ML20140H068

From kanterella
Jump to navigation Jump to search
Requests That Wording of SR 4.5.2.j Be Modified by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water, in Encl Suppl to TS
ML20140H068
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/06/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140H073 List:
References
W3F1-97-0087, W3F1-97-87, NUDOCS 9705120324
Download: ML20140H068 (4)


Text

.O Ente gy operatisno,Inc.

Killona, LA 70066 -

Tel 504 739 6242 l r C. Ewing, til J a Safety & Regulatory Affairs W3F1-97-0087 l A4.05  ;

PR l

l May 6,1997 I U.S. Nuclear Regulatory Commission Attn.: Document Control Desk )

Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Supplement to Technical Specification Change Request NPF-38-192 l l

Gentlemen- I Technical Specification Change Request NPF-38-192 was submitted via letter W3F1-97-0054 on March 27,1997. Please find attached a supplement to Technical l Specification Change Request NPF-38-192. This supplement was developed based on telephone conversations held with your staff on Thursday, April 10,1997.

Technical Specification Change Request NPF-38-192 added surveillance e requirement 4.5.2.b.2 to verify the ECCS piping is full of water at least once per 31 l days. In order to maintain consistency within the specification, we request that the wording of surveillance requirement 4.5.2.j be modified by replacing "... venting the ECCS pump casings and discharge piping high points." with "... verifying the ECCS  ;

piping is full of water."

Therefore, please make the wording change as indicated on the attached. This is l purely an editorial change to maintain consistency within the specification and has no l affect on the no significant hazards evaluation previously provided.

1

'\

9705120324 970506 PDR ADOCK 05000382- Th \

p ,

PDR V\ 4

. l X

in

4 i .

Supplement to Technical Specification Change Request NPF-38-192 W3F1-97-0087 Page 2 l May 6,1997

! Should you have any questions or comments concerning this request, please contact Mr. Paul Caropino at (504) 739-6692. j i

Very truly yours, 7

k'

'J l E.C! Ewing Director, Nuclear Safety & Regulatory Affairs ECE/DBM/ssf Attachments: Affidavit TS Pages i J

cc: E.W. Merschoff, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident inspectors Office Administrator Radiation Protection Division (State of Louisiana)

American Nuclear Insurers

UNITED STATES OF AMERICA i

, NUCLEAR REGUl.ATORY COMMISSION in the matter of )

)

Entergy Operations, Incorporated- ) Docket No. 50-382 Waterford 3 Steam Electric Station )

AFFIDAVIT Early Cunningham Ewing, being duly sworn, hereby deposes and says that he is Director, Nuclear Safety & Regulatory Affairs - Waterford 3 of Entergy Operations, Incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Supplement to Technical Specification Change Request NPF-38-192; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief. '

D

'Earlytunninghahl Ewing "

Director, Nuclear Safety & Regulatory Affairs -

Waterford 3 STATE OF LOUISIANA )  :

) ss PARISH OF ST. CHARLES )

Subscribed and sworn to before me, a Notary Public in and for the Parish and State

~

above named this .c ' day of "' .1997.

. -. , *A

/

, 7CLn, < c AN Notary Public My Commission expires I d .

1 1

l l

I W3F1-97-0087 l l

SUPPLEMENT TO 1

1 i NPF-38-192 ]

I ATTACHMENT 1

1 J