Text
- .
1
NOV 2 01985
-In Reply Refer To:
Docket:
50-313/84-36
Arkansas Power & Light Company
l
ATTN: John M. Griffin, Senior
Vice President - Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
i
Gentlemen:
+ .
.This refers to the inspection ccnducted by Mr. J. I. Tapia of this office
l
.during-the period December 13-15, 1984, and March 28-30, 1985, of activities
<
'
authorized by NRC Operating License DPR-51 for Arkansas Nuclear One, Unitx1,
-
,
,
! and tc the discussion of our. findings with members of your staff at, the
'
. conclusion of the inspection.
'
,
.
The area examined during the inspection covered the containment integrated leak _
-
rate test. Within this area, the inspection consisted of selective examination
n~
of procedures and representative records, interviews with personnel, and
.
.
observations by.the-inspector. These findings are documented in the enclosed
inspection report.
,
e
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. We have reviewed the actions taken prior to the
t ssuance of this Notice of Violation and find them responsive to the concerns
i
raised. We reviewed the implementation of your corrective actions during the
"
inspection of the Unit 2 Containment Integrated Leakage Rate Test during
April 28-30, 1985, and determined that full compliance had been achieved and
will be maintained by those actions taken in response.to the inspectors
concerns expressed during the exit interview'on December 15, 1984.
No further response from you concerning this violation is required at this
time. The corrective actions taken and subsequent NRC followup are discussed
-
in paragraph-2 of the enclosed inspection report.
k
AC:RPSBh
RIV:RSB
RSB
AC:RPB
RIrelj/85 0/$/85
H/t1/85
9/6/85
.yvdTapta:de
ind DHunnicutt
DHunter
LMartin
ff /l5
F
H /51/85
$$$21$0ccd$!00 j3
M
o
.
gt
>
'
e.
'
'
,
y
Arkansas Power and Light Company
-2-
'
w
-
,,
We-apologize for any inconvenience that may hav'e been caused by' late issuance
.of this report. - Should you have any questions concerning this inspection, we
will belpleased to' discuss them with you.
1
Sincerely,
'
. ;,
%A
Cripat sa,ned By
\\
'*
,
E. H. .,tohnson
-j..
%,:
,,
,
.-
'
-
8: . E.-Hartin, Actiing Chief
"
4
'
Reactor Projects Branch
. . , -
st
' Enclosures:
.
1.
Appendix A - hatice of Violation
'
'
2.
Appendix B - NRC: Inspection Report
50-313/84-36 "
- AX
cc w/ enclosures:
J. M.-Levine, General Manager
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
'
Arkansas Radiation Control Program Director
,
bec to DMB~(IE01)
p
,
.(,
bec distrib. by RIV:
lb4
, RPB
- Resident Inspector
R. D. Martin, RA
)f'
"
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2til5)
- RIV File
E. Johnson, DRS&P
- RSB
- MIS SYSTEM
'
~
- RSTS Operator
J. Tapia
'/
.'
RSB (ES)
-
- w/766
-'
,
'
c
i
y
.
,
,
s~
g _
b
\\
.)
,
% "
3,
_ Jg
. id' ~
s
% pr
e
-
.
M
e
e