MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled ML20126J3941992-12-30030 December 1992 Notification of Significant Licensee Meeting W/Util on 930114 to Discuss Licensee QA Program Initiatives 1999-09-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20195J8301999-06-18018 June 1999 Staff Requirements Memo Re 990618 Affirmation Session for SECY-99-133, Final Rev to 10CFR50.65 to Require Licensees to Perform Assessments Before Performing Maint & SECY-99-145 Re Antitrust Issues for Wolf Creek Unit 1 ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives 1999-09-08
[Table view] |
Text
p -
._ g"% UNITED STATE 2 n /4 NUCLEAR REGULA1 JRY COMMISSION
$- "() h . HEGION IV S
' 611 RYAN PLAZA DRIVE. SUITE 1000 o ARLINGTON, TEXAS 76011 September 24, 1984 MEMORANDUM FOR: Richard C. DeYoung, Director Office of Inspection and Enforcement FROM: Richard P. Denise, Director Wolf Creek Task Force, RIV
SUBJECT:
WOLF CREEK ALLEGATION PROGRAM ASSESSMENT In accordance with agreements reached at the meeting on September 11, 1984, among representatives from Region II, Region III, Region IV, and the Office of Inspection and Enforcement, and in subsequent telephone conversations between J. H. Taylor and R. P. Denise, I request that I&E assist Region IV in an assessment of the allegations efforts related to the Wolf Creek Generating Station The assessment should include the following phases:
- 1. An assessment of the structure of the utility program on allegations received by them, chiefly in their Quality First Program. Attributes assessed should include program placement in the utility organization, organizational independence, delineation of responsibilities within the Quality First Organization, precision and adequacy of decision-making process within Quality First, number and qualification of personnel, formality of effort as reflected in offical instructions, information flow instructions (including alleger notification),
record keeping, ~ management notification, trending, assessment of trends, etc.
- 2. An assessment of the implementation of the utility program on allegations received by them, chiefly in the Quality First Program.
- This assessment should be focused on a determination of whether the utility program is being effectively implemented, and implemented as planned. The NRC assigned personnel should review a significant selected sample of allegations received by the utility for verifi-cation of program implementation. Attributes to be assessed include progress of effort toward resolution (is the backlog maintained at a reasonably low level), priority treatment, timeliness of effort, clarity of corrective actions and other decisions, adequacy of documentation and record retention, adequacy of technical support and rationale for disposition, etc.
- 3. An assessment of the NRC/RIV effort on allegation management and closeout related to the Wolf Creek plant.
In the conduct of this assessment, all personnel need to be careful not to disclose the identity of those persons making allegations to the utility or to the NRC.
ft
(*
h2852107 VARRICHBS~j og pyg .
nm,w > u o f etw
es I have assigned Mr. Glen Madsen of Regi.on IV to participate in this effort. Based on discussions with Mr. J. Taylor and Mr. W. Haass, I under-stand that W. Haass, E. Fox, and one other person have been designated as I&E participants. I expect Mr. Haass to execute the lead role. The effort is presently scheduled to start on September 25, 1984, when the team arrives at the Wolf Creek plant site. . A completed effort, including final report to be issued by the RIV Task Force Director, should be scheduled for no later than October 19, 1984.
We appreciate the I&E assistance on this matter. If there are any questions or required clarifications, please have your staff contact me.
M
, Richard P. Denise, Director Wolf Creek Task Force, RIV cc:
J. M. Taylor, I&E J. T. Collins, RIV J. G. Keppler, RIII J. P. O'Reilly, RII R. D. Martin, RII V. Brownlee, RII R. C. Lewis, RII
~
R. L. Spessard, RIII L. E. Martin, RIV T. F. Westerman, RIV G. Madsen, RIV W. Haass, I&E E. F. Fox, Jr. , I&E W. G. Guldemond, RIV-W.C.
P. O' Connor, NRR K. Kniel, NRR
'##' Sh UNITED STATES g,,,,, g.
?s e NUCLEAR REGULATORY COMMISSION '
'kd t ['. ! 611 RYAN PLAZA DRIVE. SUITE 1000 4...../
3 ARLINGTON. TEXAS 76011 July 27, 1984 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Kansas Gas & Electric Company Name of Facility: Wolf Creek Generating Station Docket: STN 50-482 Date and Time August 7, 1984 - 1:00 p.m.
of Meeting:
Location of Meeting: Region IV Purpose of Meeting: Enforcement Conference NRC Attendees: J. T. Collins, Regional Administrator P. S. Check, Deputy Regional Administrator W. Brown, Regional Attorney R. P. Denise, Director, WC Task Force T. F. Westerman, Enforcement Officer E. H. Johnson, Chief, Reactor Project Branch 1 Licensee Attendees: G. L. Koester, Vice President, Nuclear and other KG&E representatives Note: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by noon on August 6,1984, via telephone call to Larry Martin, FTS 728-8155.
Distribution:
W. J. Dircks, EDO V. Stello, DED/ROGR J. Lieberman, ELD R. C. DeYoung, IE J. T. Collins, RIV R. P. Denise, RIV C. Wisner, RIV Attendees '
NRC PDR Service List m , , ,,,
u < , . : , , ,, ,4 ,w c v i /4 7 '3 ' /o.'
l j(
kL yw, m
.. ~. c - -
. u;a w a .-------- .-- -- - ---- , --
ses- + < (?2.
KANSAS GAS AND ELECTRIC COMPANY WOLF CREEK NUCLEAR GENERATING STATION ENFORCEMENT CONFERENCE AGENDA Date: August 7, 1984 CPPR No: CPPR-147 Docket: STN 50-482 Place: NRC, Region IV Time: 1:00 p.m.
' Opening Remarks: John T. Collins, Regional Administrator, NRC, Region IV Review of Apparent Violation: Richard P. Denise, Director, Division of Reactor Safety and Projects, Region IV
' Licensee Response to Apparent Violation: G. L. Koester, et al . (KG&E)
Review of Enforcement Action: Thomas F. Westerman, Enforcement Officer Closing Remarks: John 1. Collins, Regional Administrator, NRC, Region IV 9
)
cc:
. John T. Collins, Regional-Administrator Paul S. Check, Deputy Regional Administrator Richard P. Denise, Director, Division of Reactor Safety & Projects Lawrence E. Martin, Chief, Project Section A, Reactor Project Branch 2 William E. Brown, Regional Counsel Jane Axelrad, Director, Enforcement Don Grimsley, Enforcement Specialist (Temp. Assignment)-
T. F. Westerman, Enforcement Officer l
l n,-
77 1""E Ud
g , j g q.
ATTENDANCE KG&E ENf0RCEMENT CONFERENCE AUGUST 7, 1984 NAME POSITION COMPANY 0
. # ,a oe.greie,Gh.<wA. W2WF-J9A4Asin '
g'cSw 97, ,j . i ,, r .
- !n / i..- ./
fp'f& c u n J kIfs/ p #s2c - 4/i n //
D4 6frip,cd<y '
ll. lb,,'<.e <;- lllN:an $I$
()?c. . #' f 8*
f s, , (
L n a..~n a ~ :, a c. . o w.e on.L 1. Laa .a
,p[$gf.g4 f4 NKl $4b'14sth'bW '4'6lb$
p ,,.9 m
% ~ f M+ - t ..t,, a o.r. a a c a w c .G . .- { ,J B < / R D1 b a< ey /As , h 'a Yl#
w\.
D1 vv.
September 24, 1984 EN 84-58 0FFICE 0_F INSPECTION AND ENFORCEMEN_T NOTIFICATION OF SIGNIFICANT ENFOR_ CEMENT ACTION
, Licensee: Kansas Gas' and Electric Company Wolf Creek Generating Station Docket No. STN 50-482
Subject:
PROPOSED IMPOSITION OF CIVIL PENALTY - $64,000 This is to inform the Comission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Sixty-Four Thousand Dollars
($64,000) will be issued on or about September 27, 1984 to Kansas Gas and Electric Company. This action is based on discrimination by the licensee against an employee for engaging in a protected activity as a Quality Assurance inspector. The discrimination was evidenced by a complaint filed by a Quality Assurance Inspector and affirmed by the Secretary of Labor, that he had been placed on probation, teminated, and refused reemployment for reporting quality assurance discrepancies and safety problems to the licensee's Quality Assurance Manager. The discrimination involved a managernent level ahnve the first line of supervision.
It should be noted that the licensee has not been specifically infomed of the enforcement action. The Regional Administrator has been authorized by the Director of the Office of Inspection and Enforcement to sign this action. The schedule of issuance and notification is:
Mailing of Notice September 27, 1984 Telephone Notification of Licensee September 27. 1984 A news release has been prepared and will be issued about the time the licensee receives the Notice. The State of Kansas will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Contact:
E. Holler, IE 27624 J. Axelrad, IE 24909 Distribution:
H Street MNBB Phillips EW Willsto Chairman PaTTa~dino EDO NRR IE NMSS Com. Roberts DED/ROGR OIA RES Comm. Asselstine PA O!
Comm. Bernthal ELD AE00 Comm. Zech RM ACRS SECY Air Rights Regional Offices MAIL -
CA SP RI RIV ADM: Doc. Mgt. Br.
PE RII RV _ _ _ PDR 1_
RIII ,-
(f PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL SEPTEMBER 27, 1984
,,4 ,/ e,3 M g , y , ' s v- sv vi' ,
f}}