ML20140D145

From kanterella
Jump to navigation Jump to search

Forwards Application for Amend to License NPF-3,changing Tech Specs Clarifying Station Review Board Duties & Responsibilities.Separate Amend Application Being Prepared to Address Addl Administrative Changes.Fee Paid
ML20140D145
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1986
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20140D152 List:
References
1235, TAC-61468, NUDOCS 8601290198
Download: ML20140D145 (2)


Text

i TOLEDO Docket No. 50-346 JOE VVILUAMS JR.

License No. NPF-3 Sermar Vce Presdeot-Nudes' M19} 249 2300 M'91249 5223 Serial No. 1235 January 22, 1986 Mr. John F. Stolz, Director PWR Project Directorate No. 6 Division of PWR Licensing - B United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed changes involve Sections 6.5.1.3, 6.5.1.6a-j, 6.5.1.7a-d, 6.5.3, 6.8.2 and 6.8.3.

The changes in Sections 6.5.1.6 and 6.5.1.7 are being requested to revise and clarify the Station Review Board (SRB) duties and responsibilities.

Part of these changes involve removal of the technical review aspect of SRB evaluations. This change will allow the SRB to concentrate their review on the safety-related aspect of proposed changes on matters relating to nuclear safety in cases where an unreviewed safety question does not exist. This change has been enhanced by the addition of a Technical Review and Control Section 6.5.3. These changes, while not conforming to the Standard B&W Technical Specifications, have previously been approved by the NRC at other operating nuclear power plants.

The phrase "to serve on a temporary basis" is being removed from Section 6.5.1.3, as it is an undefined term. Changes in Sections 6.5.1.6k and j 6.5.1.7a and 6.5.1.7c on position titles are being requested to conform to administrative organizational changes already in place at Toledo Edison. These position title changes are included, where necessary.

for consistency with the position titles utilized in the SRB revision discussed above. Toledo Edison is preparing a separate amendment application for submittal to the NRC which will address the rest of the administrative organizational changes in Section 6.0.

8601290198 860122 9

gj /p PDR ADOCK 05000346 g gh 9 P PDR

'l sf THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OH!O 43652

)

1 Dock:t,No. 50-346 License No. NPF-3 i Serial No. 1235 January 22, 1986 Page 2 Toledo Edison requests that this amendment be expeditiously issued by the NRC to support Toledo Edison's timely transition to this improved management process.

Enclosed is a check for $150.00 as required by 10 CFR 170.12(c) for a license amendment.

Very truly yours, h ti +

JW:DBI:lah attachment ec: DB-1 NRC Resident Inspector State of Ohio i