ML20138E855

From kanterella
Jump to navigation Jump to search

Forwards SE Authorizing Implementation of Code Case N-532, Alternative Requirements to Repair & Replacement Documentation Requirements & Inservice Summary Rept Preparation & Submission as Required by IWA-4000 & 6000
ML20138E855
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/13/1995
From: Bagchi G
NRC (Affiliation Not Assigned)
To: Norris J
NRC (Affiliation Not Assigned)
Shared Package
ML20136C539 List: ... further results
References
FOIA-96-485 TAC-M93297, TAC-M93298, NUDOCS 9510250085
Download: ML20138E855 (1)


Text

..

4 OCT 1319h MEMORANDUM TO:

Jan A. Norris, Project Manager Project Directorate 11-1 Division of Reactor Projects I, II E

FROM:

Goutam Bagchi, Chief Civil Engineering and Geosciences Branch Division of Engineering

SUBJECT:

EVALUATION OF THE SECOND TEN-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUEST FOR RELIEF REGARDING CODE CASE N-532 FOR ST LUCIE NUCLEAR PLANT, UNITS 1 AND 2 The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has reviewed and evaluated the information provided by Florida Power and Light Company in its letter dated August 11, 1995, related to the second ten-year interval inservice inspection program plan request for relief regarding the implementation of Code Case N-532 for the St. Lucie Nuclear Plant, Units 1 and 2.

The staff's evaluation and conclusions are contained in the attached safety evaluation. is a SALP input related to this task. This submittal completes the technical review to be performed by the Civil Engineering and Geosciences Branch under TAC Nos. M93297 and M93298.

Docket Nos.:

50-335 and 50-289 Attachments: As stated CONTACT:

Tom McLellan, DE/ECGB 415-2716 Distribution:

eWTMP99%"P" ECGB RF/PF G.C. Lainas, w/o att G.C. Millman, RES j

M.T. Anderson, INEL DOCKET NAME: G:\\MCLELLAN\\STLUCIE.TKM n

g rugge t, indiente in the boa c=c w w/o attac h t/ enclosure E=c w with I

y of this 0FFICE DE:ECGB C

SC:DE:ECGB E

BC GB C

NAME TMcLellaW DTerao k

IBagchi DATE 10/ B/95 10//4/95 10/O/95 T - n -3 7 '/4*J L OFFICIAL RECORD C0)Y

}US SOO W b f' w

% N.k b