Revised Monthly Operating Rept for Jul 1985
ML20136B889
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/31/1985
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20136B874 List:
References
(0625M), (625M), NUDOCS 8511200310
Download: ML20136B889 (1)


Text

_ _ _ _

cPla:c's ins':rt this table in the July 1985 r port R; port Period July 1985 UNIT SHUTDOWNS / REDUCTIONS BYRON No.

Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence

20) 7/1/85 S

171.8 A 4

Continued scheduled outage from 6/27/85.

21) 7/8/85 F

17.7 A

2 A manual. turbine trip was initiated at 8*4 Reactor Power due to misalignment of control rod P-8.

A reactor trip resulted.

22) 7/12/85 F

13.4 B

3 The reactor tripped during performance of the 50% load rejection test.

23) 7/13/85 P

239.7 A 3

The reactor tripped due to high negative flux rate which was caused by lightning.

24) 7/27/85 S

100.0 B 2

100% Reactor Trip Startup Test.

ococ*e*********

Byron 1 is continuing in its 100% Power Test Sequence.

Summary cocooce********

TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sch d B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161; 8511200310 351109 (0625M)

PDR ADOCK O 4