l Georgia PowerA ATTACHMENT 4 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN 1. HATCH NUCLEAR PLANT UNITS 1 AND 2 DELETION OF CONTROL BUILDING C0p FIRE SUPPRESSION SYSTEM The proposed change to Technical Specifications (appendix A to Operating
-Licenses DPR-57 and NPF-5) would be incorporated as follows:
Remove Page Insert Page Unit 1 3.13-7 3.13-7 Unit 2 3/4 7-27 3/4 7-27 5
i P
^
70077S e
G
~
o 3/4513.
' FIRE PROTECTION SYSTEMS 3/4.'1334.
C0pSYSTEM l
LIMITING CONDITIONS FOR-0PERATION'
~3.13'.4'.- The following CO2 system shall be OPERABLE with a minimum level fof60%anda'minimumpressureof.275psiintheassociatedstoragetank.
7" a.
Diesel Generator Building C02 System APPLICABILITY:
At all times when the equipment in the area is required to l be OPERABLE.
. ACTION:-
a.
With - a CO2 system inoperable, establish a continuous fire watch with backup fire suppression equipment for the unprotected area (s),
within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
J estore the system to OPERABLE status within 14 days or prepare and b.'
R submit-a Special' Report to the Commission with the next 30 days outlinin'g the cause of inoperability and the plans for restoring the system to OPERABLE status.
SURVEILLANCE REQUIREMENTS-ie
'.4.13.4.-
The CO2 system shall-be demor.strated OPERABLE:
a.
At least once per 7 days by verifying each CO2 storage tank level and pressure.
b.-
At least once per ~18 months by verifying the system valves and associated ventilation dampers actuate automatically and manually to a simulated actuation signal. A brief flow test shall be made to verify flow from each nozzle.
(" Puff Test").
Hatch - Unit 1 3.13-7 Amendment No. 50
p.-
..3
" ly W Y
. g.. w
>5
.+r d-PLANTcSYSTEMSi
.[LbhPRESSUREC0hSYSTEM l
iLIMITING' CONDITION-FOR OPERATION' 3.7.6;3 iThe following' low pressure 'C0 system shall be OPERABLE with at l
2
.Jflinimum level of' 60f, and'a minimum pressure of '275 psig in the associated T storage tank.
db Diesel Generator: Building ~CO -
2 APPLICA8ILITY: J Whenever equipment iri the-low pressure C02 protected
- area-1s required.to be OPERABLE.'
! ACTION:.
With the above-require'd low pressure CO2 system l
- a.:
inoperable, establish'a continuous fire. watch with backup fire suppression equipment for the unprotected area (s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; restore the-system to OPERABLE status within 14 days, or in lieu of any other report required by< Specification 6.9.1, prepare 4-and submit a Special. Report to the-Comission~ pursuant to Speci-
'fication 6.9.2 within the next 30 days outlining the action o
?taken, the cause of the inoperability and the plans and schedule for restoring the system:to OPERABLE status.
i b.
.The provisions of Specification 3.0.3'and 3.0.4 are not
. applicable.-
SURVEILLANCE REQUIREMEhTS T,7.653 The~above required low pressure C02 system shall be l
4 W
- demonstrated:0PERABLE:
. a.:.At least once per.7 days by verifying C02 storage tank level and
. pressure, and c
- b.-
At least once per.18 months by verifying:
- 1.-
The system valves and associated ventilation dampers
-actuate manually and automatically, upon receipt of a simulated actuation signal, and
)
[
2.-
Flow from each nozzle during a " Puff Test."
J
. HATCH-UNIT 2-3/4 7-27 s
~