Two Corrected Pages to Monthly Operating Rept for Aug 1985
ML20138B420
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1985
From: Stewart S
FLORIDA POWER CORP.
To:
Shared Package
ML20138B400 List:
References
NUDOCS 8510150356
Download: ML20138B420 (2)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

4 MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 9/4/85 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH August 1985 i

i SU N RY STATEMENT: Crystal River 3 ended its fifth refueling outage on August 20 at 0309. After startup, the high pressure turbine experienced two steam leaks in the same drain line. The plant was manually tripped at approximately 25% power during the first steam leak.

The second plant trip was due to high RCS pressure because of sluggish feedwater control. 'During startup, the plant reduced 1

power to conduct turbine testing.

]

r i

i PDR ej}ktti

i i-(

l 2

f KE F NO, -

UNIT SilUTDOWNS AND FOWER REDUCTIONS DA1E Jldlf5 COMI't.ETED BY 43._Ste_watr1_ _

REPORT MONill 8/85 TELEril0NE 1904)795-3802 i

3 Came A Corvettive 5g 3

E

I kentec E -e, g".

Attism to No.

Dtte g

Mg n

3m Event

'g 3 pu dI E

jg Repswt #

in U Present Returrente g

H 6

85-09 850308 S

459.I C

4 NA NA NA itefueling Outnge.

85-10 850820 F

9.3 A

3 NCOlt 85-174

'IIJ PIPEXX Stenm lenk in IIP turbine drain line.

85-1I 850820 F

7.3 II 3

NCOlt 85-175 IA INSTitU Itenctor t rip on liigh IICS pressure.

85-12 850821 F

172.7 A

5 NA liJ PIPEXX Steam lenk in llP turbine drain line.

85-13 850828 S

3.4 11 5

NA ZZ 7,7,7,Z7 Z Itedirce<I power for turbine testing.

3 4

t 2

Methad:

E xhibit G - Insteus tions F: renced Reason:

I Mann I for Preparation of Dai S: Scheduled A Fquipment Tsifure(Euplain)

B. Maintenance of Test 2 Manual Scram.

Entes Sheef t fov I.kenter 3 Avtomatic Scism.

Event Rerewi 11.1 R)Iile (NitRI G-C Refiveling D Reguistoey Restriction

&Other (Emplaini 01611 E-Operator Testning A Ucense Examination 5

F-Administrative Ethibit I - Same Sourse G-Operstlunal Eeror (Explain) l't/77)

II Other (Ewrisin) v

--