Forwards Insp Repts 50-324/85-38 & 50-325/85-38 on 851101-30.No Violation or Deviation Noted
ML20138Q749
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/18/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20138Q750 List:
References
NUDOCS 8512270459
Download: ML20138Q749 (1)


See also: IR 05000324/1985038

Text

-_

, 't *

DEC161985

Carolina Power and Light Company

vATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602-

Gentlemen:

SUBJECT: REPORT NOS. 50-325/85-38 AND 50-324/85-38

-

On November ~ 1-31, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-71 and DPR-62 for your Brunswick Steam Electric Plant. At the

conclusion of the inspection, the findings were discussed with those members of

your staf_f identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

'Within the scope of the inspection, no violations or deviations were identified.

1

Should you have any questions concerning this letter, please contact us.

Sincerely,

9 P. P A

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

,

Enclosure:

'

Inspection Report Nos. 50-325/85-38

and 50-324/85-38

cc w/ encl:

' y .pW. Howe, Vice President

Brunswick Nuclear Project

g R. Dietz, Plant General Manager

bec w/ encl:

/ RC Resident Inspector

Document Control Desk

State of North Carolina

,

RII RI ;

LM e$Ijw PFredrickson

12/15/85 12/(/85

0512270459 851218 8l0

FDR ADOCK 05000324

O PDR Icef