ML20137G217

From kanterella
Jump to navigation Jump to search
Application for Renewal of License SNM-1492,deleting G Stobbelaar from License.Fee Paid
ML20137G217
Person / Time
Site: 07001721
Issue date: 02/06/1985
From: Maki C
CLEVELAND-CLIFFS IRON CO.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20136B820 List:
References
03076, 24838, 3076, NUDOCS 8601170654
Download: ML20137G217 (3)


Text

O3b76 llw.

m ge/

a..

f.f

& Jtway B y -,g na,s w.s1 E. G. BEIN LICh, GENE R AL MAN AGE R. MIN ES B.C. FORSBERG MANAGER, ADMINISTRATIVE SERVICES 504 SPRUCE STREET R. A. KOSKI, MAN AGER, ENGINEERING SERVICES ISHPEMING, MICHIGAN 49849 J. F. MARSH ALL. MAN AGE R. HUM AN RESOU RCES PHONE 906-486-9941 February 6, 1985 UNITED STATES NUCLEAR REGULA'nRY COMMISSION License Management Branch Division of Fuel Cycle and Material Safety Washington, D.C.

20555 Gentlemen:

The enclosed informativa and seven copies submitted is a request a ranew our special nuclear material license no. SNM-1492 XHQ, Amendment 04 which will expire on March 31, 1985.

All conditions, statements and representations remain valid and applicable to the request except for personnel changes as noted.

Included is the license renewal fee of $120.00.

Very truly yours, THE CLEVELAND-CLIFFS IRON COMPANY tu )%Ju By C

. Maki Instrumentation Engineer CWM:hmw Enclosures cc:

RAKoski/EHBilkey 7'

.a.

CWMaki I.

Ut ESFile pg

.g

?

='

R

=c N

2 RECEIVED BY LFl.b.

3 E

1

.1 J

g a'

//

[j

{

cate..

9g.

ApphCani...h gDy.....

' # N8"

'.[Ml

)'

Orig. To..

Actio., ;cmpt;;g.. i.s.y.

7

..z.a.aLa. a. m.

t_:

m...., n -

A.ph 0d Ly...

B601170654 951114

[

[

REG 3 LIC70 g>M-1493 PDR

r

~

APPENDIX 1.

Summary of items that will remain the same and have been filed with the Commission with previous license applications.

Item Drawing - Pu238-B1 Source Capsule Drawing - Neutron Source Shield Drawing - Inner Source Shield Assembly Leak Test of Activation Analysis Sources Leak Test of Cesium 137 Sources Drawing A-102 - Tilden, EMP-100 - Empire Showing Laboratory Arrangement Summary of Radiation Safety Precautions NOLA I Silica Analyzer - Schematic Representatics N0LA I Density Gauge N0LA I Irradiator Texas Nuclear Drawing PQ 77-328-1 Texas Nuclear Drawing D-534 Texas Nuclear Drawing D0-MISC-2001 2.

The Cleveland-Cliffs Iron Company principal of ficers are:

President

- E. B. Johnson Vice President-0parations - J. U. Villar General Manager of Mines

- E. C. Beinlich 3.

Operating Personnel Changes Delete the name of Gordon Stobbelaar listed under " Conditions Item 12 on Amendment 02.

CWM: haw 2/6/85 i

APPENDIX 1.

Summary of items that will remain the same and have been filed with the Commission with previous license applications.

Item Drawing - Pu238-B1 Source Capsule Drawing - Neutron Source Shield Drawing - Inner Source Shield Assembly Leak Test of Activation Analysis Sources Leak Test of Cesium 137 Sources Drawing A-102 - Tilden, EMP-100 - Empire Showing Laboratory Arrangement Summary of Radiation Safety Precautions N0LA I Silica Analyzer - Schematic Representation NOLA I Density Gauge N0LA I Irradiator Texas Nuclear Drawing PQ 77-328-1 Texas Nuclear Drawing D-534 Texas Nuclear Drawing D0-MISC-2001 2.

The Cleveland-Cliffs Iron Company principal officers are:

President

- E. B. Johnson Vice President-0perations - J. W. Villar General Manager of Mines

- E. G. Beinlich~

3.

Operating Personnel-Changes Delete the name of Gordon Stobbelaar listed under " Conditions Item 12 on Amendment 02.

CWM:hmw 2/6/85

._