Forwards Suppl SE Rept Re Plant Resolution of USI A-46 as Delineated in GL 87-02.NRC Determined That Based on Results of Turkey Point Units 3 & 4 Insp,Separate Insp at St Lucie Unit 1 Not Warranted
ML20138F388
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 09/19/1996
From: Wessman R
NRC (Affiliation Not Assigned)
To: Berkow H
NRC (Affiliation Not Assigned)
Shared Package
ML20136C539 List: ... further results
References
FOIA-96-485, REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9609230156
Download: ML20138F388 (2)


Text

_. _ _ _

September 19, 1996 MEMORANDUM.FOR:

81erbert N. Birkow, Director 3

- Project Directorate 11-2

~~

Division of Reactor Projects I/II FROM:

Richard H. Wessman, Chief Mechanical Engineering Branch /S/

Division of Engineering

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION REPORT OF ST LUCIE UNIT 1 AND TURKEY POINT UNITS 3 AND 4, RESOLUTION OF UNRESOLVED SAFETY ISSUE (USI) A-46

provides the Mechanical Engineering Branch's (EMEB) supplemental safety evaluation report (SSER) of the Florida Power and Light Company's, the licensee, resolution of USI A-46 as delineated in Generic Letter (GL) 87-02, for St. Lucie Unit I and Turkey Point Units 3 and 4.

This SSER provides the results of the staff audit conducted at the Turkey Point site during the week

)

of December 4-8, 1995.

The purpose of the audit was to verify that the j

licensee's implementation program adequately addressed the open items described in the staff's safety evaluation report (SER) dated February 9, 1995. This SSER incorporates the inputs from Civil Engineering and Geosciences Branch, Reactor Systems Branch, and Instrumentation and Controls Branch.

Based on the information reviewed during the audit, the staff reached closure on all of the SER open items.

Further, the licensee agreed to take corrective actions regarding specific findings identified by the staff.during the audit.

These findings are described in the attached SSER, and will be tracked by the NRC's resident inspectors at St. Lucie Unit I and Turkey Point.

Finally, based on the results of the Turkey Point Units 3 and 4 inspection, the staff determined that a separate inspection at the St. Lucie Unit 1 is not warranted.

Docket Nos.: 50-250/251

Attachment:

As stated CONTACT:

P. Y. Chen, NRR 415-2789 Distributton:

Central file EMEB RF/CHRON BSheron Glainas KManoly bat h==

PYChen HAshar KDesai JNorris RCroteau DDorman CAder MDrouin JChen 1

DOCUMENT NAME: G:\\Chen\\ Turkey.SE Tm recifve a copy of this document, indicate in the box C=Copr w/o attaq)qent/ enclosure E= Copy with attachment / enclosure N = No copy i

OUICE EMEB:DE EMEB:DE 6 ECGB:DFs hj bF, EMEB:pE E

WE PYChen:jb KManol[ IRodn M hi RWessb

! )/$/96

'f/ I'/96 DATE 09/12/96*

9 /G/96 f /4 /96

{g /,

0FFICIAL RiCORD COPY yILlf ]

y& - y t$ Jpp,

  1. "*mDB mac ME CENTER COPY 4

\\

i 3

MEMORANDUM FOR:

4erbert N. Berkow, Director Project Directerate 11-2 Division of Reactor Projects I/II FROM:

Richard H. Wessman, Chief Mechanical Engineering Branch Division of Engineering i

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION REPORT OF ST LUCIE UNIT 1 AND TURKEY POINT UNITS 3 AND 4, RESOLUTION OF UNRESOLVED SAFETY ISSUE (USI) A-46 i

Attachment I provides the Mechanical Engineering Branch's (EMEB) supplemental safety evaluation report (SSER) of the Florida Power and Light Company's, the licensee, resolution of USI A-46 as delineated in Generic Letter (GL) 87-02, for St. Lucie Unit I and Turkey Point Units 3 and 4.

This SSER provides the results of the staff audit conducted at the Turkey Point site during the week of December 4-8, 1995. The purpose of the audit was to verify that the licensee's implementation program adequately addressed the open items 4

described in the staff's safety evaluation report (SER) dated February 9, 1995. This SSER incorporates the inputs from Civil Engineering and Geosciences Branch, Reactor Systems Branch, and Instrumentation and Controls Branch.

Based on the information reviewed during the audit, the staff reached closure L

on all of the SER open items.

Further, the licensee agreed to take corrective actions regarding specific findings identified by the staff during the audit.

These findings are described in the attached SSER, and will be tracked by the NRC's resident inspectors at St. Lucie Unit I and Turkey Point.

j Finally, based on the results of the Turkey Point Units 3 and 4 inspection, the staff determined that a separate inspection at the St. Lucie Unit 1 is not warranted.

Docket Nos.: 50-250/251

Attachment:

As stated CONTACT:

P. Y. Chen, NRR 415-2789 Distribution:

Central File EMEB RF/CHRON BSheron Glainas KManoly j

RRothman PYChen HAshar KDessi JNorris RCroteau DDorman CAder MDrouin JChen DOCUMENT NAME: G:\\Chen\\1urkey.SE T3 receive a copy of this doctment, Indicate in the box Cscope w/o attachment /enetosure E Ccpy with attp6hment/ enclosure N = No copy 0FFICE EMEB:DE E

EMEB:DE 6

ECGB:DE ECGB:DE SRXBhRCM PYChen:j hKManoly Y RRothman GBagchi RJonesY m

T/$96 7//2-/96

/ /96

/ /96

//[9k DATE

\\

HICB:kRCH /

EMCB:DE 0FFICE JWermeM RWessman m

DATE

/

6\\

/ /96

/

OFFICIAL RECORD COPY I

)