ML20141H493

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-43 & 50-364/85-43 on 851119-1218 & Notice of Violation
ML20141H493
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/09/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20141H497 List:
References
NUDOCS 8601140143
Download: ML20141H493 (2)


See also: IR 05000348/1985043

Text

f c~Q % 6A

: .

i

JAN O 91986

31abamaPowerCompany

/ ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

!

Gentlemen:

,

SUBJECT: REPORT NOS. 50-348/85-43 AND 50-364/85-43

i

On . November 19 - December 18, 1985, NRC inspected activities authorized by NRC

Operating License Nos. NPF-2 and NPF-8 for your Farley facilities. At the

%-

conclusion of the inspection, the findings were discussed with those mempers of

~

'

your staff identified in the enclosed inspection report.

.

! Areas examined during the inspection are identified in the report. Within these

l areas, the inspection consisted of selective examinations of procedures and

l representative records, interviews with personnel, and observation of activities

l

in progress.

l The inspection findings indi:: ate that certain activities violated NRC require-

l ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

1

l The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us,

i Sincerely,

I original signed by

David M. Verrelli

,

David M. Verrelli, Chief

Reactor Projects Branch 1

l Division of Reactor Projects

!- Enclosures:

! 1. Notice of Violation

2. Inspection Report Nos. 50-348/85-43

! and 50-364/85-43

cc w/encis: (See page 2)

'

8601140143 860109

i PDR ADOCM 05000348;

G PDR

,. t.

i

I

a______________. SEDI

M~

.

.

.

Alabama Power Company 2

JM 0 9 506

g w/encis:

, W 0. Whitt, Executive Vice President

d D. Woodard, General Manager -

Nuclear Plant

M.G.Hairston,-III,GeneralManager-

~

Nuclear Support

tg W. McGowan, Manager-Safety Audit

. j nd Engineering Review

W. G. Ware, Supervisor-Safety Audit

, .and Engineering Review

>

bec w/encls:

NRC Resident Inspector

Z Reeves, Project Manager, NRR

~

!

Document Control Desk

State of Alabama

l

I

e

i

RII RII

AJ n:cdg FCan

p/9 /86 #f/9 /86

= -

.