:on 860107,two Bolting Studs in Valve Flange MOV-SI-1890B Failed.Caused by Intergranular Stress Corrosion of Bolting Matl.Insp Conducted & Stud Matl Replaced,As Necessary
ML20141D055
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/31/1986
From: Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20141D059 List:
References
86-005A, 86-5A, LER-86-007, LER-86-7, NUDOCS 8604070385
Download: ML20141D055 (5)


LER-1986-007, on 860107,two Bolting Studs in Valve Flange MOV-SI-1890B Failed.Caused by Intergranular Stress Corrosion of Bolting Matl.Insp Conducted & Stud Matl Replaced,As Necessary
Event date:
Report date:
2801986007R00 - NRC Website

text

r Undated Report-Previous venor t 2/10/86 PON 28-06-01 esRC Pe.ae 30s u S. NuCLEM REGULt. TORY COMMitSeON APP 8 tow 13 Oue seO. 31t04104 LICENSEE EVENT REPORT (LE.'J F ACIUTY NAME 11)

Docati esuesSSR til faGE43 Surrv Fower Statlon. Unit 1 0 l51010 l 0 l2 I 810,1l0Fl0l4 TITLE tea Failure of Bolting Material in Valve Flanges EVENT DATE (El LER esuksetR ISI REPORT DATE (7)

OTHER F ACILITIEs INVOLVf D tal

M [ *'

7,*,"$

WONTH DAv vtAR Paceut r a awes DOCatt? Nvweta:El s

MONTH DAY YEAR TEAR 0 151010101 I I 0l1 0l 7 8

6 8l6 0 l 0l7

~

0l1 0l 3 3l1 8 l6 0 1 5 10 1 0 1 0 1 l l Tuis RarORT is suomiTTEc PURSUANT TO Tus REOuiRauiNT OP ie C,R g <C,*.

---. m P, nu "oo*

  • 30.ac2m a seem een wnH.

73.7 48 R

20,404faH1K0 to 38(eH11 00.734eH2)M 73.714el om 0 19 (7 30.seewmm 2

0,7,wtyg, Ag e0.3ewias so.73wczH c 30.406(aH1Hm) 90.734elGHal go.734aH2HvmHA)

J58Af 20.4084sH1HM 00.73teH2Hul OS 73talG)f.eelts; 20.asstellHM 90.73wt2)(m) to 78teH2Hal "VoluntarV" LICthSEE CONTACT POR TMis LER 1121 NAME TELEPHONS 8euwetR ARC A CODE R. F. Saunders. Station ?hnaner Al 014 11 'i 17 I -Il i 118 l'+

COMPLETE 048 LINE FOR EACH COMPONENT Pasture otacRiego s4 TMrs REPORT us!

"^

"A CAUS$

$YSTtw COwPONta ?

gf "I

CAUSE

$Ysitw COMPONENT g[

s T pera D pePR I

I I l i I l l

I I I I I I I

I I I I I I I

I I I I I I SuPPLibstitTAL REPORT EMPtCTf D (143 poseTH DAY YEAR tuewe$liosu Yli (,9 y.e. eeneen fx9tCTEO SuonrisssON DA tty 40 l

l l

40.TR ACT it-, M,.m a..

.. Ra

- n..

With Unit I at 97% on January 7, 1986, 2 bolting studs in *f0V-SI-1890B were observed to have failed. The f ailure mechanism was determined to be intergranular stress corrosion of 410 stainless steel stud material. An inspection of Unit 1 was conducted and stud material of valves containing etuda 2/4 inch diameter and greater, with the same natarial designation or t'iose stainless studs for which no material designation could be determined, were replaced.

An inspection and replacement program for Unit 2 has been completed also. This voluntary report is subnit ted for infornat ton.

A detailed report is attached. The bolting naterial was installed as part of valve bolting material design change issued in 1979.

a 8604070305 060331 K 21

{DR ADOCK 05000280 PDR Jj gg-- -

.u.0,oi O

.s,,m.

n

Updated Report-Previous Report 2/10/86 pou ?8-06 n1 we assa uo nuetaan aioutaron, c UCENSEE EVENT REPORT (LER) TEXT CONTINUATION

      • aovioo

=o.2,io.4,u exeians4:i se PaOLITY =aA84 (Il DOCEa7 meuteta ut gg w ag pg g OJ3:

"tt,rt' visa 0 11 o 12 0F o14 surry Power station. Unit 1 0151010 lo l ? l8 b 816 01017 rm,,-a wer maun Failure of Bolting Material in Valve Flanges 1.

Description of the Event With Unit No. 1 at 97% power, on January 7,1986 during a routine inspection, 2 stainless steel studs in a valve flange for the low head safety injection system were observed to have failed. A subsequent review of records and a walkdown revealed studs of the same material designation on other valves.

2.

Safety Consequences and Implications

A detailed engineering analysis, including chemical and metallurgical tests, was performed on the failed material. The subsequent engineering evaluation indicated that the failure mechanism would not cause valve flange f ailure or excessive Icakage as the adjacent studs would satisfactorily absorb the increased stress caused by the stud f ailures.

3.

Cause

A thorough metallurgical and chemical analysis of the f ailed studs and foreign material found on the studs indicated that the failure mechanism was stress corrosion cracking followed by rapid unstable crack growth af ter the critical flaw size was achieved. The bolting material was installed as part of a valve bolting material design change issued in 1979.

4.

Immediate Corrective Action

An inspection of records to identify the valves containing the questionable naterial and a visual walkdown of safety systems in Unit I was conducted. The studs in MOV-SI-1890B were replaced with ASTM A193 B7 type bolting material and an evaluation was initiated.

5.

Additional Corrective Action During the next maintenance outage, which commenced on January 24, 1986, e

an inspection of Unit i valves was conducted.

Studs of 3/4 itch diameter and greater of the material in question were replaced in critical plant systems.

An inspection and replacement of Unit 2 critical valves studs was completed during the February outage. A list of valves which had studs replaced is attached.

In addition, a testing program was initiated to determine the susceptability of suspected stud material of less than 3/4 diameter. A detailed report has been prepared and is attached.

u.3,em m,

Updated Report-Previous Report 2/10/86 POW 28-06-01

. enc Forum MSA U S. 8sUCLE AR REGULATORY -

UCENSEE EVENT REPORT (LER) TEXT CONTINUATION m aoveoowei.o mo+o.

exems. s wm FACILaiv snaast IM DOCKST 8euessam (2)

LER aguassG4186 Pa04 43 vsam stowe tea 6 me e,

Surry Power Station, Unit 1 o ls lo lo lo l2 l 8l0 8l6 0 l Ol 7 0l1 0 l3 0F 0 l4 rExr w

.as w awe r mm w on 6.

Action Taken to Prevent Recurrence Material of question is being replaced with AST't A193 B7 type bolting material. Stud replacement in critical systems has been completed for Units 1 and 2.

7.

Generic Implications As the stud material identified was procured to a unique Virginia Electric and Power Company specification, there appears to be no generic implication.

f*

f I

?

f esIC Femu 306A M3 i

UpdatedReport-PreviousRepOrt2/10/86 POW 28-06-01

.1 e - =A us uct.....vuro.u LICENSEE EVENT REPORT (LER) TEXT CONTINUATION

    • .aoveo owe =a >>so-oios exems awn l

FaCattiv asamIE 110 DOCmET Nuessen m tem seumssem lei PAGE130

'l'Jf,g

    • ampt6 vs..

0l4 0l1 0l4 Surry Power Station, Unit 1 o ls jo la lo l 2l8 l0 8l 6 0l0l7 or ruxt<n m

. = -.4

- ance mewnn Valve which had studs replaced with ASm A-193, B7 stud material 1-CH-312 1-SI-91 1-CH-430 1-SI-239 MOV-RC-1535 1-CH-309 MOV-RC-1536 1-SI-224 1-RC-63 1-SI-225 1-RC-24 1-SI-228 MOV-1720A 1-SI-229 l-SI-88 MOV-1865A 1-SI-94 MOV-1865B 1-SI-107 MOV-1865C 1-SI-109 1-RH-2 1-SI-128 1-RH-8 1-SI-238 1-RH-15 1-SI-240 1-RH-19 l-SI-243 1-RH-20 1-SI-130 1-RH-24 1-SI-145 RV-1721 1-CH-276 LCV-1115A PCV-ll45 MOV-1286A MOV-1289A MOV-1280L MOV-1370 MOV-CS-100A 1-CS-1 1-CS-4 MOV-CS-102A MOV-CS-102B l-CS-25 MOV-RS-155A MOV-RS-155B MOV-1860A MOV-1862A MOV-1862B MOV-1864A MOV-1864B MOV-1869B 1-SI-46A 1-SI-46B 1-SI-48 1-SI-57 1-CS-51 1-CS-12 1-CS-65 2-CH-230

.e...

o VIRGINIA ELECiniC AND POWER COMPANY Surry Power Station P. O. Box 315 Surry, Virginia 23883 Parch 31, 1986 U.S. Nuclear Regulatory Ccrmissicn Serial No:

86-005A Docunent Control Desk Docket No:

50-280 016 Phillips Building License No:

DPR-32 Washington, D. C.

20555 Gentlemen:

Pursuant to Surry Power Staticn Tedinical Specifications, Virginia Electric and Power Ccrpany hereby subnits the following Licensee Event Report update for Surry Unit 1.

REPORT NLMIER 86-007-01

'Ihis report has been reviewed by the Staticn Nuclear Safety and Operating Ccximittee and will be reviewed by Safety Evaluaticn and Ccntrol.

Very truly yours, R. F. Saunders d Staticn Manager Enclosure cc: