Discusses Ti 126 Reviews & Requests That Particular Strengths & Weaknesses of Subj Reviews Be Identified for Discussion at Upcoming Meeting
ML20136A886
Person / Time
Issue date: 02/03/1995
From: Frahm R
NRC (Affiliation Not Assigned)
To: Allsopp D, Luehman J, George Thomas
NRC (Affiliation Not Assigned)
Shared Package
ML20136A631 List:
References
FOIA-97-045, FOIA-97-45 NUDOCS 9703100070
Download: ML20136A886 (2)


Text

_

George Thomas, NRR To-James Luehman, NRR David Allsopp, NRR l

l Samuel Lee, NRR From: Ronald K. Frahm Jr.

(RKF) NRR To:

GXT, JGL, DKA, SSL Date: Friday, February 3, 1995 10:48 am

Subject:

TI 126 REVIEWS If possible, try to identify particular strengths and weaknesses for each of the 8 submittals to discuss at today's meeting. At the meeting I'd like to complete a data sheet (from this day forward known as form A) and address / rate the specific question list (form B) for each of the 8 submittals.

Additional euggestions are certainly welcome.

Thanks. - Ron I

i P.S.

It looks like we'll have the majority of the remaining sub.nittals by early next week.

The review team will consist of the following members:

Jim Luehman, OTSB JGL 415-3150 11-C-13 George Thomas, SRXB GXT 415-1814 8-E-20 i

Sam Lee, SPSB SSL 415-1061 10-8-9 Dave Allsopp, PIPB DKA 415-3073 12-D-13 Ron Frahm, Jr, TQMB RKF 415-2986 9-C-7 l

George and I should have "415" exchanges starting next week.

CC:

RPC, SCB l

/

l j

9703100070 970305

/t/

PDR FOIA

, /7 CURRAN 97-045 PDR

l

\\

The final report from the Comittee to Russell (Director, NRR) will summarize the results of each of these questions as well as our overall concidsions and recommendations.

PROPOSED SCHEDULE 2/2/95 i

Kickoff meeting 2/7/95 Region III reviews discussed 2/9/95 Region II reviews discussed 2/13/95 Region IV reviews discussed Region I reviews discussed 2/15/95 Draft report completed by Committee 2/16/95 i

Final report issued 2/21/95 Report to NEI

- 2/22/95 CRITICAL PATH DATE

  • Breathe a huge sigh of relief

- 2/23/95

  • this date came down from Russell !!

I will distribute the submittals to the Committee members as they become available, but at a minimum 2 days prior to when we plan to discuss them.

To meet this schedule, a full-time commitment will be necessary from each member of the Review Committee for the next two and a half (21/2) weeks. Overtime may be necessary.

If this poses a problem please notify me immediately.