ML20138L696
| ML20138L696 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/24/1985 |
| From: | Zwolinski J Office of Nuclear Reactor Regulation |
| To: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20138L701 | List: |
| References | |
| CON-NRC-03-82-096, CON-NRC-3-82-96 GL-83-28, LSO5-85-10-031, LSO5-85-10-31, NUDOCS 8510310385 | |
| Download: ML20138L696 (3) | |
Text
l act t 4198s Decket No. 50-219 DISTRIBUTION LS05-85 031 TDocket File "s ACRS(10)
NRC' PCR ^
ABourina Mr. P. B. Fiedler LPDR GHolahan Vice President and Director ORBh5 Rdg JKramer Oyster Creek Nuclear Generating Station HThompson Post Office Box 388 OELD Forked River, New Jersey 0F731 EJordan EGrirres
Dear Mr. P. B. Fiedler:
JParticw JDerobew CJamerson
SUBJECT:
DRAFT TECliNICAL EVALUATION REPORT (TER) FOR SALEf' ATWS ITEM 1.2 (GENERIC LETTER E3-28)
Pe:
Oyster Creek P'uclear Generating Station The staff has completed a preliminary review to assess the corrpleteness and adequacy of licensee responses to Generic Letter 83-28 Ittn 1.2.
For Oyster Creek, your response was found to be inccrplete in four of the areas evaluated.
The enclosed Draft Technical Evaluation Perort (DRAFT TER) generated by the staff's contractor provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
In order to meet cur present review schedule, we would appreciate your cooperation in obtaining additional information thet will permit us to complete our review.
It would appear that the needed infortration on your facility could be obtained by telephone conference within two weeks of your receipt of the enclosed PPAFT TER.
Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.
The reporting and/or recordkeeping recuirerrents contained in this letter affect fewer than ten respondents; therefore, CP:B clearance is not required under P.L.96-511.
Sincerely, Ort.,.aol eipad by i
8510310385 851024 DR ADOCK O 29 p
John A. Zwolinski, Chief l
Operating Reactors Branch i;o. 5 1
Division of Licensing
Enclosure:
i I
DPAFT TER on Oyster Creek ATWS Item 1.2 i
i cc w/ enclosure:
See next page i
i DL:0RB#5[
DL p' 5
DL:0RB#5 w:tm JZwolinski CJamerso:
10/jj/85
/
85 10/tA/85 y--*--
b---mwer++
-rw
-wea w--T-p ppc-+d W,W pw-i era-9 enw m---ge.ee-+-.ywwy
, - + - - -%%w-te---s.e t-y---y-y9 ge>=v--Mt-wm+,Wtrrtv---+yT+ &-
- r-p-
0 "%,%
l UNITED STATES 3,
NUCLEAR REGULATORY COMMISSION o
p W ASHINGTON. D. C. 20555
%,,,g #
Ocotber 24, 1985 Docket No. 5C-219 LS05-85-10-031 Mr. P. B. Fiedler Vice President and Director Oyster Creek Nuclear Generating Station Pcst Office Box 388 Forked River, New Jersey 08731
Dear Mr. P. B. Fiedler:
SUPJECT:
DRAFT TECHNICAL EVALUATION REPORT (TER) FOR SALEM ATWS ITEll 1.2 (GENERIC LETTEP P3-28)
Pe:
Oyster Creek Nuclear Generating Statier.
The staff has completed a preliminary review to assess the completeness er.d adeouacy of licensee responses to Generic Letter 83-28 Item 1.2.
For Oyster Creek, your response was found to be inccmplete in four of the creas i
evaluated.
The enclosed Draft Technical Evaluation Report (DRAFT TEP) cererated by l
the staff's contractor provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
Ir order to meet our present review schedule, we would appreciate yetr cccreration in obtaining additional information that will permit us to corplete our review.
It would appear that the needed information or ycer facility could be obtained by telephone conference within two weeks cf ycur receipt of the enclosed DRAFT TER. Your project manager will be workinc with you to arrange an acceptable time to conduct the necessary ccnference calls.
The reporting and/or recordkeeping requirements contaired in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely,
./
\\.
John
. Zwolinski, Chief Opera ing Reactors Branch No. 5 Division of Licensing Erclosure:
DPAFT TER on Oyster Creek ATWS Item 1.2 cc w/ enclosure:
See next page
Mr. P. B. Fiedler Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station cc:
G. F. Trowbridge, Esquire Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W.
Post Office Box 445 Washington, D.C.
20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator, Region 1 Division of Environmental Quality U.S. Nuclear Regulatory Commission Department of Environmental 631 Park Avenue Protection Kingiof Prussia, Pennsylvania 19406 380 Scotch Road Trenton, New Jersey 08628 BVP Licensing Manager GPU Nuclear 100 Interpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked Piver, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 i
i l
I
,..,.., - -~,,,,,,---,
,,,,,,,.,-,--,,,---n.,,,
- -..