ML20140H073

From kanterella
Jump to navigation Jump to search
Requests That Wording of SR 4.5.2.j Be Modified by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water, in Encl Suppl to TS
Date released: 06/02/2020 Download: ML20140H073


Proposed Tech Specs Modifying Wording of SR 4.5.2.j by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water.
ML20140H083
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/06/1997
From:
ENTERGY OPERATIONS, INC.
To:
References
Download: ML20140H083 (1)
Requests That Wording of SR 4.5.2.j Be Modified by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water, in Encl Suppl to TS
ML20140H068
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/06/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20140H068 (4)