MW 8.

O MW 24, 966 MW 9.

O MW 25.

973 MW 10.

O MW 26.

879 MW 11.

O MW 27.

440 MW 12.

O MW 28, 205 MW 13.

O MW 29.

758 MW 14.

O MW 30.

959 MW 15.

O MW 31.

961 MW 16.

O MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Het for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical ruting of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/62M) l l-

              • en
      • e...........

R; port Period December, 1985 UNIT SHUTDOWNS / REDUCTIONS BYRON

                • ne***********eena.

No.

Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 5) 85/10/26 S

414.2 D 4

None N/A N/A Continued Scheduled outage for E.Q.

Modifications and Steam Generator Modifications.

6) 85/12/26 F

0.0 A

5 None MS MS2 Power reduction due to a gasket leak on MSR 2nd stage drain tank.

7) 85/12/27 F

16.1 B 3

85-101-00 FW Lvl Ch Auto Turbine Trip / Reactor Trip due to high level in the IB Steam Generator.

Instrument Mechanic was performing maintenance on a feedwater flow loop providing input into the Steam Generator level control.

occocemenesemen The Unit returned to power on December 17, 1985, after a 7 week scheduled outage.

0 Summary ococceeeeemenee TYPE Reason Method System & Component F-Forced A-Equip Failure. F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Cier Error 2-Manual Scram Instructions for C-Refueling H-Other_

3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

(0625M)

. ~.

E.

' UNIQUE REPORTING REQUIREMENTS

-1.

Safety / Relief valve operations for Unit One.

-VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION-

-CONDITION OF EVENT None I

i i

e I

t (0625M/62M) l-1

F.

LICENSEE EVENT REPORTS The following is a tabular sununary of all licensee event reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, December 1 through December 31, 1985. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Licensee Event Report Number Date Title of Occurrence 85-060-01 12-5-85

.RWST Temperature Above 100*F Due to Personnel Error 85-095-00 12-5-85 Inadvartent ESF Actuation of 1A Diesel Generator During Testing Due to Procedure Error i

L i

t i

i

January 10, 1986 LTR:

BYRON 86-0031 File:

2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.

20555 ATTN:

Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period December 1 through December 31, 1985.

Very truly yours, i

7

/

Q R. E. Querio Station Manager Byron Nuclear Power Station REQ /JEL/bb Enclosures cc:

J.G. Keppler, NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety D.P. Galle, CECO T. J. Maiman D.L. Farrar, CECO Nuclear Fuel Services, PWR Plant Support G. R. Benson, Revenue. Requirements INPO Records Center Thermal Group, Tech Staff Byron Station Nuclear Group, Tech Staff Byron Station J. Langan l

r