05000316/LER-1985-034-01, :on 851024 & 30,high Alarms Received on Lower Containment Airborne Particulate Radiation Monitor Train B, Resulting in ESF Actuation Signal.Caused by Monitor Trending Upward.Setpoints Readjusted

From kanterella
(Redirected from ML20137E863)
Jump to navigation Jump to search
:on 851024 & 30,high Alarms Received on Lower Containment Airborne Particulate Radiation Monitor Train B, Resulting in ESF Actuation Signal.Caused by Monitor Trending Upward.Setpoints Readjusted
ML20137E863
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/21/1985
From: Kriesel T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML20137E676 List:
References
LER-85-034-01, LER-85-34-1, NUDOCS 8511270320
Download: ML20137E863 (1)


LER-1985-034, on 851024 & 30,high Alarms Received on Lower Containment Airborne Particulate Radiation Monitor Train B, Resulting in ESF Actuation Signal.Caused by Monitor Trending Upward.Setpoints Readjusted
Event date:
Report date:
3161985034R01 - NRC Website

text

,

p U.S. NUCLEL:4 LELULATOJ Y COMMISSION NRC Farm 304 (943)

APPROVED oms NO. 3150-4104

~

LICENSEE EVENT REPORT (LER)

DOCKET NUMSER (2)

PAGE(3)

FACILITY NAME tu DONALD C. COOK NUCLEAR PLANT UNIT 2 o ls ; o lo l o l 3; 1l 6 ijopl0;1 TITLE (4)

ESF ACTUATION EVENT DATE (53 LER NUMSER (4)

REPORT DATE (7)

OTHER F ACILITIES INVOLVED 10)

MONTH DAY YEAR FEAR MONTH DAY YEAR F ACILITY N AMES DOCKET NUMBER ($)

IE0U L

qu R

M o lsl0 lolol l l 1l0 2l5 85 8l5 0l 3l 4 0l0 1l1 2l1 8l 5 o is,o g o i o, l,

Mi 0 E QUIMMENH OF M CPR [ (N m w m e, W @wW HH OPERATING A

60.73(aH2Hivl 73.71(bl "3

20.402(b) 20.406(s) 20.40slaH1Hil 50.3steH1b 80.73(ell 2Hvl 73.71(c)

R (101 l l 20.405taH1 Hun 60.b4(eH21 50.73taH2Hvul HER JoAb 20.405(sH1H*l 50.73tsH2Hij

$0.73(aH2HvmHA)

J55AJ 20.4086sH1Hiv) 50.73(eH2Het 50.731sH2HviMHB) 20.408tsH1Hvl 90.73(aH2Hitil 50.734sH2Hal LICENSEE CONTACT FOR TH18 LER (12)

T. A. KRIESEL - TECHNICAL PHYSICAL SCIENCES

,,,, coo, "" "

DEPARTMENT SUPERINTENDENT 4 6; S i 5,9;0;1 6; 1, 6 i

i COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRISED IN TNis REPORT 113)

LE l

"^YE

CAUSE

SYSTEM COMPONENT CAUS$

SYSTEM COMPONENT T E T

PR $

TU T

PR S 1

I I l i I I I

I I I I ! I I

l l I l l l I

l l I I I I SUPPLEMENTAL REPORT EXPECTED (14)

MONTH DAY YEAR sueur$310N YES (19 ven. comnwee EXPECTED SUGWisSION DA'i NO l

l l

A T&ACT (u-,.,.m

(.

-,, mi, w.

,n, v.,,,,,,,, n.,

ON OCTOBER 24, 1985 AT 2358 HOURS WITH THE REACTOR COOLANT SYSTEM IN MODE 1 (OPERATING) AT 29 PERCENT REACTOR THERMAL POWER AND AGAIN ON OCTOBER 30, 1985 at 0058 HOURS WITH THE REACTOR COOLANT SYSTEM IN MODE 3 (HOT STAND 3Y), A HIGH ALARM WAS RECEIVED ON ERS-2401, THE LOWER CONTAINMENT AIRBORNE PARTICULATE RADIATION MONITOR TRAIN B (IEEE/ MON).

THE HIGH ALARMS RESULTED IN AN ESF ACTUATION SIGNAL WHICH WOULD HAVE RESULTED IN AN ISOLATION OF THE CONTAINMENT PURGE SYSTEM HAD THE CONTAINMENT PURGE SYSTEM BEEN IN SERVICE.

DURING THE TIME OF THE EVENT THE MONITOR TRENDED UPWARD UNTIL THE HIGH ALARM SETPOINT WAS REACHED..

A TOUR OF THE ANNULUS AREA DID NOT REVEAL ANY LEAKS.

THE MONITOR WAS CHECKED AND FOUND TO BE OPERATING NORMALLY.

THE HIGH ALARM SETPOINT AND ALERT ALARM SETPOINT WERE READJUSTED TO MORE ADEQUATELY REFLECT THE BACKCROUND RADIATION LEVELS IN THE CONTAINMENT.

THE HEALTH AND SAFETY OF THE PUBLIC WERE NOT AFFECTED.

PREVIOUS OCCURRENCES OF A SIMILAR EVENT:

316/85-031.

l l

8511270320 851121 PDR ADOCK 05000316 3

1 PDR "Yl*""

  • us.oraisems44i,iefse