OPERATING DATA REPORT DOCKET NO.
50-302 DATE 10-3-85 COMPLETED BY Il Grnhnm TELEPHONE ona m_n486 OPERATING STATUS N05 Crystal River Unit 3
- 1. Unit Name:
9-1 9-30-85
- 2. Reporting Period:
2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions.lf Any; e
This Month Yr..to.Date Cumulative aon nss1 7497s
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 648.3 74?0.7 4R336.4 0
0 1280.3
- 13. Reactor Resene Shutdown Hours 592.5 2288.3 47206.1
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therma 1 Energy Generated (MWH) 1344R6' 4375511 106037396
- 17. Gross Electrical Energy Generated (MWH) 448146 1482167 36209379 428674 1398552 34394563
- 16. Net Electrical Energy Generated (MWH) 82.3 %
34.9%
63.0 %
- 19. Unit Service Factor 82.3 %
34.9 %
G3.0%
- 20. Unit Availability Factor 72.5%
26.0 %
57.6 %
- 21. Unit Capacity Factor (Using MDC' Net) 72.2 %
25.9%
55.6 %
- 22. Unit Capacity Factor (Using DER Net) 8.5%
9.fi%
19.7 %
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:
.N/A 10-4-85
- 25. If Shut Down At End Of Report Period.Estimatsd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1-14-77, l-30,77 INITIAL ELECTRICITY 3-1J-77 COMMERCIAL OPER ATION 8510150357 851008 PDR ADOCK 05000302 R
PDR (9/77)
AVE R AGE D AILY l' Nil P0hER LEVEL DOCKET NO.
50-302 LJNIT FLCR P-3 DATE 10-2-85 COMPLETED BY n
- n. mumm 904 795-3802 TELEPHONE September 1985 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mwe-Net)
(MWe-Net) g 460 37 voo 629 795 2
gg 796 635 39 3
671 20 798 4
5 578 21 808 0
808 6
22 s
7.
23 7804 0
3 416 24 796 9
747 25 809 10 75R 26 802 33 769 27 735 12 775 28 0
78S 0
13 29 793 0
,4 30 796 0
15 31 709 16
_~
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to
'the nearest whole megawatt.
(9/77)
\\_.
i iQ v
I 50-3(E DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME rr en o-?
DATE 10-2-85 S. Stewart COMPLETED BY REPORT MONTH 9/85 TELEPHONE gg; 73,,333; 5
E Licensee E-r, gwt Cause & Currective jg 3
j 7 ~-
Action tit No.
Ihte h
.,g R
2 5 ac Event g?
g3
[I E
j ;?3 Report #
ti mO U
presens Recurrence H
g d5 85-14 850001 S
0.0 H
5 N/A ZZ 7ZZZZZ llold at reduced power for Iteactor Physics testing.
85-15 850905' F
50.8 A
5 N/A IIB Turbin liigh pressure Turbine casing steam leak.
85-16 850908 F
4.2 A
5 N/A IIB Valvex Steam leak in high pressure Turbine drain valve.
85-17 850927 S
72.7 F
2 N/A IIA Genera Generator Ilydrogen cooling system blades were incorrectly installed. Blades must be repositioned for proper hydrogen cooling.
I I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructites 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event ReporI(LER) File (NURI G.
D-Regulatory Restriction 40ther (Explain) 0161)
. EOperator Training & Ucense Examination F Administrative 5
G-Operational Error (Explain)
Exhibit 1. Same Source 19/77)
IIO:her(Explain) 1
i; MONTHLY OPERATIONAL SIRMARY STATD1Eh7 5
DOCKET NO.
50-302 UNIT FLCRP-3
'DATE 10-2-85 COMPLETED BY S. Stewart TELEPHONE 904 795-3802 MONTH' September 1985 SUMMART STATEMENT:
Crystal River 3 operated with I power reduction for Reactor Physics Testing and 3 Outages during the September report period.
~