ML20083M93512 April 1984Xcel Energy
Warembourg D
Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418Other
ML20084H45725 April 1984Xcel Energy
Warembourg D
Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion RegreasedOther
ML20084P5947 May 1984Xcel Energy
Warembourg D
Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon RequestOther
ML20092D92715 June 1984Xcel Energy
Warembourg D
Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as RefOther
ML20093J11720 July 1984Xcel Energy
Lee O
Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety QuestionRequest
ML20094R4009 August 1984Xcel Energy
Warembourg D
Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930Other
ML20096C90820 August 1984Xcel Energy
Warembourg D
Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv ListedOther
ML20107K23018 October 1984Xcel Energy
Warembourg D
Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture MeasurementsOther
ML20112D73614 December 1984Xcel Energy
Warembourg D
Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods NecessaryOther
ML20106B61331 January 1985Xcel Energy
Warembourg D
Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp ResultsMeeting
ML20106B57931 January 1985Xcel Energy
Gahm J
Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW WarembourgOther
ML20132G50212 March 1985Bennett D
LOS ALAMOS NATIONAL LABORATORY
Fly G
Fugelso L
Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain RestartOther
ML20128N28620 May 1985Xcel Energy
Warembourg D
Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & InspectedOther
ML20126C52123 May 1985Xcel Energy
Warembourg D
Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly QuestionableOther
ML20127K1377 June 1985Xcel Energy
Warembourg D
Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests NegativeOther
ML20127N69514 June 1985Xcel Energy
Brey H
Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical SysOther
ML20138A8552 July 1985Office of Nuclear Reactor RegulationSafety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for RestartApproval
ML20138A8072 July 1985Thompson H
Office of Nuclear Reactor Regulation
Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After RestartApproval
ML20132G4508 July 1985Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Forwards Safety Evaluation Re Pcrv Prestressing Tendon Wire Corrosion Problems.Submittals & 0614 Acceptably Resolve Concerns.Lasl Evaluation Rept EnclApproval
ML20132G4768 July 1985Office of Nuclear Reactor Regulation
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Safety Evaluation Re Pcrv Tendon Corrosion Investigation & Proposed Remedy.Tendon Surveillance Proposal AcceptableApproval
ML20235N1129 July 1987Office of Nuclear Reactor Regulation
Heitner K
Forwards Lasl Technical Evaluation Rept, Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final ReptOther
ML20154A54230 August 1988Office of Nuclear Reactor Regulation
Heitner K
Requests Addl Info Re Rev 7 to Schedule Commitment Items on Pcrv Tendon Surveillance Involving Provision of Schedule for Conducting Evaluation within 45 Days for Pcrv Tendon DegradationOther