CD&L Carolina Power & Light Cpmfany 17 P 3 : 5 2 P. O. Box 165, New Hill, North Carolina 27562 December-11,.1985 FILE: SH N-2/18 MQAH 85-375

-Item 217

Dr.-J. N. Grace United' States Nuclear Regulatory Commission Region II Suite 2900-101 Marietta Street, NW

' Atlanta, Georgia. 30323 lSHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 INSTRUMENT RACKS - INCORRECT' BOLTING MATERIAL

Dear Dr. Grace:

This is to confirm the December 10, 1985 telephone conversation between

Mr.

N.' J. Chiangi (CP&L) and Mr. L. Mellen.

Mr. Mellen was informed that

'the September 9, 1985 potentially reportable item, pertaining to incorrect bolting materials used 'in Mercury instrument' racks, has been evaluated and considered to. be not reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.

Thank you.for your consideration in this matter.

Yours very truly, r).

1 NJC/mt.

N. J ChJ ang Manager cc:

Mr. G. Maxwell Quality As r nee / Quality Control Mr. J. M. Taylor Harris Plant i

h2 204 851211 w

S DCM OSO O

d

.