OPERATING DATA REPORT DOCKET NO. 50-336 DATE 11/12/85 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 OPERATING STATUS 1.

Unit Name:

Millstone Unit 2 Notes: Items 21 and 22 2.

Reporting Period:

October 1985 cumulative are weighted 3.

Licensed Thermal Power (MWt):

2700 averages.

Unit operated 4.

Nameplate Rating (Gross MWe):

909 at 2560 MW thermal prior 5.

Design Electrical Rating (Net MWe):

870 to its uprating to the 6.

Maximum Dependable Capacity (Gross MWe):

888.75 current 2700 MW thermal 7.

Maximum Dependable Capacity (Net MWe):

857.25 power level. **

8.

If Changes Occur in Capacity. Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745 7296 86352 12.

Number Of Hours Reactor Was Critical 0

3156.4 61233.4 13.

Reactor Reserve Shutdown Hours 0

0 2205.5 14.

Hours Generator On-Line 0

3035.8 57428.8 15.

Unit Reserve Shutdown Hours 0

0 468.2 16.

Gross Thermal Energy Generated (MWH) 0 7817030 145501487 17.

Gross Elec. Energy Generated (MWH) 0 2546300 47227979 18.

Net Electrical Energy Generated (MWH)

(-4081) 2426506 45250029 19.

Unit Service Factor 0

41.6 66.5 20.

Unit Availability Factor 0

41.6 67.0 21.

Unit Capacity Factor (Using MDC Net) 0 39.6 62.2 22.

Unit Capacity Factor (Using DER Net) 0 38.2 61.2 23.

Unit Forced Outage Rate 100 23.7 17.5 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

11/7/85 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

    • Item 21 year-to-date is weighted average as a result of the capacity rating change.

8601080686 851113 PDR ADOCK 05000336 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 11/8/85 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 MONTH October 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the. average daily unit power le' vel in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

1 DOCKET NO. 50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 2 DATE 11/8/85 COMPLETED BY J. Gibson REPORT MONTH October 1985 TELEPHONE (203) 447-1791' Ext. 4431 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence.

8 850927 F

745 H

4 85-14 N/A N/A Continued outage from previous month.

See LER.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data f

B-Maintenance or Test 2-Manual Scram Entry Sheets for License:

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same Source i

H-Other (Explain) 9-Other (Explain)

Docket No. 50-336 Date 11/8/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH October DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/24/85 Reactor Coolant & Vessel "B" RCP Assembly Replaced "B" zero speed module 10/30/85 Reactor Coolant & Vessel RCS Loop RTD's Removed RTD's and cleaned thermo-well 10/24/85 Reactor Coolant & Vessel Zero Speed Switch RCP 40D Replaced speed sensor electronics module 10/7/85' Reactor Coolant & Vessel Reactor Coolant Loop 1B Removed RTD, cleaned well and reinstalled Cold Leg Temp RTD RTD i

i 10/22/85 Reactor Coolant & Vessel RCP 40D Lube Oil to Anti Replaced switch and adjusted Reverse Device Flow Switch 10/4/85 Reactor Coolant & Vessel RCP 40B Upper Oil Resevoir Replace alarm unit Level Alarm 10/24/S5 Reactor Coolant & Vessel RCP 40C Zero Speed Switch Replaced speed sensing electronics module 10/16/85 Reactor Coolant & Vessel RCP Speed Sensor (P408)

Repaired upper speed sensor micro dot' connector 10/22/85 Reactor Coolant'& Vessel RCP Speed Sensor (P40C)

Replaced speed sensor micro dot connector and replaced female connector on the extension cable I

I i

.. _ _ _ ~ _ _ _

t Docket No. 50-336 Date 11/8/85 Unit Name Millstone 2 Completed By G. Neron

~'

Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE'

SUMMARY

FOR SAFETY RELATED EQHIPMENT REPORT MONTH October DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/23/85 Reactor Coolant & Vessel RCP P40A Lower Seal Temp RTD Manufactured and installed new mineral cable 10/16/85 Reactor Coolant & Vessel RCP P40A Controlled Bleedoff Manufactured and installed new mineral Temp RTD cable 10/10/85 Control Room Air Pneumatic Controller Attached disconnected air hose Conditioning 10/25/85 Process and Area Radiation Stack Gas Effluent Rad Replace U9 (negative sign on exponent)

Monitoring Monitor Local Control Panel and MSD, U10.

Reinstalled PC boards 10/24/85 Process and Area Radiation Waste Neut Sump Radiation Cleaned flow meter Monitoring Monitor Sample Flow Indicator 10/17/85 Process and Area Radiation Waste Neut Sump Radiation Replaced detector and calibrated Monitoring Detector 10/16/85 Reactor Protection RPS Panel C Loop (RC05C)

Replaced high voltage power supply 10/12/85 Reactor Regulating S/G #1 Dump to Atmosphere Replaced PIC-4223 Pressure Indicating Contrcl I

i Docket No. 50-336 Date 11/12/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REFORT MONTH October DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/24/85' Main Steam Hydraulic Snubber -

Repaired deficient end connections Hanger #312015B 10/24/85 Main Steam Hydraulic Snubber -

Repaired deficient end connections Hanger #312019 10/24/85 Main Steam Hydraulic Snubber -

Repaired deficient end connections t

Hanger #312017 10/05/85 Safety Injection Tanks Hydraulic Snubber -

Repaired deficient end connections

}

Hanger #410014-l 10/24/85 Safety Injection Tank's Hydraulic Snubber -

Repaired deficient end connections i

Hanger #410086 l

10/24/85 Safety Injection Tanks Hydraulic Snubber -

Repaired deficient end connections i

Hanger #410022 i

10/18/85 Safety Injection Tanks Hydraulic Snubber -

Repaired deficient end connections Hanger #410012 8/28/85' Process & Area Radiation Rad Monitor 8123 Sample Installed rebuilt roots blower

]

Monitoring Fan Assy i

i

Docket No. 50-336

.Date 11/12/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 l

Ext. 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH October 1

4 DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/31/85 Reactor Coolant & Vessel.

RCP "C" Motor Repaired stator damage 10/21/85 CVCS RWST to Charging Pump-Replaced motor and control parts l

Suction Valve Motor i

10/24/85 Boric Acid Boric Acid Pumps Discharge Replaced strainer and cover gasket 1

Strainer 10/12/85 HPSI Loop "1A" Non-Return Check Torqued cover nuts j

Valve 10/12/85 HPSI Loop "1B" Non-Return Check Torqued cover nuts t

Valve 10/22/85 HPSI "B"/"C" HPSI Pumps Suction Torqued switch bolts in bottom Xtie Valve Motor of valve limit switch compartment, set switches and replaced torque j

switch 10/29/85 Car and Cooling "C" CTMT Air Recirc Cooling Replaced fusable links with Unit Fan Assembly 165 degree fusable links 10/18/85 Main Steam S/G #1 Blowdown Control Replaced air regulator and gauge.

Valve Air-Operator Replaced solenoid on valve a

4

Docket No. 50-336 s

't Date 11/8/85 Unit Name. Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT

~

REPORT MONTH October DATE SYSTEM COMPONENT MAINTENANCE ACTION 9/26/85 Main Steam S/G.#2 Atmospheric Dump Machined cover; cleaned seat and Control Valve plug (repair of steam cut) 10/10/85 Aux. Feedwater "A" Aux Feed Pump Replaced pump bearing and set thrust, replaced oil and readjusted flinger 10/28/85 Service Water Strainer Backwash Service Temporary leak repair between "A" Water Drain Pipe SW strainer ~and its backwash valve 10/4/85 Diesel Generator "B" D/G AC Air Compressor Lapped disc of valve, machined seat Assy and tested relief valve 10/15/85 Diesel Generator "B" Eniergency Diesel Pipe Removed, cleaned and doped pipe Cross plug (to repair leak) 10/24/85 CTMT Spray Hydraulic Snubber -

Repaired deficient end connections Hanger #4160148 10/24/85 CTMT Spray Hydraulic Snubber -

Repaired deficient end connections

. Hanger #416014A

Docket No. 50-336

~'

Date 11/8/85 Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH Octotar DATE SYSTEM COMP 0NENT MAINTENANCE ACTION 10/13/85 Process & Area Radiation Rad Monitor 8123 Sample Overhauled roots blower and installed Monitoring Fan Assy 10/24/85 Process & Area Radiation Rad Monitor 8262 Sample Rebuilt blower and installed Monitoring Fan Assy 10/10/85 Process & Area Radiation Sample Return from Cabinet Cleaned and ground seat, blued with Monitoring "B" Check Valve new disc and assembled with new gasket.

10/11/85 Process & Area Radiation Sample Return from Cabinet Ground seat, blued disc and reassembled Monitoring "A" Check Valve with new disc and bonnect gasket

i Docket No. 50-336 j

Date: 11/8/85 J

Completed By: J. Gibson Telephone: (203) 447-1791 Ext. 4431 REFUELING INFORMATION REQUEST 1.

Name of facility: Millstone 2

~

i i

2.

Scheduled date for next refueling shutdown:

August 1986 3.

Schedule date for restart following refueling: October 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Unknown at this time.

5.

Scheduled date(s) for submitting licensing action and supporting information:

A.

Technical support information for reracking the spent fuel pool was submitted on July 24, 1985 to support a proposed license amendment.

6.

Important licensing considerations associated with refueling, e;g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core:

217 (b) 449 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

i Currently 667 Plans are being formulated to rerack the spent fuel pool beginning in December 1985, to incredse the storage capacity to 1106 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent. Fuel Pool, Full Core off load capacity is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.

-