gf UNITED STATES g
g NUCLEAR REGULATORY COMMISSION e
WASHINGTON. D. C. 20655
~s.,...../
BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 92 License No. DPR-35 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Boston Edison Company (the licensee) dated August 9, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-35 is hereby amended to read as follows:
8602130255 Oggggj93 PDR ADOCK O PDR P
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 92, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective 30 days after the date of issuance.
FOR THE NUCLEAR REGULATORY C ISSION 1 Jo 3_
John. Zwolinski, Director BWR P oject Directorate #1 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: February 4, 1986
n i
1 ATTACHMENT TO LICENSE AMENDMENT NO. op FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Revise the Appendix A Technical Specifications by removing the page identified below and inserting the attached page.
The revised page is identified by the captioned amendment number and has marginal lines indicating the areas of change.
REMOVE-INSERT 27 27 L
w TABLE 3.1.1 REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMENTATION REQUIREMENT Minimue Number Modes in Winich Function Operable Inst.
Trip Function Trip Level Setting Must Be Operable
-Action
Channels per Refuel (7) Startup/ Hot,
- Run, Trip (1) System Standby 1
Mode Switch in Shutdown X
X X
A 1
X X
A IRM 3
High Flux 1120/125 of full scale X
X (5)
A 3
Inoperative X
X (5)
A APRM 2
High Flux (14) (15)
(17)
(17)
X A or B 2
Inoperative (13)
X X(9)
X A or B l
2 Downscale
~>2.5 Indicated on Scale (11)
(11)
X(12)
A or B 2
High Flux (15%)
115% of Design Power X
X (16)
A or B 2
High Reactor Pressure 1 085 psig X(10)
X X
A 1
2 High Drywell Pressure 5 5 psig X(8)
X(8)
X A
2 2
Reactor Low Hater Level
>9 In Indicated Level X
X X
A 2
High Water Level in Scram Discharge Tank 139 Gallons X(2)
X X
A 2
Turbine Condenser low 2 3 In. Hg Vacuum X(3)
'X(3)
X A or C 2
Vacuum 2
Main Steam Line High
$7X Normal Full Power Radiation Background (18)
X X
X(18)
A or C 4
Main Steam Line Isolation Valve Closure 1 0% Valve Closure X(3)(6)
X(3)(6)
X(6)
A or C 1
l 2
Turb. Cont. Valve Fast 2150 psig Control Oil Closure Pressure at Acceleration Relay X(4)
X(4)
X(4)
A or D 4
Turbine Stop Valve Closure 1 0% Valve Closure X(4)
X(4)
X(4)
A or D 1
~
~
- APRM high flux scram setpoint 1(.58W + 62%)
FRP Two recirc. pump operation MFLPD
~
~
Amendment No. 86,92 27