Monthly Operating Rept for Sept 1985
ML20138B424
Person / Time
Site: Crystal River 
Issue date: 09/30/1985
From: Graham D, Stewart S
FLORIDA POWER CORP.
To:
Shared Package
ML20138B400 List:
References
NUDOCS 8510150357
Download: ML20138B424 (4)


Text

r~

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 10-3-85 COMPLETED BY Il Grnhnm TELEPHONE ona m_n486 OPERATING STATUS N05 Crystal River Unit 3

1. Unit Name:

9-1 9-30-85

2. Reporting Period:

2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions.lf Any; e

This Month Yr..to.Date Cumulative aon nss1 7497s

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 648.3 74?0.7 4R336.4 0

0 1280.3

13. Reactor Resene Shutdown Hours 592.5 2288.3 47206.1
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Therma 1 Energy Generated (MWH) 1344R6' 4375511 106037396
17. Gross Electrical Energy Generated (MWH) 448146 1482167 36209379 428674 1398552 34394563
16. Net Electrical Energy Generated (MWH) 82.3 %

34.9%

63.0 %

19. Unit Service Factor 82.3 %

34.9 %

G3.0%

20. Unit Availability Factor 72.5%

26.0 %

57.6 %

21. Unit Capacity Factor (Using MDC' Net) 72.2 %

25.9%

55.6 %

22. Unit Capacity Factor (Using DER Net) 8.5%

9.fi%

19.7 %

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:

.N/A 10-4-85

25. If Shut Down At End Of Report Period.Estimatsd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1-14-77, l-30,77 INITIAL ELECTRICITY 3-1J-77 COMMERCIAL OPER ATION 8510150357 851008 PDR ADOCK 05000302 R

PDR (9/77)

AVE R AGE D AILY l' Nil P0hER LEVEL DOCKET NO.

50-302 LJNIT FLCR P-3 DATE 10-2-85 COMPLETED BY n

n. mumm 904 795-3802 TELEPHONE September 1985 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (Mwe-Net)

(MWe-Net) g 460 37 voo 629 795 2

gg 796 635 39 3

671 20 798 4

5 578 21 808 0

808 6

22 s

7.

23 7804 0

3 416 24 796 9

747 25 809 10 75R 26 802 33 769 27 735 12 775 28 0

78S 0

13 29 793 0

,4 30 796 0

15 31 709 16

_~

INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to

'the nearest whole megawatt.

(9/77)

\\_.

i iQ v

I 50-3(E DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME rr en o-?

DATE 10-2-85 S. Stewart COMPLETED BY REPORT MONTH 9/85 TELEPHONE gg; 73,,333; 5

E Licensee E-r, gwt Cause & Currective jg 3

j 7 ~-

Action tit No.

Ihte h

.,g R

2 5 ac Event g?

g3

[I E

j ;?3 Report #

ti mO U

presens Recurrence H

g d5 85-14 850001 S

0.0 H

5 N/A ZZ 7ZZZZZ llold at reduced power for Iteactor Physics testing.

85-15 850905' F

50.8 A

5 N/A IIB Turbin liigh pressure Turbine casing steam leak.

85-16 850908 F

4.2 A

5 N/A IIB Valvex Steam leak in high pressure Turbine drain valve.

85-17 850927 S

72.7 F

2 N/A IIA Genera Generator Ilydrogen cooling system blades were incorrectly installed. Blades must be repositioned for proper hydrogen cooling.

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructites 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event ReporI(LER) File (NURI G.

D-Regulatory Restriction 40ther (Explain) 0161)

. EOperator Training & Ucense Examination F Administrative 5

G-Operational Error (Explain)

Exhibit 1. Same Source 19/77)

IIO:her(Explain) 1

i; MONTHLY OPERATIONAL SIRMARY STATD1Eh7 5

DOCKET NO.

50-302 UNIT FLCRP-3

'DATE 10-2-85 COMPLETED BY S. Stewart TELEPHONE 904 795-3802 MONTH' September 1985 SUMMART STATEMENT:

Crystal River 3 operated with I power reduction for Reactor Physics Testing and 3 Outages during the September report period.

~

t S

a.

I l

L