ML20138Q749
| ML20138Q749 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/18/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20138Q750 | List: |
| References | |
| NUDOCS 8512270459 | |
| Download: ML20138Q749 (1) | |
See also: IR 05000324/1985038
Text
-_
, 't
DEC161985
Carolina Power and Light Company
vATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602-
Gentlemen:
-
SUBJECT: REPORT NOS. 50-325/85-38 AND 50-324/85-38
On November ~ 1-31, 1985, NRC inspected activities authorized by NRC Operating
License Nos. DPR-71 and DPR-62 for your Brunswick Steam Electric Plant. At the
conclusion of the inspection, the findings were discussed with those members of
your staf_f identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
'Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
1
Sincerely,
9
P. P A
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
,
Enclosure:
Inspection Report Nos. 50-325/85-38
'
and 50-324/85-38
cc w/ encl:
p
' y . W. Howe, Vice President
Brunswick Nuclear Project
g R. Dietz, Plant General Manager
bec w/ encl:
/ RC Resident Inspector
Document Control Desk
State of North Carolina
,
RII
RI ;
LM
e$Ijw
PFredrickson
12/15/85
12/(/85
0512270459 851218
8l0
FDR
ADOCK 05000324
O
Icef