ML20138G949
ML20138G949 | |
Person / Time | |
---|---|
Site: | 02700039 |
Issue date: | 10/02/1985 |
From: | Richard Lee NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | Knapp M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
References | |
NUDOCS 8510280097 | |
Download: ML20138G949 (2) | |
Text
V DISTRIBUTION: 3013.1
) . .
[ ]WMsf
, WMGT rf NMSS rf OCT 021sas RBrown<ne SHEFFIELD TRIP REPORT f1 Bell
-1_ MX PJustus RLee & rf LHi inbothan MEMORANDUM FOR: Malcolm Knapp, Chief he kr M Pm a .,
Geotechnical Branch JShaffner OccLei Nn. 2 /- f /
Division of Waste Management DGoode pgg _ g LPDR " " ~V ~
FROM: Richard Lee, Project Manager Dkt@Wiant - ~~
Geology / Geophysics Section -
Geotechnical Branch (Return to WM. 623 SS)
SUBJECT:
TRIP REPORT: SHEFFIELD LLW FACILITY', SEPTEMBER 18-19,1985 -~ ~ g e" The purpose of this trip was to visit the LLW disposal facility at Sheffield, IL, to observe features of the facility, and to observe groundwater monitoring activities being conducted by Oak Ridge National Laboratory staff. NRC trip participants include Jim Shaffner, Dan Goode, and Richard Lee. Persons contacted at the site include: Mark Bowen, Patrick Seger, and Doug Long from U.S. Ecology, Melanie Hamel and Bob Williamson from Illinois Department of Nuclear Safety, Dick Ketelle, Keith Brown, and Kenny Edwards from Oak Ridge National Laboratory, and Dayne Brown from North Carolina Department of Radiation Safety.
Jim Shaffner and I arrived at the Sheffield site about noon on September 18.
We first visited the Illinois State Geological Survey (ISGS) prototype trench study. location south of the site. We were met there by a ISGS staff member who was monitoring and servicing the various tensiometers and neutron probes inserted into each of the four trench prototypes that comprise the study. Only background data is being obtained at this time due to the dry weather conditions of the last few months, but infiltration data is expected to be obtained when the fall rains begin.
Next, we walked the western shore of the strip mine spoil lake to the east of the site. The purpose was to have a look at reported outcrops of the ' pebbly sand" of t' Toulon Member of the Glasford Formation which is suspected to be the principle unit through which tritium is migrating from the site. We found nothing that resembled ~the written descriptions of that unit or that could be considered to resemble the " pebbly sand". It appears to me that all of that material has been disturbed and displaced during past strip mining activities.
T%re appears, at this time, to be little regulatory importance in not seeing the Nebbly sand", despite some disappointment in not seeing it.
Later thct afternoon, we toured the facility with the U.S. Ecology site manager, Mark Bowen, and Dayne Brown of the state of North Carolina. The site was largely well-vegetated and mowed. Isolated areas of non-vegetation are present on some trenches where, we were told, areas of recent subsidence had WM Reccid file M Pro b ;l - c -
8510280097 051002 9 g g,,3 , g , _ __ , _ _
AMCK O27
$FC : (M , , ,
_____:____________:____________:_______ ..__:____________:____________:__________ p p __________
p _
[ FAME: DistribWign
_____:.___________:___.._______:.___________:_____ ...___r.___________: ___________:._____..___
' ATE :85/09/26 D : : : : : I : TZ me e vm 6) i
~
SHEFFIELD TRIP REPORT
_2 been filled. Although seeded, those areas have not yet developed a vegetative cover. Some minor rill erosion is evidenced, especially on the north face of Trench 14A (see NUREG/CR-1759, Vol.1, for location of Trench 14A). Animal burrows were seen in isolated areas on the trench tops and sides. There may be a correlation between burrow locations and locations of minor surface cracking, but at this time this does not appear to be a matter of great regulatory importance.
Throughout that day and portions of the followirg morning, we observed the monitoring well sampling process being conducted by Oak Ridge National Laboratory under the direction of Dan Goode. Although the physical process of sampling appeared tedious and exhaustive, it appeared that satisfactory samples were being obtained. .
On the morning of the 19th, Mark Bcwen took us through the USGS tunnel on the south end of the site. The tunnel is a corrugated metal pipe with a large number of sampling instruments positioned in various places throughout its length. Since the tunnel is completely contained, there is no possible access i
to the material surrounding it beneath the site and, subsequently, no observational information was obtained about that n.aterial. Information obtained from the tunnel is, thus, constrained by the resolution of the instrumentation.
As with my trip to thei Beatty, NV site, the U.S. Ecology staff at the Sheffield site were courteous, helpful, and professional. They appear to be sincere in their efforts to run a tight ship.
Richard Lee, Project Ma:ager Geology / Geophysics Section Geotechnical Branch I
~
hho l
L pFC. . . :WM . . _ _ _G_T W $: : : : :
g_ME:
gA : * * * *
- R PJustus g.___:.__......___:._______._:_..________.:...__.......:___...___............................
Lee:d1
- ATE
- 85//a/ o.a. : 85/10/e> : : *
- L