OPERATING DATA REPORT (REVISED DATA)
DOCKET NO. 50-336 DATE 11/13/85 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Extension 4431 OPERATING STATUS 1.
Unit Name:
Millstone Unit 2 Notes:
Item 21 and 22 2.
Reporting Period:
September 1985 (Revised) cumulative are weighted 3.
Licensed Thermal Power (MWt):
2700 averages.
Unit operated 4.
Nameplate Rating (Gross MWe):
909 at 2560 MW thermal prior to 5.
Design Electrical Rating (Net MWe):
870 its uprating to the current 6.
Maximum Dependable Capacity (Gross MWe):
888.75
- 2700 MW thermal power 7.
Maximum Dependable Capacity (Net MWe):
857.25
- level **
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
- The change in capacity ratings is the result of secondary side efficiency work performed at the end of the previous cycle outage.
9.
Power Level To Which_ Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cunulative 11.
Hours In Reporting Period 720 6551 85607 12.
Number Of Hours Reactor Was Critical 637.1 3156.4 61233.4 13.
Reactor Reserve Shutdown Hours 0
0 2205.5 14.
Hours Generator On-Line 635.1 3035.8 57428.8
- 15. Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 1710661 7817030 145501487
- 17. Gross Elec. Energy Generated (MWH) 559300 2546300 47227979 18.
Net Electrical Energy Generated (MWH) 538330 2430587 45254110
- 19. Unit Service Factor 88.2 46.3 67.1 20.
Unit Availability Factor 88.2 46.3 67.6 21.
Unit Capacity Factor (Using MDC Net) 87.2 44.3**
62.8
- 22. Unit Capacity Factor (Using DER Net) 85.9 42.6 61.8
- 23. Unit Forced Outage Rate 11.8 6.2 16.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
- Item 21 year-to-date is weighted average as a result of the. capacity rating change.