f May 16, 1995 MEMORANDUM T0:
David B. Matthews, Project Director (0-14-019)
Project Directorate II-2 Division of Reactor Projects - 11 FROM:
Margaret S. Chatterton Reactor Systems Branch Division of Systems Safety and Analysis
SUBJECT:
ST. LUCIE UNITS 1 AND 2 - RELOCATION OF INCORE INSTRUMENT REQUIREMENTS (TAC N05. M91406 AND M91407)
Plant Name:
St. Lucie Units 1 and 2 Utility:
Florida Power & Light Company TAC No(s).:
M91406 and M91407 Docket No(s).:
50-335 and 50-389 Project Directorate:
Project Directorate 11-2 Project Manager:
J. Norris Review Branch:
SRXB Review Status:
Complete By letter dated January 20, 1995 Florida Power & Light Company requested changes to the Technical Specifications for St. Lucie Units No. I and No. 2.
These proposed changes will relocate Technical Specifications 3/4.3.3.2 to the Updated Final Safety Analysis Report, and revise Linear Heat Rate surveillance 4.2.1.4, and Special Test Exceptions surveillance 4.10.2.2, 4.10.4.2 (Unit 2 only), and 4.10.5.2, accordingly.
j The Reactor Systems Branch has reviewed these proposed changes and finds them acceptable, however justification for changes to the number and distribution of incore detectors operable should be carefully documented. Our SER (Enclosure 1) details the necessary elements to be considered if changes to the number and distribution of incore detector locations operable for measurement of core power limits are made.
Our SALP evaluation is provided in attachment 2.
This completes the SRXB effort on TAC Nos. M91406 and M91407.
Amentments: As stated cc w/ enclosure:
M. Virgilio PEB/SALP (10A-19)
Contact:
M. Chatterton, SRXB/DSSA 415-2889 SRXB:DSSA,j SRXB:DSSA g x,
BHALLUMS V MCHATTERTON 5/,,/95 5//, /95 G:\\STL91406 DISTRIBUTION:
Docket File SRXB R/F EWeiss MChatterton MChatterton r/f RJones NRC FILE CENTER COPY
, _...e_ r. ~.
s
-