October 21, 1985 Docket No. 50-413 VIA TELECOPY October 21, 1985 DISTRI8UTION:
Docket File-
" NRC PDR ~
~
Mr. H. 8. Tucker, Vice President local PDR Nuclear Production Department PRC System Duke Power Company NSIC -
422 South Church Street LB #4 r/f Charlotte, North Carolina 28242 MDuncan KJabbour
Dear Mr. Tucker:
0 ELD, Attorney ACRS (16)
Subject:
Emergency Technical Specification Change -
JPartlow Catawba Nuclear Station Unit 1 BGrimes EJordan By letter dated October 18, 1985, you requested an emergency change to Technical Specification 3.4.6.2 which would extend, by 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the time allowed in Mode 3 with unidentified reactor coolant system leakage greater than 1 GPM. This extension provides increased opportunity for leakage paths to be identified for correction.
This is to confirm that on Friday, October 18,1985/weauthorized,via telephone, this 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> extension. We are presently processing the requested change.
Sincerely, Original signed bya Thomas M. Novak Thomas M. Novak, Assistant Director for Licensing Division of Licensing cc: See next page DZSIC:in z3 3 7g g.