TAC:54639
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Initiation
Questions Answers Results Other: ML20083M935, ML20084H457, ML20084P594, ML20092D927, ML20094R400, ML20096C908, ML20106B579, ML20107K230, ML20112D736, ML20126C521, ML20127K137, ML20127N695, ML20128N286, ML20132G502, ML20154A542, ML20235N112 | |
From | |
MONTHYEARML20083M9351984-04-12012 April 1984
[table view]Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418 ML20084H4571984-04-25025 April 1984 Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion Regreased ML20084P5941984-05-0707 May 1984 Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon Request ML20092D9271984-06-15015 June 1984 Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as Ref ML20093J1171984-07-20020 July 1984 Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety Question ML20094R4001984-08-0909 August 1984 Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930 ML20096C9081984-08-20020 August 1984 Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv Listed ML20107K2301984-10-18018 October 1984 Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture Measurements ML20112D7361984-12-14014 December 1984 Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods Necessary ML20106B6131985-01-31031 January 1985 Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results ML20106B5791985-01-31031 January 1985 Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW Warembourg ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart ML20128N2861985-05-20020 May 1985 Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & Inspected ML20126C5211985-05-23023 May 1985 Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable ML20127K1371985-06-0707 June 1985 Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests Negative ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys ML20138A8551985-07-0202 July 1985 Safety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for Restart ML20138A8071985-07-0202 July 1985 Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart ML20132G4501985-07-0808 July 1985 Forwards Safety Evaluation Re Pcrv Prestressing Tendon Wire Corrosion Problems.Submittals & 0614 Acceptably Resolve Concerns.Lasl Evaluation Rept Encl ML20132G4761985-07-0808 July 1985 Safety Evaluation Re Pcrv Tendon Corrosion Investigation & Proposed Remedy.Tendon Surveillance Proposal Acceptable ML20235N1121987-07-0909 July 1987 Forwards Lasl Technical Evaluation Rept, Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Rept ML20154A5421988-08-30030 August 1988 Requests Addl Info Re Rev 7 to Schedule Commitment Items on Pcrv Tendon Surveillance Involving Provision of Schedule for Conducting Evaluation within 45 Days for Pcrv Tendon Degradation 1985-01-31 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:54639&oldid=3226080"