__
UNITED STATES
}
NUCLEAR REGULATORY COMMISSION CA 5
j WASHINGTON, D. C. 20555
%..... /
AUG 151995 Docket No.: 50-400 Mr. E. E. Utley, Exec. Vice President Power Supply & Engr. & Const.
Carolina Power & Light Company P. O. Box 1551 27602 Raleigh, North Carolina
Dear Mr. Utley:
SUBJECT:
ARBITRARY INTERMEDIATE PIPE BREAKS - SHEAR 0N HARRIS, UNIT 1 We have completed our review of the Carolina Power & Light Co. submittals dated February 13, 1985, dealing with alternative pipe break criteria that would eliminate arbitrary intermediate pipe breaks in certain high energy piping systems at Shearon Harris Nuclear Plant, Unit-1. Our evaluation of your submittals is enclosed.
Based on our review of the technical justification for elimination of arbitrary intemediate breaks given in Appendices A through D to the above cited submittals which include the main steam and feedwater piping and certain primary system piping, we have concluded that your request is acceptable.
This subject is being treated as a justified deviation from Section 3.6.2 (MEB 3-1) of the Standard Review Plan (SRP). The enclosed Safety Evaluation will be incorporated into Supplement No. 3 to the Shearon Harris Safety Evaluation Report at a future date.
Sincerely, in, Thomas M. Novak, Assistant Director for Licensing Division of Licensing
Enclosure:
As stated cc: See next page R8e27;gg g;ggggo A
~.
.e_
4
.{
(
b Mr. E. E. Utley Caroline Power & Light Company Shearon Harris cc:
George F. Trowbridge, Esq.
Mr. George Jackson, Secretary Shaw, Pittman, Potts & Trowbridge Environmental Law Project 1800 M Street, NW School of Law, 064-A Washington, DC 20036 Univeristy of North Carolina Chapel Hill, North Carolina 27514 Richard E. Jones, Esq.
Associate General Counsel Mr. Travis Payne, Esq.
- Carolina Power & Light Company 723 W. Johnson Street 411 Fayetteville Street Mall Post Office Box 12643 tj Raleigh, North Carolina 27602 Raleigh, North Carolina 27605 M. David Gordon, Esq.
Mr. Daniel F. Read Associate Attorney General CHANGE State of North Carolina Post Office Box 2151 Post Office Box 629 Raleigh, North Carolina 27602 Ral'eigh, North Carolina 27602 i-Bradley W. Jones, Esq.
- Thomas S. Erwin, Esq.
U.S. Nuclear Regulatory Comm.
115 W. Morgan Street Region II Raleigh, North Carolina 27602 101 Marietta Street Atlanta, Georgia 30303 Resident Inspector / Harris NPS Richard D. Wilson, M. D.
c/o U.S. Nuclear Regulatory Commission 725 Hunter Street Route 1, Box 315B Apex, North Carolina 27502 New Hill, North Carolina 27562 Regional Administrator, Region II Charles D. Barham, Jr., Esq.
U.S. Nuclear Regulatory Commission Vice President & Senior Counsel 101 Marietta Street Carolina Power & Light Company Suite 2900 l
Post Office Box 1551 Atlanta, Georgia 30303 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Mr. John Runkle, Executive Coordinator Executive Director Conservation Council of North Carolina Public Staff - NCUC 307 Granville Road Post Office Box 991 Chapel Hill, North Carolina 27514 Raleigh, North Carolina 27602 Mr. Wells Eddleman 718-A Iredell Street Durham, North Carolina 27705 u
l O
i
+r
-e e. - -,
.*_t,-
<u...e i-eJ,a e e.. e,s
- s. +4%
- 4
- e&=-
-4
,C,-
~-
- - - < - ri
Carolina Power & Light Company Shearon Harris Dr. Linda Little Governor's Waste Management Board 513 Albemarle Building 325 North Salisbury Street Raleigh, North Carolina 27611 1
e i
l l
l l
l l
l l
a
{.. -..... -... -. -.. - -
Docket No.:
50-400 Distribution Docket File BGrimes NRC PDR Edordan LPDR ACRS(16)
PRC System Mr. E. E. Utley, Exec. Vice President NSIC Power Supply & Engr. & Const.
LB#3 Reading Carolina Power & Light Company JLee P. O. Box 1551 BBuckley Raleigh, North Carolina 27602 OELD, Shomaker JPartlow
Dear Mr. Utley:
SUBJECT:
ARBITRARY INTERMEDIATE PIPE BREAKS - SHEAR 0N HARRIS, UNIT 1 We have completed our review of the Carolina Power & Light Co. submittals dated February 13, 1985, dealing with alternative pipe break criteria that would eliminate arbitrary intermediate pipe breaks in certain high energy piping systems at Shearon Harris Nuclear Plant, Unit 1.
Our evaluation of your submittals is enclosed.
Based on our review of the technical justification for elimination of arbitrary intermediate breaks given Appendixes A through D to the above cited submittals which include the main steam and feedwater piping and certain primary system piping, we have concluded that your request is acceptable.
This subject is being treated as a justified deviation from Section 3.6.2 (MEB 3-1) of the Standard Review Plan (SRP). The enclosed Safety Evaluation will be incorporated into Supplement No. 3 to the Shearon Harris Safety Evaluation Report at a future date.
Sincerely, Thomas M. Novak, Assistant Director for Licensing Division of Licensing
Enclosure:
As stated cc: See next page g
M
- Previously concurred:
_/
DL:LB#3 OELD DL:LB#3 AD/L V
- BBuckley
- JMoore
- GWKnighton TMNovak 7/1/85 7/2/85 8/7/85 8/ /85 L.
Docket No.: 50-400 Distribution Docket File BGrimes NRC PDR EJordan LPDR ACRS (16)
PRC System Mr. E. E. Utley, Exec. Vice President NSIC Power Supply & Engr. & Const.
LB#3 Reading Carolina Power & Light Company JLee
.P. O. Box 1551 BBuckley Raleigh, North Carolina 27602 OELD, Shomaker JPartlow
Dear Mr. Utley:
SUBJECT:
ARBITRARY INTERMEDIATE PIPE BREAKS - SHEAR 0N HARRIS, UNIT 1 We have completed our review of the Carolina Power & Light Co. submittals dated February 13, 1985, dealing with alternative pipe break criteria that would eliminate arbitrary intermediate pipe breaks in certain high energy piping systems at Shearon Harris Nuclear Plant, Unit 1.
Our evaluation of your submittals is enclosed.
Based on our review of the technical justification for elimination of arbitrary intermediate breaks given Appendixes A through D to the above cited submittals which include the main steam and feedwater piping and certain primary system piping, we have concluded that your request is acceptable.
This subject is being treated as a justified deviation from Section 3.6.2 (MEB 3-1) of the Standard Review Plan (SRP). The enclosed Safety Evaluation will be incorpor-tad into Supplement No. 3 to the Shearon Harris Safety Evaluation Report at a future date.
Sincerely, ls/
Thomas M. Novak, Assistant Director for Licensing Division of Licensing