q r-s VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH July YEAR 1985 (Revised 08-23-85)

APPROVED:

ST4TI0i MANAGER b

8511190085 850913p DR ADOCK O

UNIT. SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 08-05-85 REPORT MONTH July COMPLETED BY' Brenda Garner TELEPHONE (703) 894-5151 X2527 l

Ns.

Date

' Type Duration Reason 2. Method of Licensee

' System Component Cause & Corrective (Hours)

Shutting' ven de Code Action to 3

4 5

Down Reactor Report #

Prevent Recurrence 85-37 850701 S

NA H-5 NA NA NA Ramped down to 88% power for load follow. Unit returned to 100% power.

85-38 850702 S

NA' H

5 NA NA NA Ramped down to 68% power for load follow. Unit returned to 100% power.

85-39 850725 F

86.7 A

1 Ramped Unit 2 off line for LER 85-008-00 AB ISV high Reactor Coolant System unidentified leakage. Unit returned to 100% power.

  • REVISED 1

2.

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions

.S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)