Forwards Feb 1997 Rept on Status of Public Petition Under 10CFR2.206,decisions Pending Before Commission & Courts & Other Sensitive Matters for Internal Distribution Only
ML20137E457
Person / Time
Issue date: 03/20/1997
From: Zimmerman R
NRC (Affiliation Not Assigned)
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19355F037 List:
References
2.206, NUDOCS 9703270239
Download: ML20137E457 (24)


Text

_.. _. _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _

i l

March 20, 1997 l

i 1

MEMORANDUM TO:

L. Joseph' Callan l

l Executive. Director for Ope ations A

RoyP.Zimmeri.ian0fM -

U1 4 Qe%.

i

?.garO l

l FROM:

i Associate Director for Projects j

Office of Nuclear Reactor Regulation

SUBJECT:

FEBRUARY 1997 REPORT ON THE STATUS OF PUBLIC PETITIONS UNDER j

10 CFR 2.206 l

l The attached monthly report reflects the status of 10 CFR 2.206 petitions as j-of-the end of February 1997. This report may not reflect changes in status l

that'have occurred since petition managers submitted data on the February j

i status. Attachment 1 gives the status of petitions before the Offices of i

Nuclear Material Safety and Safeguards, Nuclear Reactor Regulation, and l

l Enforcement. Attachment 2 lists decisions before the Commission and the 4

courts. Attachment 3 lists other sensitive matters which are for internal j-distribution only.

i By issuing the monthly report on the status of pending 10 CFR 2.206 petitions, l

the staff is documenting its responsiveness to petitioners.

j To enhance staff responsiveness to the public, those parts of the monthly i

report not of a sensitive nature will be placed in the Public Document Room i

i and on the electronic bulletin board system, making them readily accessible to q

the public.

j J

l Attachments:

1.

Report on Status of Public Petitions Under 10 CFR 2.206 2.

Decisions Pending Before the Commission and the Courts 3.

Internal Distribution Only cc w/atts:

H. L. Thompson, ED0 R. L. Bangart, OSP E. L. Jordan, ED0 G. P. Caputo, 0I P. G. Norry, ED0 J. F. Cordes, Jr., OCAA J. Blaha, EDO J. R. Goldberg, OGC K. D. Cyr, OGC L. J. Chandler, OGC S. J. Collins, NRR C. J. Paperiello, NMSS fp /-

7 Ly gg4 )1 M. R. Knapp, NMSS Regional Administrators J. Lieberman, OE OCA

\\

C4g,p JDIL '

E. Julian, SECY OPA g u-I CONTACT: Janet Kennedy, NRR Qo 6cp ' ' 4 #

\\

415-3267 i

Distribution:

iCentral Files J. Roe (e)

M. Mattia/NMSS P.Lohaus P. Anderson /ED0 PUBLIC w/att 1 & 2 only (Att 3 is "NOT FOR EXTERNAL DISTRIBUTION")

B. McCabe E. Adensam (e)

F. Cameron /0GC A. Chaffee G. Deegan/NMSS R. Zimmerman M. Thadani C. Jamerson J. Kennedy To receive e espy of this document, Indicate in the bons =C= = Copy without attachment / enclosure =E

= copy with

/,A/-/ 6 h ateachment/eneto.ur. =e= = u copy DOCUMENT NAME:

P:\\206\\ MAR 97RPT.WP

/

on 0FFICE PM:PD41 lE LA:PD31 l.E NMSS:RMB lE DE lE ADPR;7tRinf L Y f )(otoi + /

NAME J. KennedyJE C. JamersoMi, M. Mattia J. Lieberman R. /tWnenpFn' DATE 03/4/191.

03/lH97 7 03//7 /97(e) 03//,t/97(e) 03% &/97 \\\\

< (()

(/

OFFICIAL RECORD COPY (e) e-mail concyrrence 7gg

~ le "F ER("

gg RE CNTS COPY

~.

ps uco g

4 UNITED STATES E

NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.0,2065H1001

  • /

March 20, 1997 MEMORANDUM T0:

L. Joseph Callan Executive Director for 0 at FROM:

Roy P. Zimmerman Associate Director for rojec' Office of Nuclear Reactor Regulation

SUBJECT:

FEBRUARY 1997 REPORT ON THE STATUS OF PUBLIC PETITIONS UNDER 10 CFR 2.206 The attached monthly report reflects the status of 10 CFR 2.206 petitions as of the end of February 1997. This report may not reflect changes in status that have occurred since petition managers submitted data on the February status. Attachment I gives the status of petitions before the Offices of Nuclear Material Safety and Safeguards, Nuclear Reactor Regulation, and Enforcement. Attachment 2 lists decisions before the Commission and the courts. Attachment 3 lists other sensitive matters which are for internal distribution only.

By issuing the monthly report on the status of pending 10 CFR 2.206 petitions, the staff is documenting its responsiveness to petitioners.

To enhance staff responsiveness to the public, those parts of the monthly report not of a sensitive nature will be placed in the Public Document Room and on the electronic bulletin board system, making them readily accessible to the public.

1 Attachments:

1.

Report on Status of Public Petitions Under 10 CFR 2.206 2.

Decisions Pending Before the Commission and the Courts 3.

Internal Distribution only cc w/atts:

H. L. Thompson, EDO R. L. Bangart, OSP E. L. Jordan, EDO G. P. Caputo, 01 P. G. Norry, ED0 J. F. Cordes, Jr., OCAA J. Blaha, EDO J. R. Goldberg, OGC K. D. Cyr, OGC L. J. Chandler, OGC S. J. Collins, NRR C. J. Paperiello, NHSS M. R. Knapp, NMSS Regional Administrators J. Lieberman, OE OCA E. Julian, SECY OPA CONTACT: Janet Kennedy, NRR 415-3267

,44

,dA.

h M 4Ah4-h a 44 S

+4ipu.43r 4 dM A na huis. e4 N ahM 24A ' ' " ' -- ' " ' - M h e 4b h a C M MM M W-4+ ha-4 4 h--"

-"M4 I56_-

Mh M e *W.h m W M ANALhumW1de WJe m Asand hs.am sh,mu a n

g..

- i h

4 l-.

t

=

r F -

I i

i

. i f

1 i

i s

t n

4 3-4 s

1 -

p i

(

6 I

t a

r 4

t r

a I

i

?

i 4

i 1

a

~

l 4 -

e i

I i

l.

(

1 l.'

,(-

e i

d t

a d

I' 1

d 1

J m

I i

l 5

h

.es.-

.---.e-..i.

  1. ,4-.

4

.-.w,-

,,4

,m,--.

r

.,y r+v..--

y..r,-rv y_.-

y, w y

e-4

f Rip:rt en Status of Public Petiticns Under 10 CFR 2.206 l

February 1997 Contents

  • Page Facility Petitioner /EDO No.

H2.i.

1 Vogtle Hobby and Mosbaugh/5836 1,21 j

Advanced Medical Systems, Inc.

Northeast Ohio Regional Sewer District /8663 2

Advanced Medical Systems, Inc.

Northeast Ohio Regional Sewer District /10395 3

Oyster Creek Gunter and de Camp,Jr./10473 3 Georgia Tech and All Licensees Blockey-6't,rien/10598 5

Millstone Ross/10600 7

i Millstone Ross/15 21 Millstone Galatis et al./603 8,22 National Institutes of Health Ma and Zheng/721 10,22 Palisades Plant, Point Beach Units 1 and 2, and Arkansas Nuclear One, Units 1 and 2 Shillinglaw/872 21 Davis-Besse Toledo Coalition for Safe Energy, et al./886 21 i

Westinghouse Electric Corporation Doyle/GT96400 12 Shieldalloy and Cypress Foote Bauman/GT96596 13 4

Maine Yankee and All Other Plants Using i

the RELAP Code for ECCS Analyses Sears /GT96659 14 Northern States Power Company Independent Florence Township /GT96669 Spent Fuel Storage Installation

/GT96670 15 Point Beach, Units 1 and 2 Dums, Wisconsin's Citizens' i

Utility Board /GT96774 16 l

Shieldalloy, Newfield, NJ Bauman/GT96775/GT97085 17 San Onofre Nuclear Generating Station Dwyer/GT96778 17 All Users of the VSC-24 Nuclear Waste Storage Cask Sinclair and Roemer/GT96801 18 i

Connecticut Yankee and Millstone Katz, Citizens Awareness Network /GT96919 18 Vermont Yankee Block, Citizens Awareness Network /GT96950 20 Envirocare of Utah, Inc.

Cochran, Natural Resources Defense Council /GT97017 21

  • Includes Ati.uchments 2 and 3.

Report on Status of Public Petitions Under 10 CFR 2.206 Facility:

Voetle Petitioners:

M. Hobby and A. Mosbaugh Date of Petition:

9/11/90 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

9/21/90 EDO Number:

5836 OGC Number:

P-90-009 Scheduled Completion Date:

3/31/97 Last Contact with Petitioner (s):

1/8/97 Petition Manager:

D. Wheeler l

Case Attorney:

M. Young /C. Barth l

Issues / Action Requested:

Take immediate action regarding alleged " illegal transfer" of operating licenses, repeated and

)

willful violations of NRC requirements, and unsafe l

management practices at operating reactors.

Current Status:

An acknowledgment letter was issued on 10/23/90. The Director of the Office of Nuclear Reactor Regulation I

issued a partial Director's Decision on 4/23/93 i

(DD-93-08). On 7/14/93, the Commission vacated the

)

partial Director's Decision and requested that a final Dirntor's Decision await completion of a related hearing (CLI-93-15). On 2/18/94, the Atomic Safety and Licensing l

Board (ASLB) granted intervenor status to petitioner l

Mosbaugh, admitting him as a party in the license amendment proceeding concerning the pronosed transfer of operating licenses from Georgia Power to Southern Nuclear l

Operating Company. The contention admitted encompasses some of the issues in the 2.206 petition. The hearing on the " illegal transfer" issue was held -1/4-13/95. The I

hearing on the final issue (an alleged misrepresentation l

of diesel generator test results) began on 4/17/95. On 2/1/96 the NRC issued a Board Notification, 96-01, to the petitioners' attorney advising them of pending actions.

On 4/10/96, OGC telephoned the petitioner's legal counsel in the ASLB proceeding to provide a status update on the

2. 206 petition and inform the legal counsel that there were no new developments.

The hearings were completed and the final filings from all parties were submitted to the ASLB by 12/22/95. On 6/20/96 Georgia Power Company and intervenor Mosbaugh filed a joint motion informing the Board that they had arrived at a settlement "in principle" and asked the Board to defer issuing any decision until 9/20/96. One of the conditions of the settlement was that the Board terminate i

the proceedings without a decision. On 8/2/96, petitioner I.

Mosbaugh filcd a withdrazal of his intervention and, en the same day, petitioner Mosbaugh and the licensee filed a joint motion requesting that the ASLB issue an order terminating the proceedings without issuing a decision.

The ASLB issued an order on 8/16/96 dismissing the case without a decision. The staff received an extension for the scheduled completion date until 10/31/96. The staff has received several extensions since October 1996 to allow additional time for staff review of the draft Director's Decision. On 7/1/96, 8/27/96, 10/18/96, and 1/8/97, the staff telephoned petitioner Hobby's legal counsel to provide an update on the status of the petition.

Facility:

Advanced Medical Systems. Inc.

Petitioner:

Northeast Ohio Regional Sewer District (W. Schatz)

Date of Petition:

3/3/93 Director's Decision To Be Issued by:

NMSS Date Referred to Review Organization:

3/17/93 EDO Number:

8663 OGC Number:

P-93-003 l

Scheduled Completion Date:

3/30/97 Last Contact with Petitioner (s):

2/3/97 Petition Manager:

J. DeCicco Case Attorney:

R. Weisman Issues / Action Requested:

Modify license for AMS to (1) assume all costs i

l resulting from offsite release of cobalt-60 that l

has been deposited at the Southerly Treatment l

Plant and (2) decontaminate the sewer connecting AMS with public sewer system.

Current Status:

An acknowledgment letter was issued on 4/2/93.

Extensive environmental surveys were completed by Region III during the week of 5/24/93 and an inspection report was issued on 7/29/93. A Northeast Ohio Regional Sewer District i

l (NE0RSD) site characterization report was submitted on 6/30/94. A NE0RSD letter of 9/13/94 contained i

supplemental requests to this petition. An acknowledgment letter was issued on 10/14/94. A NE0RSD letter of 10/13/94 contained a second supplemental request to this l

petition; an acknowledgment letter was issued on 11/2/94.

l The scheduled completion date was extended several times in 1995 to allow preparation and staff review of an options paper for the Commission's consideration.

I The staff provided status updates to the petitioner by telephone on 5/30/95, 8/1/95, 10/3/95, 12/4/95, 2/12/96, 4/16/96, and 6/18/96.

Because of the agency-wide implications of waste disposal, the completion date was again extended several times in 1996 to continue staff review of the Commission Options Paper. The staff contacted the petitioner by telephone on 8/20/96, 10/22/96, and 12/20/96 to discuss the status of the 4 i

l I

petition. The eptiens paper for the Commission's consideration has been completed by the Office of Nuclear Material Safety and Safeguards. However, an out-of-court L

settlement occurred on 12/20/96 for cost recovery action NE0RSD brought against AMS and the other defendants. This settlement agreement addresses the majority of issues raised in the petition. The staff requested the petitioner's views regarding the impact of the settlement agreement on the petition by letter dated 2/3/97.

Facility:

Advanced Medical Systems. Inc.

Fetitioner:

Northeast Ohio Regional Sewer District Date of Petition:

8/19/94 Director's Decision To Be Issued by:

NMSS Date Referred to Review Organization:

8/29/94 EDO Number:

10395' OGC Number:

P-94-020 Scheduled Completion Date:

3/30/97 Last Contact with Petitioner (s):

2/3/97 Petition Manager:

J. DeCicco Case Attorney:

R. Weisman Issues / Action Requested:

Amend AMS license to install, maintain, and operate alarms on all drains from London Road facility.

l l

Current Status:

An acknowledgment letter was issued on 9/7/94. The staff l

completed its research of Picker Corporation's (previous licensee) license file to establish use/ discontinuance of flow-rate alarms in the 1970s. On 12/29/94 the Sewer District requested a license renewal hearing per Subpart l

L, 10 CFR 2.1205. The staff met on 3/14/95 to discuss the petition. The scheduled completion date was delayed in June 1995 because of a license amendment request from AMS on 3/22/95, which requested installation of a sampling system on a proposed lateral sewer line. The completion l

date was extended in August 1995 to allow time for completion of the staff's review. The staff provided status updates to the petitioner by telephone on 5/30/95, 8/1/95, 10/3/95, 12/4/95, 2/12/96, 4/16/96, 6/18/96, l

8/20/96, 10/22/96, and 12/20/96. The completion date was l

extended in January 1997 to 3/30/97 to allow for the staff's review of the draft Director's Decision. The staff requested the petitioner's views regarding the impact of a settlement agreement on the petition by letter dated 2/3/97.

Facility:

Gyster Creek Nuclear Generatine Station i

Petitioners:

P. Gunter and W. de Camp, Jr.

Date of Petition:

9/19/94, as supplemented 12/13/94 4

f j

Director's Decision To Be Issu2d by:

NRR J

Date Referred to Review Organization:

9/29/94 ED0 Number:

10473 OGC Number:

P-94-023 Scheduled Completion Date:

3/31/97 Last Contact with Petitioner (s):

1/10/97 i

Petition Manager:

R. Eaton Case Attorney:

G. Longo f

Issues / Action Requested:

Immediately suspend Oyster Creek license until the j

licensee (1) inspects and repairs or replaces all safety-class reactor internal component parts subject to embrittlement and cracking, (2) provides an analysis on the synergistic effects of through-wall cracking of multiple safety-class components, and (3) addresses generic spent fuel pool design deficiencies of Oyster Creek.

Current Status:

An acknowledgment letter was issued on 10/27/94. On 12/13/94, the petitioners sent a letter appealing NRC's denial to immediately suspend Oyster Creek's operating j

license. The petitioners stated that the staff did not address their concerns regarding reactor vessel internal j

cracking and spent fuel pool cooling. The staff indicated 4

4 that it is treating the 12/13/94 letter as a supplement to j-the 9/26/94 petition. A letter responding to the petitioners' appeal was issued on 4/10/95.. The staff also indicated that NRC regulations make no provisions for appeal or reconsideration of such administrative 3

-determinations. The staff advised the petitioners that they provided no bases for. revisiting the denial of the 9/19/94 request for immediate suspension of the license.

On 3/20/95, a letter was sent to the petitioners, for i

information only, transmitting an NRC letter dated 3/8/95 to Messrs. Lochbaum and Prevatte relating to the safety of spent fuel pool storage at the Susquehanna Steam Electric 4

Station. On 5/22/95, Paul Gunter called to request information regarding Oyster Creek shroud bracket fabrication. The petition manager provided the requested i

information by telephone on 5/23/95.

4 l

On 6/16/95, Paul Gunter called to ask why GPUN was moving i

fuel. The NRC staff advised Mr. Gunter that to the best of its knowledge, the fuel was being moved to a different area of the spent fuel pool to prepare for moving fuel to the dry fuel storage facility. The staff advised 4

Mr. Gunter that GPUN did not intend to transfer the failed fuel element into the dry fuel storage facility.

1 The staff issued a partial Director's Decision (DD-95-18) i on 8/4/95 denying Requests (1) and (2) of the 9/19/94 s

i petition and Request (1) of the 12/13/94 supplemental petition.

In a letter of 9/1/95, the Secretary of the Commission advised the petitioners that the allowed time 4

provided by NRC regulations within which the Commission may act to review Director's Decision 95-18 had expired; -

i accordingly, Director's Decision 95-18 became a final i

agency action on 8/28/95. Paul Gunter called on 9/14/95 l

to make sure that the staff was continuing to review the spent fuel pool cooling concern. The petition manager advised Mr. Gunter that the staff is reviewing this issue generically and that upon completion of its review, NRC will provide him with its evaluation.

In a letter of 11/22/95 to the petitioners, the staff updated the status of its generic review and indicated that it had completed onsite assessments of spent fuel operations at four sites in addition to the detailed review at Susquehanna Steam Electric Station in response to the 10 CFR Part 21 report. The scheduled completion date was extended in January 1995 to 1/30/96, and again in January 1996 to 7/31/96 because of additional time required for staff review and resolution of issues on a generic action plan on spent fuel storage.

In a letter to the petitioners of 1/24/96, the staff updated the status of the petition and enclosed a copy of Information Notice (IN) 95-54, " Decay Heat Management Practices During Refueling Outages," dated 12/1/95. The staff provided a status update to the petitioners by telephone on 2/29/96.

On 4/24/96, the staff informed the petitioner of a change in the NRC petition manager.

The staff received several completion date extensions in 1

1996 to allow for staff review of the draft Director's Decision. The petitioner was contacted by telephone on 7/16/96, 10/8/96, and 1/10/97 and informed of the changes in the scheduled completion date.

Facility:

Georata Tech and All Licensees Petitioner:

P. Blockey-O'Brien Date of Petition:

10/23/94; supplemented 11/12/94, 12/4/94, 2/21/95, 2/23/95, 3/6/95, 3/28/95, 4/18/95, 5/18/95, 6/27/95, 7/18/95, 8/18/95, 8/21/95, 8/28/95, 8/31/95, 9/17/95, 10/27/95, 1/10/96, 1/27/96, 3/14/96, and 5/24/96 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

11/15/94 EDO Number:

10598 OGC Number:

P-94-027 Scheduled Completion Date:

6/30/97 Last Contact with Petitioner (s):

1/28/97 Petition Manager:

M. Mendonca Case Attorney:

M. Stein Issues / Action Requested:

Withdraw license from, shut down, and decommission the Neely Nuclear Research Reactor at the. Georgia Institute of Technology; revoke all licenses to discharge radioactive wastes to sewers and waters of the United States and oceans of the world, and revoke all licenses that use as low as reasonably l

achievable criterion; and add requirements to

_6_

t license for the transpcrtation of radioactive material and to prohibit the transport of radioactive material by mail.

Current Status:

The petitioner was informed on 11/21/94 that the 2.206 process is a public process.. An acknowledgment letter was issued on 11/22/94. The petitioner was contacted and has responded with supplemental letters dated 11/12/94, 12/4/94,2/21/95,2/23/95,3/6/95,3/28/95,4/18/95, 5/18/95, 6/27/95, and 7/18/95. The scheduled completion date of the initial response letter was delayed in February 1995 because of the increased scope as a result of supplements and potential hearing issues. A status update letter was sent to the petitioner on 6/5/95. The scheduled completion date was extended in July 1995 to accommodate the remaining necessary reviews.

The staff issued a partial Director's Decision (DD-95-15) on 7/31/95 denying the requested actions based on the petition issues considered to date. The final Director's Decision will depend on the license renewal process, including potential Atomic Safety and Licensing Board hearings and appeals.

In a letter dated 8/29/95, the Secretary of the Commission informed the petitioner that I

the partial Director's Decision constituted the final action of the Commission on the petition issues considered l

to date.

On 9/12/95, the staff responded to the petitioner's additional letters of 8/18/95, 8/21/95, 8/28/95, and 8/31/95. The staff received additional letters dated 9/17/95,10/27/95, 1/10/96, 1/27/96, and 3/14/96. The staff provided a status update to the petitioner by letter dated 9/12/95. On 11/15/95, the petitioner was again informed of the status of the response to the petition via personal interaction at a Georgia Tech Research Reactor prehearing conference. The petition manager provided a status update to the petitioner by telephone on 1/22/96.

A written update responding to the petitioner's 10/27/95, 1/10/96, 1/27/96, and 3/14/96 letters was sent to the petitioner on 3/22/96. The petitioner was contacted on 5/22/96 by the petition manager at a limited appearance hearing for the ongoing license renewal proceeding. The petitioner was informed that evaluation of the petition was pending completion of the ongoing Atomic Safety and Licensing Board (ASLB) proceeding. The petitioner sent in a supplement dated 5/24/96, which was docketed and provided to the ASLB panel for the license renewal proceeding during the limited appearances on 5/22/96.

In a telephone conversation on 5/31/96, the petitioner l

indicated to an NRC Region II official that she disagreed with the partial Director's Decision of 7/31/95. This was responded to by letter dated 9/26/96. On 6/17/96, the petitioner called the NRC Chairman to indicate that her i

I supplement of 5/24/96 included all the information that the petitioner felt was related to the petition. The.

petiticn manager returned the call on 6/18/96 and discussed the status of the 2.206 review with the petitioner.

Because of delays in the scheduled completion of the ASLB i-hearing on the remaining contention, the completion date-for this petition was extended to 6/30/97. The petitioner was contacted by telephone on 8/16/96 to discuss the status of the petition. A status update letter was sent to the petitioner on 10/24/96. The petitioner was contacted by telephone on 12/31/96 and 1/28/97 and informed of the status of the petition which is awaiting l

the ASLB decision.

Facility:

Millstone Petitioner:

A. Ross Date of Petition:

1/15/95; supplements of 10/28/94 and 10/14/95 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

2/7/95 EDO Number:

10600 OGC Number:

P-95-007 Scheduled Completion Date:

3/30/97 Last Contact with Petitioner (s):

3/3/97 Petition Manager:

J. Andersen Case Attorney:

S. Chidakel Issues / Action Requested:

Take " accelerated" enforcement action against Northeast Utilities for violations at Millstone involving procedure compliance, work control, and tagging control.

Current Status:

An acknowledgment letter was issued on 2/23/95. The i

petitioner submitted additional information on 2/8/95, 2/20/95, and 2/23/95.

In the 2/23/95 letter, the petitioner requested that the EDO act on the petition as soon as possible. The staff responded to the additional submittals on 3/20/95. Status update letters were sent to the petitioner on 5/9/95, 7/19/95, and 10/4/95. The status of the petitions was discussed in telephone calls with the petitioner on 5/25/95,6/2/95,7/24/95,8/14/95, 9/22/95, and 5/29/96. On 5/30/95 and 6/2/95, the NRC staff discussed Northeast Utilities' letters of 3/15/95, 3/24/95, and 5/12/95 in telephone calls with the petitioner. Based on a copy of the petition obtained by Northeast Utilities, the licensee voluntarily provided a response to the petition on 5/12/95. An inspection (50-245/95-22, 50-336/95-22, 50-423/95-22) was conducted at i

the site in May and June 1995 to audit the licensee's response to the petitioner's concerns. The licensee responded with its investigation into the matters during the first quarter of 1995.

Because the results from the j

inspection were needed to prepare the Director's Decision, the scheduled completion date was extended in 1995.

I i

In a letter dated 10/9/95, the petitlener statzd that the NRC update letters were inadequate.

In a letter dated i

10/16/95, Congressman Gejdenson requested information i

concerning the petitioner's 10/9/95 letter. The staff i

l responded to the petitioner on 12/12/95 (and to l

Congressman Gejdenson on 12/14/95) and provided a status l

update on his petitions.

l In a letter dated 10/14/95, the petitioner submitted an additional 10 CFR 2.206 request. On 11/24/95 the staff l

responded to the petitioner's 10/14/95 letter and informed the petitioner that its 10/14/95 letter will be treated as a supplement to this petition. On 2/7/96, 4/16/96, 8/12/96, 10/11/96, 1/8/97, and 3/3/97, the staff sent status update letters to the petitioner. The completion date was extended several times in 1996 to allow time for further staff review.

Facility:

Millstone Petitioners:

G. Galatis, and E. Hadley on behalf of We the People, Inc.

Date of Petition:

8/21/95, supplemented 8/28/95 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

8/30/95 EDO Number:

603 i

OGC Number:

P-95-015 Scheduled Completion Date:

5/31/97 Last Contact with Petitioner (s):

2/21/97 Petition Manager:

S. Dembek Case Attorney:

R. Hoefling Issues / Action Requested:

The petitioners allege that Northeast Utilities (NU) has offloaded more fuel assemblies into the spent fuel pool than permitted under License Amendments 39 and 40; that NU has knowingly operated N111 stone in violation of its operating licenses; and that NU has submitted material false statements.

Petitioners seek institution of a proceeding to suspend the operating license for Millstone Unit I for 60 days after the unit is brought into compliance with the license and the design basis.

In addition, the petitioners request that the operating license be revoked until the facility is in full compliance with the terms and conditions of its license; before reinstatement of the license, a detailed independent analysis of the offsite dose consequences of total loss of spent fuel pool l

water be conducted; that enforcement action be l

taken against NU pursuant to 10 CFR 50.5 and 50.9; that actions be taken regarding a proposed license amendment pending before the Commission wherein NU seeks to increase the amount of spent fuel it may offload and that the amendment be denied; that the

[

NGC retain an independent expert, at NU's expen::e, 1

! l

I to prGpare a safety analysis report on the proposed amendment; and that, before the issuance of any amendment, an analysis including both the probability and consequences of applicable events be conducted.

In the supplement, Mr. Galatis i

raises additional concerns. These concerns are that NU also committed violations by offloading more than one-third of a core of fuel at Millstone Units 2 and 3 and Seabrook Unit 1.

In addition, with regard to Millstone Unit 3, Mr. Galatis is concerned that NU submitted a material false statement to the NRC associated with a license amendment and that an unanalyzed condition exists with regard to system piping for full-core offload events. With regard to Seabrook Unit 1, Mr. Galatis is concerned about technical i

specification violations associated with a l

criticality analysis. Finally, the petitioners make the additional request that a public hearing i

be held in the vicinity of Millstone Unit I to permit comment by the public on the issues raised in the petition.

Current Status:

Northeast Utilities (NU) voluntarily provided its response i

to the 8/21/95 letter on 9/22/95 and to the 8/28/95 i

supplement on 10/11/95. On 9/22/95, the staff contacted 1

the petitioner to inform him that issuance of the j

acknowledgment letter had been delayed because of ongoing investigations by the Office of Investigations (01) and the Inspector General (IG) as well as independent NRC reviews. The staff also informed the petitioner that if he wanted to intervene in the Millstone Unit I spent fuel 4

pool amendment, he had until 9/29/95 to do so. The acknowledgment letter was issued on 10/26/95.

]

The staff completed its review of the licensee's amendment

)

request and on 11/9/95 issued the amendment and safety i

evaluation. The staff reviewed the IG and 01 reports to 1

determine if future inspections at Millstone were needed.

1 A spent fuel pool inspection was conducted at Millstone in

)

March 1996 to review the 10 CFR 2.206 concerns as well as other spent fuel pool issues. The scheduled completion 1

date was extended in February 1996 to 7/30/06 because of 4

technical issues requiring further staff review. On 2/1/96 and 4/9/96, the staff issued status update letters to the petitioner. On 2/5/96, a federal Register notice was issued announcing a 10 CFR 2.206 informal public hearing to be held on 3/7/96. The 3/7/96 meeting was postponed because of poor weather. The meeting that was subsequently held on 4/8/96 was well attended and there was considerable public interest in the issues raised in the petition. However, the staff did not identify any significant new safety issues recuiring further staff action. On 4/12/96 the staff mailed the petitioners and the licensee an advance copy of the 4/8/96 meeting 1

transcript. On-4/24/96 the staff called the petitioners the official transcript.

i On 6/7/96 the staff issued a status update letter to 'the petitioners. The update letter included a 5/21/96 report on the NRC's survey of refueling practices and a 5/17/96 letter from NU that answered an NRC question raised during the 4/8/96 informal public hearing. On 7/19/96 the staff i

l issued a status update letter to the petitioners and sent i

.the petitioners a copy of the NRC inspection report for the Millstone I spent fuel pool issues. The completion i

date was extended in August 1996 to 10/31/96, and again in October 1996 to 5/31/97 to allow for additional staff l

review. On 9/19/96 the staff issued a status update letter to the petitioners and sent the petitioners an NRC memorandum dated 7/26/96 informing the Commission of the i

resolution of the spent fuel storage pool action plan issues. On 11/15/96 the staff issued a status update letter to the petitioners which included an example of a 10 CFR 50.54(f) letter sent to all plants (except Millstone) requiring information that will provide the staff with added assurance that plants are operated and maintained in accordance with their design bases and any deviations are reconciled in a timely manner. On 12/26/96, the staff issued a partial Director's Decision l

(DD-96-23) that addressed the technical aspects of the l

petitioners' requests. The wrongdoing aspects are still l

under review and will be addressed in a subsequent Director's Decision. On 2/21/97, the staff issued a status update letter to the petitioners which included the slides used by staff of the NRC's Office for Analysis and Evaluation of Operational Data during their 2/5/97 public presentation of their generic assessment of spent fuel-cooling..

See Attachment 3 for further information.

Facility:

National Institutes of Health (NIH)

Petitioners:

Drs. M. Ma and B. Zheng (D. Katz)

Date of Petition:

10/10/95 Director's Decision To Be Issued by:

NMSS Date Referred to Review Organization:

10/10/95 EDO Number:

721 OGC Number:

P-95-021 Scheduled Completion Date:

3/31/97 Last Contact with Petitioner (s):

3/6/97 Petition Manager:

C. Jones Case Attorney:

G. Longo Issues / Action Requested:

(1) Suspend or revoke materials license of NIH because of willful, reckless, and deliberate l

violation of numerous regulatory requirements l

resulting in internal contamination of the l

petitioner, the petitioner's fetus, and other NIH employees; (2) take other appropriate enforcement

l l

3 acticn against NIH for its willful and reckless violation of 10 CFR Part 20.

Current Status:

The petitioner was informed on 10/17/95 that the 2.206 process is a public process. An acknowledgment letter was issued on 10/30/95. The request that license no. 19-00296-10 be immediately suspended or revoked pending resolution of the petition was denied in the i

acknowledgment letter. On 11/2/95, the NRC issued a j

demand for information to NIH in which it requested that NIH submit a complete and thorough response to each of the issues raised in the petition. The response was received by the NRC on 12/11/95. The NRC, in a letter to NIH dated 1/29/96, forwarded to NIH a redacted version of a 1995 augmented team inspection (AIT) report and scheduled an

)

i open predecisional enforcement conference at NRC j

Headquarters on 2/26/96. NIH responded in a letter dated 1

2/14/96 requesting an extension of the predecisional enforcement conference until the middle of April.

In a letter dated 3/19/96 to NIH's General Council, the NRC stated that the open predecisional enforcement conference l

had been set for 4/19/96 at NRC Headquarters and that several apparent violations identified during the 1995 NRC j

AIT, as well as during a special inspection conducted in late 1995, would be discussed at the conference.

The petitioners submitted a reply (dated 3/25/96) to NIH's response to NRC's Demand for Information which discusses a number of concerns raised by NIH's submittal to the NRC (dated 12/11/95). On 3/25/96 NIH wrote to NRC's General 4

Counsel requesting, among other items, that the NRC hold the predecisional enforcement conference in Region I, and that the meeting be held as a closed meeting not open to l

the public. Subsequently, a representative from NRC's i-Office of the General Counsel informed NIH that NRC's

}

plans were to go forward with an open conference on t

4/19/96. NIH responded in writing (letter dated 4/16/96) l and informed the NRC that NIH would not attend the enforcement conference scheduled on 4/19/96 in order to preserve privacy interests associated with the issues raised and would instead make a written submission to the i

NRC AIT inspection report by 5/24/96.

The staff notified the petitioner of a delay in the completion date by telephone on 5/6/96. NIH submitted its response on 5/23/96 (which was received by NRC on 5/28/96) to the apparent violations as described in an NRC letter dated 1/29/96. The staff reviewed the document and on 6/6/96 placed a copy of the NIH redacted response in the NRC Public Document Room. The petition manager provided a 1

status update to the petitioner by telephone on 6/5/96.

The staff issued a Notice of Violation (NOV) and proposed j

imposition of civil penalty on 8/23/96 regarding the failure to secure from unauthorized removal or limit access to licensed materials that were stored in unrestricted areas. The petitioner was contacted by i

telephone on 8/23/96 and informed that the staff had 1.

extendGd the completion date to allow time for additional i

staff review of the exposure events.

On 9/23/96, NIH responded to the above-referenced NOV, and protested the proposed imposition of a civil penalty for violations of security requirements, as well as other violations cited in the 8/23/96 NOV. The staff extended the completion date for this petition to 2/28/97 to allow sufficient time for review of the NIH response and appropriate staff action. On 1/14/97 the staff forwarded to both NIH and the petitioner a complete version of a 1995 augmented inspection team report along with a copy of the final medical consultant's report. As requested by the petitioner, the petition manager informed the petitioner on 2/4/97 that the NRC's Office of Investigations (01) had completed its report regarding this incident. The staff is currently reviewing the 01 report and has extended the completion date to 5/31/97 to accommodate this review. See Attachment 3 for further details.

I k

Facility:

Westinahouse Electric Corporation Petitioner:

Shannon T. Doyle Date of Petition:

5/30/96 Director's Decision To Be Issued by:

OE Date Referred to Review Organization:

6/5/96 EDO Number:

GT96400 OGC Number:

P-96-014 Scheduled Completion Date:

3/31/97 Last Contact with Petitioner (s):

11/5/96 Petition Manager:

N. Mamish Case Attorney:

S. Chidakel 4

s Issues / Action Requested:

Requests the NRC to take immediate v. tion and issue a show cause order or civil penalty pertaining to Westinghouse's allegedly providing false information to the Department of Labor (DOL)

Administrative Law Judge concerning qualifications for health physics (HP) technicians at Westinghouse.

Current Status:

The petitioner was contacted by telephone on 7/7/96. An acknowledgment letter was issued on 8/16/96 that (1) 2 denied the petitioner's request to institute a show cause order or civil penalty; (2) requested additional information from the petitioner relating to missing pages from an enclosure from the National Registry of Radiation i

Protection Technologists (NRRPT); (3) requested a complete copy of the transcipt of the testimony given in the hearing before the DOL Administrative Law Judge; and (4) requested additional clarification regarding the alleged false. statement by Westinghouse. A separate letter was.

h l

ssnt to Westinghause en 8/16/96 rsquesting a response l

within 30 days to the issues raised in the petition.

The petitioner contacted the NRC's Office of Enforcement on 9/5/96 to determine if Westinghouse was required to respond to the staff's letter of 8/16/96, and whether the petitioner could get a copy of Westinghouse's letter before responding to the staff's letter to him of S/16/96.

The staff contacted the petitioner on 9/6/96 and informed him that Westinghouse is not a licensee of the Commission l

and therefore is not required to respond to the staff's t

letter, and that the petitioner could get a copy of l

Westinghouse's response, but that the petitioner cannot i

wait on the Westinghouse response before responding to the i

NRC's letter to him, i

i On 9/30/96, the staff contacted the petitioner by l

telephone to identify whether he had responded to the l

staff's letter of 8/16/96. The petitioner stated that he l

would mail his response by 10/4/96. On 10/15/96, the l

staff received the petitioner's response to the staff's l

1etter of 8/16/96.

In addition, the staff spoke with the petitioner on 10/15/96 and informed him that the staff had i

received his response and that it was being reviewed.

Also on 10/15/96, Westinghouse contacted the staff and requested an extension (until 11/8/96) to respond to the l

staff's letter of. 8/16/96. The staff granted i

Westinghouse's request. The scheduled completion date was extended in November 1996 to 1/31/97, and again in January 1997 to 3/31/97 to allow time for additional staff review.

A Director's Decision has been drafted and is under review.

Facility:

Shielda11ov and Cvoress Foote foreviously Foote Nineral)

Petitioner:

S. Bauman Date of Petition:

7/22/96 Director's Decision To Be. Issued by:

NMSS Date Referred to Review Organization:

8/27/96 EDO Number:

GT96596 OGC Number:

P-96-019 Scheduled Completion Date:

4/15/97 Last Contact with Petitioner (s):

1/7/97 Petition Manager:

J. Kennedy Case Attorney:

M. Rafky Issues / Action Requested:

Requests that Foote Mineral's license be reinstated, and that Shieldalloy and Cypress Foote be made co-responsible licensees with regard to the proper remodiation and decommissioning of the Shieldalloy site. Also requests that any and all parties found to be involved in any wrongdoing as alleged in this complaint be terminated from employment, and that where appropriate, criminal charges be pursued. Requests that the environmental. impact statement now being performed i ;

b.

for the Shieldalloy site be terminated, and that i-Shieldalloy and Cypress Foote be jointly ordered to submit a decommissioning plan for licensed materials that includes only a plan to remediate licensed materials (to include grading and evaluation of all various assorted options, l

including disposal at a licensed disposal facility).

Finally, the petition requests that the Ohio Environmental Protection Agency and Department of Health evaluate all unlicensed slag found at the Shieldalloy site.

In Section Two of the petition, the petitioner alleges that j

Shieldalloy's decommissioning plan would l

wrongfully six licensed and unlicensed waste, j

i l

Current Status:

The petitioner was contacted on 10/2/96 and informed that the 2.206 process is a public process. An acknowledgment letter was issued on 10/11/96. The scheduled completion i

date was revised in December 1996 to 3/31/97, and again in January 1997 to 4/15/97 to allow additional time for staff

{

l review. The petitioner was informed of the change in j

status by telephone on 1/7/97.

Facility:

Naine Yankee and All Other Plants Usina the RELAP Code for ECCS 1.nalyses i

Petitioner:

P. Sears Date of Petition:

8/19/96

)

l Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

9/6/96 EDO Number:

GT96659 OGC Number:

P-96-020 Scheduled Completion Date:

4/20/97 Last Contact with Petitioner (s):

1/27/97 i.

Petition Manager:

P. Tam j

Case Attorney:

G. Longo j

l Issues / Action Requested:

Requests the NRC take action with regard to the i

Maine Yankee Nuclear Power Station and all users l

of the RELAP computer code for emergency core l

cooling systems (ECCS). Specifically, the petitioner requests that the NRC fine Maine Yankee Atomic Power Company and Yankee Atomic Electric Company if computer runs have not been kept in accordance with YAEC's computer code quality j

assurance procedures, and that the NRL inspect all users of RELAP and fine those users not operating within required computer code verification procedures.

]

Current Status:

An acknowledgment letter was issued on 9/24/96. The i

petitioner manager was changed in December 1996 and the J

scheduled completion date was extended to 4/20/97. A i

status update letter was issued on 1/27/97 informing the j

petitioner of the status of the petition.

i 1.

J Facility:

Northern States Power Connany ISFSI Petitioner:

Florence Township, MN Date of Petitions: 8/26/96 '

Director's Decision To Be Issued by:

NHSS Date Referred to Review Organization:

9/13/96 EDO Number:

GT96669/GT96670 1

OGC Number:

P-96-021 Scheduled Completion Date:

On hold pending completion of i

adjudicatory proceedings Last Contact with Petitioner (s):

1/2/97 Petition Manager:

M. De111gatti Case Attorney:

L. Clark j

Issues / Action Requested:

Two petitions request that the NRC take various actions regarding Northern States Power Company's (NSP) application for an Independent Spent Fuel Storage Installation (ISFSI). Specifically, petitioner requests that the NRC reject NSP's application for an ISFSI, or, in the alternative, suspend taking any action on the application pending the completion of litigation in the State courts. Requests that NSP be required to name the local governments expected to respond in the event of an emergency and allow 60 days for local governments to comment on the proposed emergency 4

plan. Requests the NRC take enforcement action i

against NSP for violating the requirements of 10 CFR 72.32(a)(14) by not permitting the petitioner l

to comment on the proposed emergency plan before submission to the NRC.

Specifically, the NRC is asked to impose a penalty in the amount of one million dollars and require NSP to compensate petitioner in the amount of $7500 for time expended by its Board and attorney in attempting to obtain the emergency plan before submission to the NRC.

Current Status:

The attorney for the petitioner was informed on 10/3/96 that the 2.206 process is a public process. The staff has determined that only the request for enforcement action falls within the purview of 10 CFR 2.206. All other aspects of the petition will be considered as part of NSP's application for the offsite ISFSI. An acknowledgment letter was issued on 10/11/96.

The petitioner's attorney was informed by the staff on 11/22/96 that the petition addressed issues that were also part of adjudicatory proceedings associated with petitions to intervene. Therefore, no Director's Decision could be made until the adjudicatory proceedings were completed.

Furthemore, the applicant has requested, and the staff has granted, a request that the license application review be suspended pending completion of Minnesota State judicial pr:ceedings which could critically impact the continuation of the project. Subsequently, the Atomic Safety Licensing Board Panel which had scheduled a pre-hearing conference on the petitions to intervene also suspended its proceedings until the State court action is completed. The petitioner was contacted on 1/2/97 and infomed of the status of the petition.

Facility:

Point Beach Petitioner:

D. Duas on behalf of Wisconsin's Citizens' Utility Board Date of Petitions: 9/30/96 Director's Decision To Be Issued by:

NRR i

Date Referred to Review Organization:

10/2/96 EDO Number:

GT96774 OGC Number:

P-96-022 Scheduled Completion Date:

3/31/97 Last Contact with Petitioner (s):

1/27/97 Petition Manager:

W. Reckley Case Attorney:

L. Clark Issues / Action Requested:

(1) Order Wisconsin Electric Power Company (WEPCO) to retain 24 empty and available spaces in the Point Beach spent fuel pool to provide the capability to permit retrieval of spent fuel from a VSC-24 cask in the event of an accident requiring removal of spent fuel from the cask or j

in the event that conditions of the Certificate of i

Compliance (C0C) for the VSC-24 require removal of spent fuel from the cask, until such time that WEPC0 has other options'available to it to remove spent fuel from a cask in the event conditions warrant it.

(2) Order users of the VSC-24 cask not to load VSC-24 casks until the COC, Safety Analysis Report (SAR) and Safety Evaluation Report (SER) are j

amended to contain operating controls and limits that prevent hazardous conditions, including but not limited to the generation of explosive gases, due to VSC-24 material reactions with environments encountered during loading, storage, and unloading

)

of the VSC-24 cask.

Current Status:

The petitione: was informed on 10/3/96 that the 2.206 process is a public process. An acknowledgment letter addressing the petitioner's immediate concern regarding offloading of the reactor core during the Point Beach Unit 2 refueling outage was issued on 10/11/96. The status of staff reviews related to NRC Bulletin 96-04, potential loading dates for VSC-24 casks, and staff activities related to the petition were discussed with the petitioner during a telephone conversation on 10/31/96. The petitioner was contacted by telephone on 12/3/96 to inform him that the confirmatory action letter had been closed -

for Arkansas Nuclear Ona and that cask loading would be i

initiated at that facility. An acknowledgment letter denying the petitioner's second request was issued on 12/10/96. Material relevant to the petition was forwarded to the petitioner by letters dated 11/7/96 and 1/27/97.

The scheduled completion date was extended in February 1997 to 3/31/97 to accommodate staff review of the draft j

Director's Decision.

Facility:

Shieldalloy Petitioner:

S. Bauman Date of Petitions:

10/11/96 and 2/7/97 Director's Decision To Be Issued by:

NMSS Date Referred to Review Organization:

10/23/96 EDO Number:

GT96775/GT97085 OGC Number:

P-96-023 Scheduled Completion Date:

4/5/97 Last Contact with Petitioner (s):

3/7/97 3

Petition Manager:

G. Comfort Case Attorney:

M. Rafky Issues / Action Requested:

Requests that Shieldalloy's license for its Newfield, New Jersey site be revoked and

" downgraded" to one permitting possession of low-level radioactive wastes for the purpose of decommissioning only.

Petition also asserts, as a

]

basis for this request, that Shieldalloy cannot meet NRC financial assurance requirements.

Current Status:

An acknowledgment letter was issued on 11/14/96. The j

petitioner submitted an additional petition on 2/7/97 which will be combined with the first petition and e

answered simultaneously. An acknowledgment letter for the 2/7/97 petition was issued on 3/7/97.

Facility:

San Onofre Nuclear Generatina Station Petitioner:

S. Dwyer Date of Petition:

9/22/96, as supplemented 12/10/96 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

10/24/96 EDO Number:

GT96778 OGC Number:

P-96-024 Scheduled Completion Date:

On hold - awaiting additional information from petitioner Last Contact with Petitioner (s):

2/6/97 Petition Manager:

M. Fields Case Attorney:

H. McGurren Issues / Action Requested:

Requests the NRC shut down the San Onofre Nuclear Generating Station "as soon as possible" pending a complete review of the "new seismic risk."

i i

Current Status:

The petitiener tras centactsd by internet electronic gail on 10/16/96 and informed that the 2.206 process is a i

public process. An acknowledgment letter was issued on 11/22/96. A second letter was sent to the staff from the petitioner on 12/10/96 which provided additional l

information regarding the petition. A supplemental j

acknowledgment letter to.the petitioner in response to the i

12/10/96 letter was issued on 2/6/97. The 2/6/97 letter informed the petitioner that the staff's review of the petition would be placed on hold until all the relevant information in support of the petition (as alluded to in l

the 12/10/96 supplement) had been provided to the staff.

i Facility:

All Users of the VSC-24 Nuclear Waste Storace Cask i

Petitioners:

M. Sinclair and E. Roemer on behalf of Don't Waste Michigan and Lake Michigan Federation, respectively l

Date of Petition:

10/18/96 1

Director's Decision To Be Issued by:

NMSS 3

Date Referred to Review Organization:

11/13/96 EDO Number:

GT96801 OGC Number:

P-96-025 l

Scheduled Completion Date:

~4/11/97 i

Last Contact with Petitioners:

12/10/96 Petition Manager:

M. Bailey Case Attorney:

L. Clark l

Issues / Action Requested:

Prohibit the loading of any and all VSC-24 nuclear j

waste storage casks by users of the cask under the i

general license, until the NRC, following an independent third party review of the VSC-24 cask design, has amended the Safety Analysis Report i

(SAR), Safety Evaluation Report (SER), and 1

Certificate of Compliance (C0C) to address the significant safety concerns raised in the t

petition.

l Current Status:

The petitioners were contacted by telephone on 11/26/96 4

and informed that the 2.206 process is a public process.

On 12/3/96 and 12/4/96, the petitioners were informed by i

telephone that the confirmatory action letter for Arkansas

,]

Nuclear One (ANO) had been closed and that ANO would begin loading spent fuel into a VSC-24 cask. An acknowledgment 3

letter was issued on 12/10/96. A representative from the National Association of Corrosion Engineers (NACE) was contacted on 1/3/97 and 1/13/97 to gather information on NACE and to discuss the possibility of having NACE perform a third-party review of the cask, as requested by the petitioners.

Facility:

Connecticut Yankee and Millstone Units 1. 2. and 3 Petitioners:

D. Katz, Citizens Awareness Network and P. Gunter, Nuclear Information and Resource Service Date of Petition:

11/25/96, as amended 12/23/96 i --

i Director's Decision To Be Issued by:

NRR 4

Date Referred to Review Organization:

12/20/96

)

ED0 Number:

GT96919 OGC Number:

P-96-026 Scheduled Completion Date:

5/31/97 i

Last Contact with Petitioners:

2/4/97 l

Petition Manager:

D. Mcdonald j

Case Attorney:

R. Hoefling Issues'/ Action Requested:

Petitioners request the staff to take the following actions:

(1) immediately suspend or revoke Northeast Utilities'-(NU) license to j

operate the Connecticut Yankee (CY) and Millstone reactors due to chronic mismanagement; (2) investigate the possibility that NU made material misrepresentations to the NRC concerning engineering calculations and other information or actions relied upon to assure the adequacy of safety systems at CY and Millstone; (3) if an investigation determines that NU deliberately

{

provided insufficient and/or false or misleading information to the NRC, revoke NU's operating licenses for CY and Millstone, or, if not, keep the reactors off-line pending a Department of i

Justice independent investigation; (4) if the j

reactors remain operating, petitioners request that they remain on the NRC's " watch list"; (5) 4 i

keep CY and Millstone off-line until NU's chronic mismanagement has been analyzed, remedial management programs put into effect and the NRC l

has evaluated and approved the effectiveness of i

NU's actions; (6) in the event NU decides to decommission any or all of the reactors at issue, j

petitioners request the NRC not to permit any decommissioning activity to take place until the l

above issues are resolved; and (7) commence an investigation into how the staff allowed the

}

illegal situation at NU's Connecticut reactors to l

exist and continue over a decade.

f Current Status:

The petitioners were contacted by telephone on 12/19/96

{

and informed that the 2.206 process is a public process.

The videotape which was provided with the petition has

{

been transcribed and placed in the NRC's Public Document 1

Room and the local public document rooms. An acknowledgment letter was issued on 1/23/97. The staff l

indicated in the acknowledgment letter that D. Katz, l

President of CAN had been added to the NRC service lists 2

for the Millstone and Haddam Neck facilities to assure i

that the petitioners receive NRC correspondence relevant j

to the petit 4on. The staff also indicated in the acknowledgment letter that the petition, the supplemental information, and a transcript of the videotape had been s

j sent to the NRC's Office of the Inspector General (IG).

The staff received a letter dated 1/12/97 from CAN and i

NIRS expressing concern that the staff should not respond 4

to the portions of the petition relating to the NRC staff,

l. '

that the IG shsuld be involved in those areas, and that the petitioners had not received the staff's acknowledgment Tetter. The petitioner was contacted on 1/28/97 and 2/4/97 to discuss the 1/12/97 letter.

It was agreed that the. acknowledgment letter had addres' sed the concerns expressed in the 1/12/97 letter.

Facility:

Vermont Yankee Petitioners:

J. Block on behalf of Citizens Awareness Network, Inc.

Date of Petition:

12/6/96 Director's Decision To Be Issued by:

NRR Date Referred to Review Organization:

1/23/97 EDO Number:

GT96950 i

OGC Number:

P-96-027 Scheduled Completion Date:

5/31/97 Last Contact with Petitioners:

2/12/97 Petition Manager:

V. Rooney Case Attorney:

R. Hoefling Issues / Action Requested:

Petitioners request the staff to evaluate two memoranda concerning the Vermont Yankee (VY) nuclear power station and take enforcement action, if it is warranted, based upon the information contained therein. The first document is a Citizens Awareness Network (CAN) memorandum reviewing information presented by the licensee at an enforcement conference involving the VY l

residual heat removal (RHR) system minimum flow valves. The petitioner raises a concern that the corrective action taken by the licensee in opening these valves may have introduced an unreviewed safety question with regard to containment isolation. The second document is a CAN memorandum reviewing certain licensee event reports (LERs) submitted by the licensee on a variety of issues such as fire protection, tornado protection, thermal protection for piping lines, equipment operability and equipment testing.

Current Status:

An acknowledgment letter was issued on 2/12/97.

END OF STATUS REPORT l

l 1 !.

I

Decisions Pending Before the Commission and the Courts t'

Petitioners:

M. Hobby /A. Mosbaugh Facility /EDO No.:

Vogtle/5836 Decision No./(Date):

DD-93-08 (4/23/93) (Partial)

Comments:

Denied. DD-93-08 was vacated and remanded to staff (CLI-93-15).

Petitioner:

T. Cochran, Natural Resources Defense Council Facility /EDO No.:

Envirocare of Utah. Inc./GT97017 Decision No./(Date):

DD-97-02 (2/7/97) (Final)

Comments:

Requests (1), (4), and (5) did not fall within the scope of 10 CFR 2.206 and were not addressed in this DD. Requests (2) and (3) were denied.

i Petitioner:

Toledo Coalition for Safe Energy, et al.

Facility /EDO No.:

Davis-Besse/886 Decision No./(Date):

DO-97-03 (2/5/97) (Final) i Comments:

Granted in part. Denied in part.

Petitioner:

A. Ross i

Facility /EDO No.:

Millstone /15 Decision No./(Date):

DO-97-04 (2/7/97) (Final)

Comments:

Granted in part. Denied in part.

3 Petitioner:

F. Shillinglaw Facility /EDO No.:

Palisades. Point Beach. and Arkansas Nuclear One/872 i

Decision No./(Date):

DD-97-05 (3/4/97) (Final)

'l Comments:

Denied.

END OF DECISIONS PENDING i