ML20138N432
| ML20138N432 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/18/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20138N436 | List: |
| References | |
| NUDOCS 8512240002 | |
| Download: ML20138N432 (1) | |
See also: IR 05000414/1985057
Text
'
- (
e.
. . . .
LDEC181985
~
,
F
- Duke Power. Company
N: -Mr. HI B. Tucker, Vice' President
' Nuclear:Froduction' Department
-
~422 South Church Street-
^ Charlotte, NC "28242
1 Gentlemen:
'
m
-
.
.
.
r'
SUBJECT: . REPORT N0.'50-414/85-57.
-On November 12-15,.1985, NRC: inspected activities authorized by NRC Construction-
L Permit No~. CPPR-117 for your Catawba facility. At the conclusion of the inspec--
. tion,~ 'the findings were discussed with' those members of your staff identified in *
.the' enclosed inspection rep' ort.
Areas examined during the inspection are idantified.in the report. Within these
areas, ethe>-inspection 1 consisted of selective examinations of procedures and
,
Jrepresentative1 records; interviews with personnel, and observation of activities
in progress.
,
Withi.n the scope.of the' inspection,'~no violations or deviations were identified.
-Should you have any questions concerning this letter, please contact us.
Sincerely,
..
f
a
,
Virgi1 L. Brownlee, Chief
.
Reactor Projects Branch 2
- Division of Reactor Projects
~
Enclosure:
'
Inspection Report.No. 50-414/85-57
~
-tX_ ,w/ enc 1:'
cc
. L. Dick, Vice President - Construction
[ .!Hampton', Station Manager
bcp w/ enc 1:
g.N.~~Jabbour,'NRR-
,,,
- Document Control Desk
' ;2Stjte of South Carolina-
LNRC; Resident Inspector
- RII [
R
[~
RII
~
.MThomas:cdg p.FJape
ARHe t
-
L12//4/85
12//t,/85
12//f/85
"
%ggea<EEE 8Qr '
.
.
'
'
.220l
'