j r-t v-Cp&L Carohna Power & Light Company SHEARON HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, North Carolina 27562 FEB 2 81996 t,
File Number:
SHF/10-13510E NRC-418 -
Letter Number: HO-860236 (0)
Gj Dr. J. Nelson Crace United States Nuclear Regulatory Commission q)
Region II 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30323 cn to CAROLINA POWER & LICHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 DEFECTIVE WELDS ON 480V SWITCHCEAR, P.O. NY-435171 ADDENDUM NO. 1 TO FINAL REPORT - ITEM 104
Dear Dr. Grace:
Attached is Addendum No. I to the Final 10CFR50.55(e) Report issued to the NRC on March 28, 1985 for the above subject item.
This addendum addresses the concern identified in Inspection Report RII: CAH 50-400/85-22.
If you have any questions regarding this matter, please contact me.
Yours very truly, 64__
AT.
atson 1
Vice President Shearon Harris Nuclear Power Plant MW:cwj Attachment cc:
Mr. C. Maxwell (NRC-SHNPP)
Mr. J. M. Taylor (NRC) 9603210219 860229 PDR ADOCK 05000400 S
PDR NBI-OSI If 3:527 g
c
'M.
SHEARON HARRIS NUCLEAR POWER PLANT
-UNIT NO. 1 DEFECTIVE WELDS ON 480V SWITCHCEAR ADDENDUM NO. 1 TO FINAL REPORT - ITEM 104 ISSUED MARCH 28, 1985 FEBRUARY 24, 1986 During an audit by the NRC of our 10CFR50.55(e) files, a question was raised in regard to the above subject. The NRC inspector questioned the justification for accepting several welds which-were not reinspected due to being covered with a coating of-shellac. In response to_the inspector's concern CP&L reviewed the method of evaluation of the shellac covered welds. Based on the
. concern, CP&L removed the coatings on the critical welds on one of-the six safety related switchgears. Results of this inspection revealed no significant deficiencies in weld quality. Subsequent-qualification' testing and analysis was performed utilizing the-weld configuration and quality of the as-built condition. The equipment.was shown to bc seismically adequate based.on the final qualification report.
NBI-OSI.