r~

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 10-3-85 COMPLETED BY Il Grnhnm TELEPHONE ona m_n486 OPERATING STATUS Crystal River Unit 3 N05

1. Unit Name:
2. Reporting Period:

9-1-85 30-85 2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted,1f Any (Net MWe): N/A
10. Reasons For Restrictions.lf Any; e

This Month Yr..to.Date Cumulative

11. Hours in Reporting Period aon nss1 7497s
12. Number Of Hours Reactor Was Critical 648.3 74?0.7 4R336.4 0 0 1280.3
13. Reactor Resene Shutdown Hours 592.5 2288.3 47206.1
14. Hours Generator On-Line '
15. Unit Reserve Shutdown Hours
16. Gross Therma 1 Energy Generated (MWH) 1344R6' 4375511 106037396 .
17. Gross Electrical Energy Generated (MWH) 448146 , _ . 1482167 36209379
16. Net Electrical Energy Generated (MWH) 428674 1398552 34394563 82.3 % 34.9% 63.0 %
19. Unit Service Factor
20. Unit Availability Factor 82.3 % 34.9 % G3.0%
21. Unit Capacity Factor (Using MDC' Net) 72.5% 26.0 % 57.6 %

72.2 % 25.9% 55.6 %

22. Unit Capacity Factor (Using DER Net) 8.5% 9.fi% 19.7 %
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:

.N/A

25. If Shut Down At End Of Report Period.Estimatsd Date of Startup: 10-4-85
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 1-14-77, l-30,77
  • INITIAL ELECTRICITY COMMERCIAL OPER ATION 3-1J-77 8510150357 851008 PDR ADOCK 05000302 .

R PDR (9/77)

AVE R AGE D AILY l' Nil P0hER LEVEL DOCKET NO. 50-302 LJNIT FLCR P-3 DATE 10-2-85 COMPLETED BY n n. mumm TELEPHONE 904 795-3802 MONTH September 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mwe-Net) (MWe-Net) g 460 37 voo 629 gg 795 2

635 39 796 3

4 671 20 798 5 578 21 808 0 22 808

- 6 s 7.

0 -

23 7804 3 416 24 796 9 747 25 809 10 75R 26 802 33 769 27 735 775 28 0 12 78S 0 13 29 793 0

,4 30 796 0 15 31 16 _~

709 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to

'the nearest whole megawatt.

. (9/77)

\_. .

i i

> Q v .

I

. DOCKET NO.

50-3(E UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME rr en o-? .

DATE 10-2-85 COMPLETED BY S. Stewart REPORT MONTH 9/85 TELEPHONE gg; 73,,333;

_ 5 E jg Cause & Currective 3 j 7 ~- Licensee E-r, gwt Action tit No. Ihte h .,g R 2 5 ac Event g?

mO g3U presens Recurrence H

[I E j ;?3 Report # ti g d5 850001 0.0 H 5 N/A ZZ 7ZZZZZ llold at reduced power for Iteactor Physics 85-14 S testing.

850905' F 50.8 A 5 N/A IIB Turbin liigh pressure Turbine casing steam leak.

85-15 F 4.2 A 5 N/A IIB Valvex Steam leak in high pressure Turbine drain 85-16 850908 valve.

S 72.7 F 2 N/A IIA Genera Generator Ilydrogen cooling system blades 85-17 850927 were incorrectly installed. Blades must be repositioned for proper hydrogen cooling.

I 3 4 I 2 F: Forced Reason: Method: Exhibit G . Instructites A Equipment Failure (Explain) 1-Manual for Preparation of Data 5: Scheduled B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3-Automatic Scram. Event ReporI(LER) File (NURI G.

D-Regulatory Restriction 40ther (Explain) 0161)

. EOperator Training & Ucense Examination F Administrative 5 G-Operational Error (Explain) Exhibit 1. Same Source 19/77) IIO:her(Explain) 1

i; MONTHLY OPERATIONAL SIRMARY STATD1Eh7 5

DOCKET NO. 50-302 UNIT FLCRP-3

'DATE 10-2-85 COMPLETED BY S. Stewart TELEPHONE 904 795-3802 MONTH' September 1985 SUMMART STATEMENT:

Crystal River 3 operated with I power reduction for Reactor Physics Testing and 3 Outages during the September report period.

~

t S

a.

I l

L