i Table 3.7-3 SAFETY RELATED llYDRAULIC SNUBBERS" SNUBBER SYSTEM SNUBBER INSTALLED ACCESSIBLE OR IIIGil l' ADI ATION ESPECIALLY DIFFICULT NO.
ON, LOCATION *
- AND ELEVATION INACCESSIBLE ZONE'
TO REMOVE (A or I)
(Yes or No)
(Yes or No)
u EFil-II U RB 115'-0" I
No No J
EFil-14L RB 115'-0" I
No No EFil-15U RB 115'-0" i
No No 1
EFil-15L RB 115'-0" i
No No EFil-27 RB2 II 5'-9" I
Yes Yes 4
EFil-28 RB2 145'-9" I
Yes Yes EFil-92 IB 140'-0" A
No No EFil-93 IB 131'-8" A
No No u)
EFil-94 IB 131'-8" A
No No EFil-95 IB 11 0'-0" A
No No 4
m i
6 EFil-96 IB 141'-3" A
No No EFil-106 IB 1 ff l'-3" A
No No EFH-107 IB l t 1'-3" A
No No 4
EFil-108 IB 1 t l'-3" A
No No i
EFil-109 IB 133'-0" A
No No
{
EFil-Il0 IB 133'-0" A
No No 1
EFil-141 IB 126'-6" A
No No EFil-143 IB 133'-6" A
No No EFil-144 IB 141'-3" A
No No j
EFil-534 IB 109'-0" A
No No 1
EFil-54 i L IB 109'-0" A
No No EFil-541U IB 109'-0" A
No No EFil-543 IB 109'-0" A
No No 4
pu2988ls'mg2 P
4
4 ELECTRICAL POWER SYSTEMS i
SURVEILLANCE REQUIREMENTS (Continued) 4.
At least once per 18 months, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for I hour when the battery is subjected to a battery service test.
4 5.
At least once per 60 months, by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test.
This performance discharge test shall be performed subsequent to the satisfactory completion of the required battery service test.
4.3.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
)
a.
At least once per 31 days on a STAGGERED TEST BASIS by:
1 1.
Verifying the fuel level in the day fuel tank, l
2.
Verifying the fuel level in the fuel storage tank, 3.
Verifying the fuel transfer pump can be started and transfers fuel from l
the storage system to the day tank, j
4.
a.
Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm in less than or equal to 10 seconds,
- or b.
Verifying the diesel starts and can be accelerated to at least 900
- RPM, i
5.
Verifying the generator is synchronized, loaded to greater than or equal to 1500 kw, and operates for greater than or equal to 60 minutes, and 6.
Verifying the diesel generator is aligned to provide standby power to the j
associated emergency busses.
1
]
b.
At. lent once each 92 days by verifying that a sample of diesel fuel from the i
fuel storage tank is within the acceptable limits specified in Table 1 of ASTM I
D975-68 when checked for viscosity, water and sediment.
i c.
At least once per 18 months, by:
1.
Subjecting the diesel to an inspection in accordance with procedures i
prepared in conjunction with its manufacturer's recommendations for this class of standby service, l
- The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests.
All other engine starts, for the purpose of this surveillance testing may be preceeded by an engine prelube period and/or F
other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
j CRYSTAL RIVER - UNIT 3 3/43-4
l l
3/4.8 ELECTRICAL.POWE9 SYSTEMS 1
I BASFS The OPERABILITY of tne A.C. and D.C. power sources and associated distribution systers during operation ensures that sufficient power will be available to y
supply the safety related equipment required for 1) the safe shutdown of the 4
facility and 2) the mitigation and control of a'ccident conditions within the facility. The minicum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design l
Criterion 17 of Appendix "A" to 10 CFR 50.
i I
she ACTION requirements specified for the levels of degradation of the power i
sources provide restriction upon continued facility operation commensurate with the level of cegradation.
The OPERABILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon mair.taining at-least one of each of the onsite A.C. and D.C.
power sources and associated distribution systems OPERABLE during accident conditions coincider.t with an assumed loss of offsite power and single failure of the other onsite A.C. source.
For the purposes cf the monthly diesel generator start testing, " ambient condition" means tr.e diesel engine coolant and oil are being continuoi./ly circulated and maintained at a temperature consistent with the manufacturer's recommendations.
The OPERABILITY of the minimum specified A.C.
and D.C.
power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown and refueling condition i
for extended time periods and 2) sufficient instrumentation and control I
capability is availa le for monitoring and maintaining the facility status.
j J
1 4
)
i CRYSTAL RIVER - UNIT 3 B 3/4 8-1 t
i l