cPla:c's ins':rt this table in the July 1985 r port R; port Period July 1985 UNIT SHUTDOWNS / REDUCTIONS

  • BYRON
  • No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence
20) 7/1/85 S 171.8 A 4 Continued scheduled outage from 6/27/85.
21) 7/8/85 F 17.7 A 2 A manual . turbine trip was initiated at 8*4 Reactor Power due to misalignment of control rod P-8. A reactor trip resulted.
22) 7/12/85 F 13.4 B 3 The reactor tripped during performance of the 50% load rejection test.
23) 7/13/85 P 239.7 A 3 The reactor tripped due to high negative flux rate which was caused by lightning.
24) 7/27/85 S 100.0 B 2 100% Reactor Trip Startup Test.

ococ*e*********

  • Summary
  • Byron 1 is continuing in its 100% Power Test Sequence.

cocooce********

TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sch d B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report