March 24, 1993 MEMORANDUM FOR:
Herbert N. Berkow, Project Director Project Directorate 11-2 Division of Reactor Projects II FROM:
C. H. Berlinger, Chief Electrical Engineering Branch Division of Engineering Technology
SUBJECT:
ST. LUCIE 1.- UNDERVOLTAGE RELAY SETPOINT CHANGES (TAC NO. M85122) l Plant Name:
St. Lucie Unit 1 Utility:
Florida Power and Light Company Docket Nos.:
50-335 i
Licensing Status: OR Project Direct.:
PD II/DRP Project Manager:
J. Norris d
Review Branch:
EELB/DE Review Status:
Complete By letter dated November 30,1992, Florida Power & Light Company requested approval of the Technical Specification changes to Tables 3.3-3, 3.3-4, and i
4.3-2 which would allow them to change the setpoints for the emergency bus
~
undervoltage protection scheme during both accident and non-accident I
conditions. The staff has reviewed the licensee's submittal and has concluded that the licensee has provided adequate justification for these changes and the changes are, therefore, acceptable. The enclosed evaluation completes action on TAC No. M85122. is the SALP input for this r,avle t.d By Cutsi.e... agar Carl H. Berlinger, Chief Electrical Engineering Branch Division of Engineering Technology
Enclosure:
As stated Distribution cc:w/ enclosure EELB Rdg. File Eric Weiss J. E. Richardson N.K. Trehan (PF)
A. S. Gill B. D. Liaw D. F. Thatcher M PNesom J. Norris C. H. Berlinger G. Zech (SALP only)
St. Lucie S/F
Contact:
N. K. Trehan 504-2777 BC/ EEL @B/E r ' m b *l R C
k EELB/DE g SC/EELB l
NTrehan DThatche CHBerlinger 3/15/93 3/17/93 3//f/93