Adds Guidance on Nuclear Power Plant Working Hours
ML20032C791
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/02/1981
From: Gilinsky V
NRC COMMISSION (OCM)
To: Ahearne J, Bradford P, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML19250J480 List:
References
TAC-55328, NUDOCS 8111110725
Download: ML20032C791 (15)


Text

,

k(\\

[%

UNITED STATES

. g,g 'g NUCLEAR REGULATORY COMMISSION usmNGTON, O C. 20555
g-1 c

jg

/

a~.

c

%;..... /

?.ECUES.T ?.E?t.Y TO SECY BY

/

OFFICE OF THE CovMISSION E R October 2, 1981 COMVG-818 MEMORANDUM FOR CHAIRMAN PALLADINO COMMISSIONER BRADFORD COMMISSIONER AHEARNE COMMISSIONER ROBERTS

SUBJECT:

SECY-81-44 0 NUCLEAR POWER PLANT WORKING HOURS I would add to the guidance on nuclear power plant working hours.

It is good and reasonable guidance so far as it goes, especially when applied to plant personnel other than operators.

(In fact, it is not inconsistent with many of the agreements between union and management which govern working conditions at operating nuclear power plants.)

But to assure the availability of well-rested and alert operators an additional requirement should be added that specifies the minimum number of operating shifts for each mode of the plant.

The need fo a well-rested and alert operating crew is critical to safely operating a nuclear power plant.

Many incidents that could cause core damage or release radioactive material to the environment require intervention by the operator to protect the he'alth and safety of the public.

In addition, routine work performed by personnel other than operators must be reviewed and approved by a licensed operator prior to performing the work.

This assures the work will not interfere with generating power, violate the operating license or injure personnel.

In a licensing sense, the operator should be treated at least as stringently as plant equipment used to mitigate accidents.

Operating licenses recognize the need for operable safety equipment for various nuclear plant conditions.

For example, when a plant is at full power all the emergency diesels must be ready to energize the emergency buses if needed.

If.even one is not, then the plant must be shut down.

Similarly, at full power there must be a sufficient number of operators fit to run the' plant safely.

The current operating licenses recognize this to an extent that each shift must have a minimum number of licensed and non-licensed operators for each mode of the plant.

Extending the 8111110725 811109 PDR SECY 81-440 PDR

' xisting specification one more step.by requiring 5 minimum number of available shifts for each operating mode would e

This assure an adequate total number of fit operators.

would avoid the recent experience with Salem and Diablo Canyon where the Commission was required to pass judgment on the adequacy of shift manning in the absence of a reasonable specification.

I I believe the attached draft memo to the Executive Director should direct the staff to develop a technical specification requiring a minimum number of shifts for different plant modes as an addition to the current requirements for minimum shift complements.

/

l

[+

Victor Gilinsky

Attachment:

a/s

)

SECY please track responses.