ML20083M935 | 12 April 1984 | Xcel Energy Warembourg D | Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418 | Other |
ML20084H457 | 25 April 1984 | Xcel Energy Warembourg D | Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion Regreased | Other |
ML20084P594 | 7 May 1984 | Xcel Energy Warembourg D | Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon Request | Other |
ML20092D927 | 15 June 1984 | Xcel Energy Warembourg D | Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as Ref | Other |
ML20093J117 | 20 July 1984 | Xcel Energy Lee O | Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety Question | Request |
ML20094R400 | 9 August 1984 | Xcel Energy Warembourg D | Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930 | Other |
ML20096C908 | 20 August 1984 | Xcel Energy Warembourg D | Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv Listed | Other |
ML20107K230 | 18 October 1984 | Xcel Energy Warembourg D | Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture Measurements | Other |
ML20112D736 | 14 December 1984 | Xcel Energy Warembourg D | Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods Necessary | Other |
ML20106B613 | 31 January 1985 | Xcel Energy Warembourg D | Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results | Meeting |
ML20106B579 | 31 January 1985 | Xcel Energy Gahm J | Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW Warembourg | Other |
ML20132G502 | 12 March 1985 | Bennett D LOS ALAMOS NATIONAL LABORATORY Fly G Fugelso L | Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart | Other |
ML20128N286 | 20 May 1985 | Xcel Energy Warembourg D | Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & Inspected | Other |
ML20126C521 | 23 May 1985 | Xcel Energy Warembourg D | Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable | Other |
ML20127K137 | 7 June 1985 | Xcel Energy Warembourg D | Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests Negative | Other |
ML20127N695 | 14 June 1985 | Xcel Energy Brey H | Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys | Other |
ML20138A855 | 2 July 1985 | Office of Nuclear Reactor Regulation | Safety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for Restart | Approval |
ML20138A807 | 2 July 1985 | Thompson H Office of Nuclear Reactor Regulation | Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart | Approval |
ML20132G450 | 8 July 1985 | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | Forwards Safety Evaluation Re Pcrv Prestressing Tendon Wire Corrosion Problems.Submittals & 0614 Acceptably Resolve Concerns.Lasl Evaluation Rept Encl | Approval |
ML20132G476 | 8 July 1985 | Office of Nuclear Reactor Regulation NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | Safety Evaluation Re Pcrv Tendon Corrosion Investigation & Proposed Remedy.Tendon Surveillance Proposal Acceptable | Approval |
ML20235N112 | 9 July 1987 | Office of Nuclear Reactor Regulation Heitner K | Forwards Lasl Technical Evaluation Rept, Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Rept | Other |
ML20154A542 | 30 August 1988 | Office of Nuclear Reactor Regulation Heitner K | Requests Addl Info Re Rev 7 to Schedule Commitment Items on Pcrv Tendon Surveillance Involving Provision of Schedule for Conducting Evaluation within 45 Days for Pcrv Tendon Degradation | Other |