ML20138M278
| ML20138M278 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 02/21/1997 |
| From: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Reda R GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20138M280 | List: |
| References | |
| TAC-L30933, NUDOCS 9702250316 | |
| Download: ML20138M278 (2) | |
Text
-
February 21, 1997 a
Dr. Ralph J. Reda Manager,. Fuels and Facility Licensing General Electric Company P.O. Box 780, MC J26 Wilmington, NC 28402 i
SUBJECT:
REVISED RADIOLOGICAL CONTINGENCY AND EMERGENCY PLAN (TAC NO. L30933)
Dear Dr. Reda:
In accordance with your application dated December 17, 1996, and pursuant to 4
Part 70 of Title 10 of the Code of Federal Regulations, Materials License SNM-1097 is hereby amended to authorize modifications to the Radiological Contir.gency and Emergency Plan.
These changes were submitted pursuant to the requirements of 10 CFR Part 70.32 and NRC agrees that they do not decrease the effectiveness of your plan.
Accordingly, Safety License Condition S-3 is revised to read as follows:
S-3 The licensee shall maintain and execute the response measures in the Radiological Contingency and Emergency Plan, Revision 3, dated December 17, 1996; or as further revised by the licensee consistent with 10 CFR 70.32(i).
All other conditions of this license shall remain the same.
Enclosed are copies of the revised Materials License SNM-1097 and the Safety Evaluation Report, which includes the Categorical Exclusion determination.
Sincerely, Original signed by:
Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1113 License SNM-1097 j
Amendment 55
Enclosures:
- 1. Materials License SNM-1097
- 2. Safety Evaluation Report DISTRIBUTION:
(Control No. 8 DOS-Fee Exempt)
Docket 70-1113 PUBLIC NRC File Center Region II NMSS r/f FCSS r/f FCLB r/f SH0 CBassett, RII PMDA WSchwink, FCOB BHorn, FRIB KHardin Og*
M.
FCLB N
OFC FCLB 6
FCLB I
FCLB_ /
FCLB NAME Nck:
PShea0b3 Mlaka'stra Id, kMFWeber 2/ 0 /97 2/k/97 DATE 2//+797 2/d/97 2/k/97
/
\\
C =, COVE,R,
E = COVER & ENCLOSURE N = NO COPY 9702250316 970221 PDR ADOCK 07001113 C
UNITED STATES g
.)
NUCLEAR REGULATORY COMMISSION
)
WASHINGTON, D.C. 20666-0001
\\*****p#
February 21, 1997 j
1 Dr. Ralph J. Reda Manager, Fuels and Facility Licensing 1
I General Electric Company P.O. Box 780, MC J26 Wilmington, NC 28402
SUBJECT:
REVISED RADIOLOGICAL CONTINGENCY AND EMERGENCY PLAN (TAC NO. L30933)
Dear Dr. Reda:
In accordance with your application dated December 17, 1996, and pursuant to Part 70 of Title 10 of the Code of Federal Regulations, Materials License SNM-1097 is hereby amended to authorize modifications to the Radiological l
Contingency and Emergency Plan. These' changes were submitted pursuant to the requirements of 10 CFR Part 70.32 and NRC agrees that they do not decrease the effectiveness of your plan.
)
Accordingly, Safety License Condition S-3 is revised to read as follows:
S-3 The licensee shall maintain and execute the response measures in the Radiological Contingency and Emergency Plan, Revision 3, dated December 17, 1996; or as further revised by the licensee consistent with 10 CFR 70.32(i).
All other conditions of this license shall remain the same.
Enclosed are copies of the revised Materials License SNM-1097 and the Safety Evaluation Report, which includes the Categorical Exclusion determination.
Sincerely, hfr2 Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1113 License SNM-1097 Amendment 55 1
Enclosures:
- 1. Materials License SNM-1097
- 2. Safety Evaluation Report j
I