Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review:Data & Info Capabilities, for Quad Cities Station,Units 1 & 2, Technical Evaluation Rept
ML20136G340
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/10/1985
From:
SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
NRC
Shared Package
ML20136G332 List:
References
CON-NRC-03-82-096, CON-NRC-3-82-96 GL-83-28, SAIC-85-1529, SAIC-85-1529-01, SAIC-85-1529-1, NUDOCS 8508190372
Download: ML20136G340 (19)


Text

'

SAIC-85/1529 4

REVIEW 0F LICENSEE AND APPLICANT RESPONSES TO NRC GENERIC LETTER 83 28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2

" POST-TRIP REVIEW:

DATA AND INFORMATION CAPABILITIES" FOR QUAD CITIES STATION, UNITS 1 AND 2 (50-254, 50-265)

July 10, 1985 Technical Evaluation Report Prepared by Science Applications International Corporation 1710 Goodridge Drive McLean, Virginia 22102 Prepared for U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Contract No. NRC-03-82-096 8500190372 050009 PDH ADOCK 05000254 P

PDR

FOREWORD s

This report contains the technical evaluation of the Quad Cities Station, Units 1 and 2, response to Generic Letter 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2 " post Trip Review:

Data and Information Capabilities."

For the purposes of this evaluation, the review criteria, presented in part 2 of this report, were divided into five separate categories. These are:

1.

The parameters monitored by the sequence of events and the time history recorders, 2.

The performance characteristics of the sequence of events recorders, 3.

The performance characteristics of the time history recorders, 4.

The data output format, and 5.

The long-term data retention capability for post-trip review material.

All available responses to Generic Letter 83-28 were evaluated. The plants for which this report is applicable were found to have adequately responded to, and met, categories 1 and 4.

The report describes the specific methods used to determine the cate-gorization of the responses to Generic Letter 83-28.

Since this evaluation report was intended to apply to more than one nuclear power plant)ia are not specifics regarding how each plant met (or failed to meet) the review criter presented.

Instead, the evaluation presents a categorization of the responses according to which categories of review criteria are satisfied and which are not.

The evaluations are based on specific criteria (Section 2) derived from the requirements as stated in the generic letter.

i i

l j

l i

l TA8LE OF CONTENTS

(

s i

Section Page l

Introduction.........................

I i

1.

Background..........................

2 i

2.

Review Criteria.......................

3 1

3.

Evaluation..........................

8 r

l

- 4.. Co ncl u s i o n..........................

8 5.

References..........................

10 Ih l

&*$ p ggV$ % 447h4 WLelLE**.

I t

1 4

t-i l

l

}

I i

I 4

e I

l 4

l i

.i l

i I

L i

I 1

.~,______.__.r_----.

t INTRODUCTION SAIC has reviewed the utility's response to Generic Letter 83-28, item

~

1.2 " Post-Trip Review:

Data and Information Capability." The response (see references) contained sufficient information to determine that the data and information capabilities at these plants are acceptable in the following areas.

e The parameters monitcred by both the sequence-of-events and time history recorders.

e The output format of the recorded data.

However, the data and information capabilities, as described in the sub.nittal, either fell to meet the review criteria or provide insufficient information to allow determination of the adequacy of the data and information capabilities in the following areas.

e The sequence-of-events recorder (s) performance charac-teristics.

o The time history recorder (s) performance characterts-tics.

The long-term data retention, record keeping, capa-e bility.

1

===1.

Background===

On February 25, 1984, both of the scram circuit breakers at, Unit 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the reactor protection system.

This incident occurred during the plant startup and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal.

The failure of the circuit breakers has been determined to be related to the sticking of the under voltage trip attachment.

Prior to this incident; on February 22, 1983; at Unit 1 of the Salem Nuclear Power Plant an automatic trip signal was generated based on steam generator low-low level during plant startup.

In this case the reactor was tripped manually by the operator almost coinci-dentally with the automatic trip. At that time, because the utility did not have a requirement for the systematic evaluation of the reactor trip, no investigation was performed to determine whether the reactor was tripped automatically as expected or manually.

The utilities' written procedures required only that the cause of the trip be determined and identified the responsible personnel that could authorize a restart if the cause of the trip is known.

Following the second trip which clearly indicated the problem with the trip breakers, the question was raised on whether the circuit breakers had functioned properly during the earlier incident.

The most useful source of information in this case, namely the sequence of events printout which would have indicated whether the reactor was tripped automatically or manually during the February 22 incident, was not retained after the incident. Thus, no judgment on the proper functioning of the trip system during the earlier incident could be made.

Following these incidents; on February 28, 1983; the NRC Executive Director for Operations (EDO), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant. The results of the staff's inquiry into the generic implications of the Salem Unit incidents is reported in NUREG-1000 " Generic Implications of ATWS Events at the Salem Nuclear Power Plant." Based on the results of this study, a set of required actions were developed and included in Generic Letter 83-28 which was issued on July 8,1983 and sent to all licensees of operating reactors, applicants for operating license, and construction permit holders. The required actions in this generic letter consist of four categories.

These are:

(1) Post-Trip Review (2) Equipment 2

Classification and Vender Interface, (3) Post Maintenance Testing, and (4)

Reactor Trip System Reliability Improvements.

The first required action of the generic letter, Post-Trip Rhview, is the subject of this TER and consists of action item 1.1 " Program Description and Procedure" and action item 1.2 " Data and Information Capability." In the next section the review criteria used to assess the adequacy of the utilities' responses to the requirements of action item 1.2 will be discussed.

2.

Review Criteria The intent of the Post Trip Review requirements of Generic Letter 83-28 is to ensure that the licensee has adequate procedures and data and information sources to understand the cause(s) and progression of a reactor trip. This understanding should go beyond a simple identification of the course of the event.

It should include the capability to determine the root cause of the reactor trip and to determine whether safety limits have been exceeded and if so to what extent. Sufficient information about the reactor trip event should be available so that a decision on the acceptability of a reactor restart can be made.

The following are the review criteria developed for the requirements of Generic Letter 83-28, action item 1.2:

The equipment that provides the digital sequence of events (SOE) record and the analog time history records of an unscheduled shutdown should pro-vide a reliable source of the necessary information to be used in the post trip review.

Each plant variable which is necessary to determine the cause(s) and progression of the event (s) following a plant trip should be monitored by at least one recorder [such as a sequence-of-events recorder or a plant process computer for di,gital parameters; and strip charts, a plant process computer or analog recorder for analog (time history) variables].

Each device used to record an analog or digital plant variable should be described in sufficient detail so that a determination can be made as to whether the following performance characteristics are met:

3

e Each sequence-of-events recorder should be capable of detecting and recording the sequence of events with a sufficient time discrimination capability to ensure that the time responses asso-ciated with each monitored safety-related system cante ascer-tained, and that a determination can be made as to whether the time response is within acceptable limits based on FSAR Chapter 15 Accident Analyses. The recommended guideline for the SOE time discriminaticn is approximately 100 msec.

If current SOE recorders do not have this time discrimination capability the licensee or applicant should s+ow that the current time discrimi-nation capability is sufficient for an adequate reconstruction of the course of the reactor trip. As a minimum this should include,

the ability to adequately reconstruct the accident scenarios pre-sented in Chapter 15 of the plant FSAR.

e Each analog time history data recorder should have a sample inter-val small enough so that the incident can be accurately l

reconstructed following a reactor trip.

As a minimum, the l

licensee or applicant should be able to reconstruct the course of l

the accident sequences evaluated in the accident analysis of the plant FSAR (Chapter 15). The recommended guideline for the sample interval is 10 sec.

If the time history equipment does not meet this guideline, the licensee or applicant should show that the current time history capability is sufficient to accurately recon-struct the accident sequences presented in Chapter 15 of the FSAR.

l l

e To support the post trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of updating and retaining information from approximately five minutes prior to the trip until at least ten minutes after the trip.

t e

The information gathered by the sequence-of-events and time history data collectors should be stored in a manner that will allow for retrieval and analysis.

The data may be retained in either hardcopy (computer printout, strip chart output, etc.) or in an accessible memory (magnetic disc or tape). This information should be presented in a readable and meaningful format, taking 4

A irto consideration good human factors practices (such as those I

ot tlined in NUREG-0700).

e All equipment used to record sequence of events and tide history information should be powered from a reliable and non-interruptible power source. The power source used need not be safety related.

The sequence of tvents and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the reactor trip can be reconstructed. The parameters soni.tored should provide sufficient information to determine the root cause of the reactor trip, the progression of the reactor trip, and the response of the plant parameters and systems to the reactor trip.

Specifically, all input parameters associated with reactor trips, safety injections and other safety-related systems as well as output parameters sufficient to record the proper functioning of these systems should be recorded for use in the post trip review.

The parameters deemed necessary, as a minimum, to perform a post-trip review (one that would determine if the plant remained within its design envelope) are presented on Tables 1.2-1 and 1.2-2.

If the appli-cants' or licensees' SOE recorders and time history recorders do not monitor all of the parameters suggested in these tables the applicant or licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remained within the design envelope for the apprc-priate accident conditions; such as those analyzed in Chapter 15 of the plant Safety Analysis Report.

Information gathered during the post trip review is required input for future post trip reviews.

Data from all unscheduled shutdowns provides a valuable reference source for the determination of the acceptability of the plant vital parameter and equipment response to future unscheduled shut-downs.

It is therefore necessary that information gathered during all post trip reviews be maintained in an accessible manner for the life of the plant.

5

i Table 1.2-1.

PWR Parameter List SOE Time History Recorder Recorder Parameter / Signal x

Reactor Trip (1) x Safety Injection x

Containment Isolation (1) x Turbine Trip x

Control Rod Position (1) x x

Neutron Flux, Power x

x Containment Pressure (2)

Containment Radiation x

Containment Sump Level (1) x x

Primary System Pressure (1) x x

Primary System Temperature (1) x Pressurizer Level (1) x Reactor Coolant Pump Status (1) x x

Primary System Flow (3)

Safety Inj.; Flow, Pump / Valve Status x

MSIV Position x

x Steam Generator Pressure (1) x x

Steam Generator Level (1) x x

Feedwater Flow (1) x x

Steam Flow (3)

Auxiliary Feedwater System; Flow, Pump /Value Status AC and DC System Status (Bus Voltage) x x

Diesel Generator Status (Start /Stop, On/Off) x PORV Position (1): Trip parameters (2): Parameter may be monitored by either an SOE or time history r,ecorder.

(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.

6 1

Table 1.2-2.

BWR Parameter List 50E Time History Recorder Recorder Parameter / Signal s

x Reactor Trip x

Safety Injection x

Containment Isolation x

Turbine Trip x

Cont'rol Rod Position x (1),

x Neutron Flux, Power x (1)

Main Steam Radiation

, (2)

Containment (Dry Well) Radiation x (1) x Drywell Pressure (Containment Pressure)

(2)

Suppression _ Pool Temperature

~

x (1) x Primary System Pressure x (1) x Primary System level x

MSIV Position x (1)

Turbine Stop Valve / Control Valve Position x

Turbine Bypass Valve Position x

Feedwater Flow x

Steam Flow (3)

Recirculation; Flow Pump Status x (1)

Scram Discharge Level x (1)

Condenser Vacuum x

AC and DC System Status (Bus Voltage)

(3)(4)

Safety Injection; Flow Pump / Valve Status *

~

x Diesel Generator Status (On/Off, Start /Stop)

(1): Trip parameters.

l (2): Parameter may be recorded by either an SOE or time history recorder.

(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or

~

(c) equipment status recorded on an SOE recorder.

(4): Includes recording of parameters for all applicable systems from the following: HPCI, LPCI, LPCS, IC, RCIC.

7

3.

Evaluation The list of parameters presented in the submittal that are recorded by sequence of events (SOE) and analog (time history) recorders appear to be adequate to meet the criteria presented in part 2 of this report. These parameters should be sufficient to determine the cause of the reactor trip and the proper functioning of important plant systems.

The review criteria require that the equipment being used to record the sequence of events and time history data needed for a post-trip review meet certain performance characteristics.

These characteristics are intended to ensure that, if the proper parameters are recorded, the recording equipment,

will provide an adequate source of information for in effective post-trip review.

The information provided in this submittal does not indicate that either the time history or SOE equipment used would meet the intent of the performance criteria outlined in part 2 of this report.

The data and information recorded for use in the post-trip review should be output in a format that allows for ease of identification and use of the data to meet the review criterion that calls for information in a readable and meaningful format. The information contained in this submittal indicates that this criterion is met.

The data and information used during a post-trip review should be retained as part of the plant files. This information could prove useful during future post-trip reviews.

Therefore, one criterion is that infor-mation used during a post-trip review be maintained in an accessible manner for.the life of the plant.

1he information contained within this submittal does not indicate that this criterion will be met.

4.

Conclusion The information supplied in response to Generic Letter 83-28 indicates that the current post-trip review data and information capabilities are adequate in the following area:

1.

Sufficient analog and digital parameters are recorded for use in the post-trip review.

8

2.

The recorded data is output in a readable and meaningful format.

1 The information supplied in response to Generic 1.etter 83-28 does not indicate that the post-trip review data and information capabiIities are adequate in the following areas.

1.

Time history recorders, as described in the submittal, do not meet the minimum performance characteristics.

2.

The sequence of events recorders, as described in the submittal, do not meet the minimum performance requirements.

3.

The data retention procedures, as described in the submittal, do not indicate that the information recorded for the post-trip review is maintained in an accessible manner for the life of the pl a nt.

It is possible that the current data and information capabilities at this nuclear power plant are adequate to meet the intent of these review criteria, but were not completely described. Under these circumstances, the licensee should provide an updated, more complete, description to show in more detail the data and information capabilities at this nuclear power pl a nt.

If the information provided accurately represents all current data and information capabilties, then the licensee should either show that the current data and information capabilities are sufficient to meet the intent of the review criteria in part 2 of this report, or detail future modifica-tions that would enable the licensee to meet the intent of the evaluation

criteria, l

9

REFERENCES MRC Generic Letter 83-28.

" Letter to all licensees of o'perating reactors, applicants for operating license, and holders of construction permits regarding Required Actions Based on Generic Implications of Salem ATWS Events." July 8, 1983.

NUREG-1000 Generic Implications of ATWS Events at the Salem Nuclear Power Plant, April 1983.

Letter from P.L. Barnes, Commonwealth Edison, to H.R. Denton, NRC, dated November 5,1983, Accession Number 8311090213 in response to Generic Letter 83-28 of July 8,1983, with attachment.

Part 2. Quad Cities Station Units I and 2 Response to Generic Letter 83-28.

Letter from P.L. Barnes, Commonwealth Edison, to H.R. Denton, NRC, dated June 1, 1984 Accession Number 8406050418 transmitting supple-mental response to Generic Letter No. 83-28 of July 8,1983, with attachment.

(See Braidwood file for copy.)

Letter from G.L. Alexander, Commonwealth Edison, to H.R. Denton, NRC, dated June 30, 1984, Accession Number 8407060235 in response to Generic Letter 83-28 of July 8,1983.

Attachment not received.

e 10

6u re oe.72Wr Occ.uAckT BC EM*M s

Quad Cities t

1.

Parameters recorded: Satisfactory All required BWR parameters are monitored.

2.

SOE recorders performance characteristics: Unsatisfactory Plant computer:

no time discrimination capability is provided for either present computer (GE-PAC-4020) or future replacement (2 Honeywell 4500s); power supply is not non-interruptible.

3.

Time history recorders performance characteristics:

Unsatisfactory Plant computer:

sampling interval of 1 minute for the 5 minutes prior to the trip, I sec for the first minute af ter the trip and 15 sec for the period from 1-30 minutes after the trip.

Chart recorders provide some additional inforration.

4.

Data output format:

Satisfactory SOE format - hardcopy output contains time of event, sensor ID, event descriptor.

Analog format - hardcopy output contains time, input point, and parame-ter value.

5.

Data retention capability: Unsatisfactory Length of time SOE data is retained is not specified.

Chart recorder data is kept for 5 years.

Il

II.

REVIEW GUIDELINES The fo11owing re' view guidel.ines were developed after initial evaluation of the various utility responses to Item 1.2 of Generic Letter 83-28 and incorporate the best features of these submittals. As such, these review guidelines in effect represent a " good practices" approach to post-trip

~

review. We have reviewed'the licensee's response to Item 1.2 against these

'"v i

^e

+

guide 11nes:

. a c. :....

  • s. : res-r.,

. :n v i< m t.nt, v ce:?. vw ve The equipment'that'p'rev' ides 'the igital s'equ'en'c'e of events (SOE) record d

A.

and the analog time history ncords of an unscheduled shutdown should

~

prov'ide a%11a'ble "s'ource' of the' tiecessa'ryinfonnatio'n' to be' used in the post-trip'teti'ewF Each plant vaWab1'shiLWis ne~c'eis'a'ry"to" determine T

~

e the~ caute'wTprogsssionof the eve'nts following' a' pYa'nt' t' rip' should be monitored by at leas 5 one recorder (such as a sequence-of-events -

recorder or a plant process computer) for digital paraineters; and strip I

et 7

/

  1. 0 1

h r

e e'

i s charts, a plant process computer or analog recorder for analog (time history) variables. Performance characteristics guidelines for SOE and time history recorders are as follows:

)

I Each sequence of events recorder should be capable of detecting and recording the sequence of events with a sufficient time discrimination capability to ensure that the time responses associated with each monitored safety-related system can be ascertained, and that a detennination can be made as to whether the time response is within acceptable limits based on FSAR Chapter 15 Accident Analyses. The reconnended guidelincs for the SOE time discrimination is approximately 100 milliseconds. If current SdE recorders do not have this, time discrimination capability the licensee should show that the current time discrimination. capability is sufficient for an adequate reconstruction of the course of the reactor trip and post-trip events. As a minimum this should include the ability to adequately reconstruct the transient and accident scenarios presented in Chapter 15 of the plant FSAR.

Each analog time history data recorder should have a sample

>> interval small enough so that the incident can be accurately reconstructed following a reactor trip. As a minimum,-the licensee should be able to reconstruct the course of the transient and accident sequences evaluated in the accident analysis of e,

. Chapter 15 of the plant FSAR. The recommended guideline fur the sample interval is 10 seconds.

If the time history equipment does not meet this guideline, the licensee should show that-the time history capability is sufficient to accurately reconstruct the transient and accident sequences presented in Chapter 15 of the FSAR. To support the post-trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of updating and retaining information from approximately five minutes prior to the trip until at least ten minutes after the trip.

All equipment used to record sequence of events and time history information should be powered from a reliable and non-interruptible power source. The power source used need not be safety related.

B.

The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the reactor trip and post-trip events can be a

reconstructed. The parameters monitored should provide sufficient information to determine the root cause of the unscheduled shutdown, the i

progression of the reactor trip, and the response of the plant param2ters and protection and safety systems to the unscheduled shutdowns. Specifically, all input parameters associated with reactor trips, safety injections and other safety-related systems as well as.

output parameters sufficient to record the proper functioning of these

(

g

. systems should be recorded for use in the post-trip review. The parameters deemed necessary, as a minimum, to perform a post-trip review that would determine if the plant remained within its safety limit design envelope are presented in Table 1.

They were selected on the basis of staff engineering judgment following a complete evaluation of utility submittals.

If the licensee's SOE recorders and time history

- recorders do not monitor all of the parameters suggested in these tables

'" the licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remained within the design envelope for the accident conditions analyzed in Chapter 15 of the plant FSAR.

C.

The infomation gathered by the sequence of. events and time history recorders should be stored in a manner that will allow for data retrieval and analysis. The data may be retained in either hardcopy, (e.g.,, computer printout, strip chart recor' ), or in an accessible d

memory (e.g.,magneticdiscortape). This infomation should be presented in a readable and meaningful fonnat, taking into consideration good human factors practices such as those outlined in NUREG-0700.

D.

Retention of data from all unscheduled shutdowns provides a valuable refebnce source for the determination of the acceptability of the plant vital parameter and equipment response to subsequent unsche5uled shutdowns.

Information gathered during the post-trip review is to be

. - - -. _ - _,., _, ~

E

_ retained for the life of the plant for post-trip review comparisons of

- ~

'~ subsequent events.