Proposed Tech Specs Requesting Elimination of Selected Response Time Testing Requirements IAW Technical Justifications Provided in BWROG Topical Rept
ML20137T015
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/04/1997
From:
DETROIT EDISON CO.
To:
Shared Package
ML20137S978 List:
References
NUDOCS 9704150294
Download: ML20137T015 (3)


Text

.. . - . _ . _ . _ __ _ _ ._

l l

' 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE RE0'JIREMENTS 4.3.1.1 Each reactor )rotection system instrumentation channel shall be demonstrated OPERABLE )y the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.

4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip l functional unit

  • shall be demonstrated to be within its limit at least once l l

per 18 months. Neutron detectors are exempt from response time testing. Each test shall include at least one channel per trip system such that all channels

. are tested at least once every N times 18 months where N is the total number l of redundant channels in a specific reactor trip system.

! *The sensor response time for Reactor' Vessel Steam Dome Pressure - High and Reactor Vessel Low Water Level - Level 3 need not be measured and may be assumed to be the design sensor response time.

9704150294 970404 PDR ADOCK 05000341 l P PDR 1

i FERMI - UNIT 2 3/4 3-la Amendment No. # , J##

l

l l

l

' INSTRUMENTATION l i

l l SURVEILLANCE RE0VIREMENTS l 1

i 4.3.2.1 Each isolation actuation instrumentation channel shall be '

demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL  !

FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL l

CONDITIONS and at the frequencies shown in Table 4.3.2.1-1. 1 4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of I all channels shall be performed at least once per 18 months, i

4.3.2.3 The ISOLATION SYSTEM RESPONSE TIME of each isolation trip function

  • l l shall be demonstrated to be within its limit at least once per 18 months.

l Radiation detectors are exempt from response time testing. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months, where N is the total number of redundant channels in a specific isolation trip system.

l

, I l

I l l 1 I

I 1

l l l

l l

l l

l l

l l  !

\

  • The sensor response time for Primary Containment Isolation Reactor Vessel Low Water Level - Level I and Main Steam Line Flow - High need not be measured and may be assumed to be the design sensor response time.

! FERMI - UNIT 2 3/43-10 Amendment No. JES, <

f

(

l i~ INSTRUMENTATION l l

I 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION I l

LIMITING CONDITION FOR OPERATION i 3.3.3 The emergency core cooling system (ECCS) actuation instrumentation l channels shown in Table 3.3.3-1 shall be OPERABLE with their trip setpoints ,

set consistent with the values shown.in the Trip Setpoint column of Table i 3.3.3-2. 1 APPLICABILITY: As shown in Table 3.3.3-1.

! ACTION:

a. With an ECCS actuation instrumentation channel trip setpoint less ,

conservative than the value shown in the Allowable Values column of Tame 3.3.3-2, declare the channel inoperable until the channel  !

is restered to OPERABLE status with its trip setpoint adjusted '

l consifient with the Trip Setpoint value.

! 1 l b. With one or more ECCS actuation instrumentation channels )

inoperable, take the ACTION required by Table 3.3.3-1. '

l

c. With either ADS trip system "A" or "B" inoperable, restore the inoperable trip system to OPERABLE status within: )
1. 7 days, provided that the HPCI and RCIC systems are OPERABLE, otherwise,  ;
2. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

l

) Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to less than or equal to 150 psig within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l SURVEILLANCE REQUIREMENTS 4.3.3.1 Each ECCS actuation instrumentation channel shall be demonstrated

! OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the l frequencies shown in Table 4.3.3.1-1.

4.3.3.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.*

l l 4.3.3.3 The ECCS RESPONSE TIME of each ECCS trip function ** shall be  ;

j demonstrated to be within the limit at least once per 18 months.

  • For the diesel generator output breakers: Completion of logic system l functional testing, for the loss of power function, to positively verify that the breaker reclosure permissive relay (52XX) is re-energized by the associated bus load shedding logic contact closing, rather than the 52XX being re-energized by a parallel path, may be deferred and must be completed

, no later than during the first plant outage after September 29, 1995.

! **ECCS actuation instrumentation response time need not be measured and may be

assumed to be the design instrumentation response time.

i FERMI - UNIT 2 3/4 3-23 Amendment No. J##, JpE, L , - - - - - -

-. - - .