Forwards Insp Rept 50-313/84-36 on 841213-15 & 850328-30 & Notice of Violation
ML20137X742
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/20/1985
From: Martin L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20137X748 List:
References
NUDOCS 8512100617
Download: ML20137X742 (2)


See also: IR 05000313/1984036

Text

  1. .

1

NOV 2 01985

-In Reply Refer To:

Docket:

50-313/84-36

Arkansas Power & Light Company

l

ATTN: John M. Griffin, Senior

Vice President - Energy Supply

P. O. Box 551

Little Rock, Arkansas 72203

i

Gentlemen:

+ .

.This refers to the inspection ccnducted by Mr. J. I. Tapia of this office

l

.during-the period December 13-15, 1984, and March 28-30, 1985, of activities

<

'

authorized by NRC Operating License DPR-51 for Arkansas Nuclear One, Unitx1,

-

,

,

! and tc the discussion of our. findings with members of your staff at, the

'

. conclusion of the inspection.

'

,

.

The area examined during the inspection covered the containment integrated leak _

-

rate test. Within this area, the inspection consisted of selective examination

n~

of procedures and representative records, interviews with personnel, and

.

.

observations by.the-inspector. These findings are documented in the enclosed

inspection report.

,

e

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. We have reviewed the actions taken prior to the

t ssuance of this Notice of Violation and find them responsive to the concerns

i

raised. We reviewed the implementation of your corrective actions during the

"

inspection of the Unit 2 Containment Integrated Leakage Rate Test during

April 28-30, 1985, and determined that full compliance had been achieved and

will be maintained by those actions taken in response.to the inspectors

concerns expressed during the exit interview'on December 15, 1984.

No further response from you concerning this violation is required at this

time. The corrective actions taken and subsequent NRC followup are discussed

-

in paragraph-2 of the enclosed inspection report.

k

AC:RPSBh

RIV:RSB

ES

RSB

AC:RPB

RIrelj/85 0/$/85

H/t1/85

9/6/85

.yvdTapta:de

ind DHunnicutt

DHunter

LMartin

ff /l5

F

H /51/85

$$$21$0ccd$!00 j3

M

o

.

gt

>

'

e.

'

'

,

y

Arkansas Power and Light Company

-2-

'

w

-

,,

We-apologize for any inconvenience that may hav'e been caused by' late issuance

.of this report. - Should you have any questions concerning this inspection, we

will belpleased to' discuss them with you.

1

Sincerely,

'

. ;,

%A

Cripat sa,ned By

\\

'*

,

E. H. .,tohnson

-j..

%,:

,,

,

.-

'

-

8: . E.-Hartin, Actiing Chief

"

4

'

Reactor Projects Branch

. . , -

st

' Enclosures:

.

1.

Appendix A - hatice of Violation

'

'

2.

Appendix B - NRC: Inspection Report

50-313/84-36 "

AX

cc w/ enclosures:

J. M.-Levine, General Manager

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

'

Arkansas Radiation Control Program Director

,

bec to DMB~(IE01)

p

,

.(,

bec distrib. by RIV:

lb4

, RPB

  • Resident Inspector

R. D. Martin, RA

)f'

"

  • R&SPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2til5)
  • RIV File

E. Johnson, DRS&P

  • RSB
  • MIS SYSTEM

'

~

  • RSTS Operator

J. Tapia

'/

.'

RSB (ES)

-

  • w/766

-'

,

'

c

i

y

.

,

,

s~

g _

b

\\

.)

,

% "

3,

_ Jg

. id' ~

s

% pr

e

-

.

M

e

e