ML20138M602

From kanterella
Jump to navigation Jump to search
Forwards LERs 85-019-00 & 85-020-00
Date released: 05/31/2020 Download: ML20138M602


:on 850927,following Controlled Shutdown Due to Hurricane Gloria,Iodine Spike Discovered.Caused by Known Fuel Element Defects in Reactor Core.Level of Dose Equivalent I-131 Monitored Per Tech Spec Table 4.1-2B
ML20138M619
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/25/1985
From: Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML20138M619 (3)
:on 850927,individual Rod Position Indicator for Two Rods Inoperable.Spurious Incorrect Rod Position Indication Is Generic Westinghouse PWR Concern.Portion of Sys Outside Containment Tested & No Problems Found
ML20138M612
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/25/1985
From: Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML20138M612 (3)
Forwards LERs 85-019-00 & 85-020-00
ML20138M600
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/25/1985
From: Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20138M600 (1)