l September 16,1996 t
i l
MEMORANDUM TD:
Frederick J. Hebdon, Director Project Directorate !!-3 j
Division of Reactor Projects I/II FROM:
L. A. Wiens, Project Manager Project Directorate II-3 Division of Reactor Projects
SUBJECT:
REVIEW OF 10 CFR 50.59 REPORT AND REVISION 10 TO UPDATED j
FINAL SAFETY ANALYSIS REPORT (UFSAA) FOR ST. LUCIE UNIT 2 j
(TAC NOS. M96268 AND M96299) 44 By letters dated July 3, and July 5,1996, Florida Power and Light Company i
submitted Revision 10 to the St. Lucie Unit 2 UFSAR and the required report of j
plant changes and modifications made under In CFk 50.59. Both the UFSAR j
revision and the 10 CFR 50.59 report revered the period April 23, 1994 to j
January 5, 1996.
I have completed a review of both of these submittals, including a verification of the performance of a 10 CFR 50.59 evaluation for each significant UFSAR change. Since the 10 CFR 50.59 report only includes a brief l
description and summary of the safety evaluations, a conclusion as to the j
adequacy of the safety evaluations was not made. However, a number of safety i
evaluations were identified for detailed review during a site inspection scheduled for February 1997, as well as several UFSAR changes for which a 50.59 evaluation could not be identified. The results of the site inspection will be included in the monthly rasident inspection report. This completes action on TAC Nos. M96268 and M96299.
Docket No. 50-389 l
Distribut'on Docket.H1 e j
St. Lucie Reading i
l 4
l
- C MEceu7m 00CLMENT NAME: G:\\STLUCIE/UFSAR Ts resolve a espy of ele desiamnt, leufleste in the ham:
"C" a Capr without attachment /enetosure i
"W" e Copy with atteshment/enetosure "r a me copy optics post s/LA I
potl s/pa,
Ic pois s/s Ic, I
masa seierten teZu tusene 17N re nen W oate oe/y, /96 o'// 6M op/I( /96 officlAt escano coPT 3- / 3-D