Two Corrected Pages to Monthly Operating Rept for Aug 1985
ML20138B420
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1985
From: Stewart S
FLORIDA POWER CORP.
To:
Shared Package
ML20138B400 List:
References
NUDOCS 8510150356
Download: ML20138B420 (2)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ _ _ _ _

4 MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 9/4/85 COMPLETED BY S. A. Stewart

' TELEPHONE (904) 795-3802 MONTH August 1985 i

i SU N RY STATEMENT: Crystal River 3 ended its fifth refueling outage on August 20 at 0309. After startup, the high pressure turbine experienced two steam leaks in the same drain line. The plant was manually tripped at approximately 25% power during the first steam leak.

The second plant trip was due to high RCS pressure because of 1

sluggish feedwater control. 'During startup, the plant reduced power to conduct turbine testing.

]

r i

i PDR ,

ej}ktti

i i-(

l 2

f KE F NO, -

UNIT SilUTDOWNS AND FOWER REDUCTIONS DA1E Jldlf5 COMI't.ETED BY 43._Ste_watr1_ _

REPORT MONill 8/85 TELEril0NE 1904)795-3802 i

, 3 _

-.,. 5g 3 E I kentec E -e, g". Came A Corvettive

'g 3 pu Attism to No. Dtte g Mg n ;3m Event Present Returrente H

dI E jg Repswt # in U g

6 850308 S 459.I C 4 NA NA NA itefueling Outnge.

85-09 85-10 850820 F 9.3 A 3 NCOlt 85-174 'IIJ PIPEXX Stenm lenk in IIP turbine drain line.

F 7.3 II 3 NCOlt 85-175 IA INSTitU Itenctor t rip on liigh IICS pressure.

85-1I 850820 85-12 850821 F 172.7 A 5 NA liJ PIPEXX Steam lenk in llP turbine drain line.

S 3.4 5 NA ZZ 7,7,7,Z7 Z Itedirce<I power for turbine testing.

85-13 850828 11 3 4 t 2 E xhibit G - Insteus tions Reason: Methad:

F: renced I Mann I for Preparation of Dai S: Scheduled A Fquipment Tsifure(Euplain) Entes Sheef t fov I.kenter 2 Manual Scram.

B. Maintenance of Test C Refiveling 3 Avtomatic Scism. Event Rerewi 11.1 R)Iile (NitRI G-

&Other (Emplaini 01611 D Reguistoey Restriction E-Operator Testning A Ucense Examination 5

F-Administrative Ethibit I - Same Sourse G-Operstlunal Eeror (Explain) l't/77) II Other (Ewrisin)