ML20135H477
| ML20135H477 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/16/1985 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20135H478 | List: |
| References | |
| NUDOCS 8509230612 | |
| Download: ML20135H477 (20) | |
Text
a e
e ATTACHMENT TO LICENSE AMENDMENT NO. 88 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Revise the Technical Specifications by deleting the following pages and inserting the enclosed pages.
Remove Insert 111 iii 126 126 196 196 197 197 208 208 208a 208a 209 209 210 210 212 212 213 213 214 214 215 215 216 216 217 217 218 218 220 220 221 221 222 222 224 224 G
e W
e 0
8509230612 850916 PDR ADOCK 05000293-P pg
Page No.
5.0 MA;04 DESIGN FEATURES 206n 5.1 Site Features 206m 5.2 Reactor 206m 5.3 Reactor Vessel 206n 5.4 Centainment 206m 5.5 fuel Storage 207 5.6 Seismic Cesign 207 6.0 ADMINISTRATIVE CONTROLS 208 6.1 Responsibility 208 6.2 Organization 208 6.3 Facility Staff Qualifications 208a l
6.4 Training 208a 6.5 Review and Audit 212 6.6 Reportable Event Action 216 6.7 Safety Limit Violation 217 6.8 Procedures 217 6.9 Reporting Requirements 218 6.10 Record Retention 224 6.11 Radiation Protection Program 226 6.12 (Deleted) 6.13 High Radiation Area 226 6.14 Fire Protection Program 227 6.15 Environmental Qualification 228 4
d
- Amendment No. 88 til l'
l
LIMITING CONDITION FOR OPERATION SURVEILj.ANCE REQUIREMENTS 3.6.C Coolant Chemistry (Cont'd) 4.6 power operation is permissible only during the succeeding seven days.
- 3. If the conditions in 1 cr 2 above cannot be met, an orderly shutdown shall be initiated and the reactor shall be in a Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
D. Safety and Relief Valves D.
Safety and Relief Valves
- 1. During reactor power operating 1.
At least one safety valve and two conditions and prior to reactor relief / safety valves shall be startup from a Cold Condition, checked or replaced with bench or whenever r? actor coolant checked valves once per operating pressure is greater than 104 cycle. All valves will be tested psig and temperature greater every two cycles.
than 340*F, both safety valves and the safety modes of all The set point of the safety valves relief valves shall be operable, shall be as specified in Specification 2.2.
- 2. If Specification 3.D.1 is not met, an orderly shutdown shall 2.
At least one of the relief / safety be initiated and the reactor valves shall be disassembled and coolant pressure shall be below inspected each refueling outage.
104 psig within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Note:
Technical Specifications 3.6.0.2 3.
Whenever the safety relief valves
- 3.6.0.5 apply only when two are required to be operable, the, Stage Target Rock SRVs are discharge pipe temperature of each installed.
safety relief valve shall be logged daily.
- 3. If the temperature of any safety relief discharge pipe exceeds 4.
Instrumentation shall be 212*F during normal reactor calibrated and checked as power operation for a period of indicated in Table 4.2.F.
greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, an engineering evaluation shall be S.
Notwithstanding the above, as a performed justifying continued minimum, safety relief valves that operation for the corresponding have been in service shall be temp. Increases.
tested in the as-found condition during both Cycle 6 and Cycle 7.
- 4. Any safety relief valve whose discharge pipe temperature exceeds 212*F for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more shall be removed at the next cold shutdown of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more, tested in the as-found condition, and recalibrated as necessary prior to reinstallation.
Power operation shall not continue beyona 90 days Amendment No.' H, 56, 88 126
F LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.B Operation with Inoperable Equipment (Cont'd) reactor operation is permissible under this condition for seven days.
During this period, both diesel generators and associated emergency buses must be demonstrated to be operable.
- 2. From and after the date that incoming power is not available from both startup and shutdown transformers, continued operation is permissible, provided both diesel generators and associated emergency buses are demonstrated to be operable, all core and containment cooling systems are operable, reactor power level is reduced to 257. of design and the NRC is notified within one (1) hour as required by 10CFR50.72.
- 3. From and after the date that one of the diesel generators or associated emergency bus is made or found to be inoperable for any reason, continued reactor operation is permissible in accordance with Specification 3.5.F if Specification 3.9.A.1 and 3.9.A.2.a are satisfied.
- 4. From and after the date that one of the diesel generators or associated emergency buses and either the shutdown or startup transformer power source are made or found to be inoperable for any reason, continued reactor operation is permissible in accordance with Specification 3.5.F, provided either of the Amendment No. 88 196
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.B Operation with Inoperable Equipment following conditions are satisifed:
- a. The startup transformer and both offsite 345 kV transmission lines are available and capable of automatically supplytrig auxiliary power to the emergency 4160 volt buses.
- b. A transmission line and assoclLted shutdown transformer are available and capable of automatically supplying auxiliary power to the emergency 4160 volt buses.
- 5. From and afte.- the date that one of the 125 or 250 volt battery systems is made or found to be inoperable for any reason, continued reactor operation is permissible during the succeeding three days within electrical safety considerations, provided repair work is initiated in the most expeditious manner to return the failed component to an operable state, and Specification 3.5.F is satisfied.
- 6. With the emergency bus voltage less that 3950 but above 3745 (excleding transients) during normal operation, transfer the safety related buses.to the diesel generators.
If grid voltage continues to degrade be in at least Hot Shutdown within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and in Cold Shutdown within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> unless the grid conditions improve.
Amendment No. (1, 61, 88 197
F 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPCNSIBILITY Ine Nuclear Operations Manager shall be accountable for overall facility operation.
In his absence the Nuclear Operations Manager shall designate in writing the individual to assume this responsibility.
6.2 ORGANIZATION A.
OFFSITE The Company organization for station management and technical support shall be as shown on Figure 6.2.1.
B.
FACILITY The Facility organization shall be as shown on Figure 6.2.2 and:
1.
Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.1.
2.
When the unit is in an operational mode other than cold shutdown or refueling, a person holding a Senior Reactor Operator License shall be present in the control room at all times.
In addition to this Senior Operator, a Licensed Operator or Senior Operator shall be present at the controls when fuel is in the vessel.
3.
At least two Licensed Operators shall be present in the control room during reactor startup, scheduled reactor shutdown and during recovery from reactor trips, 4.
An individual quallfled in radiation protection procedures shall be on site when fuel is in the reactor.
5.
ALL CORE ALTERATIONS performed while fuel is in the reactor vessel after the initial fuel loading shall be directly supervised by either a licensed Senior Reactor Operator or Senior.
Reactor Operacor Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
6.
A Fire Brigade of 5 members including a Fire Brigade Leader shall be maintained on site at all times.
This excludes 3 members of the minimum shift crew necessary for safe shutdown and any personnel required for other essential functions during a fire emergency.
C.
CHANGES TO THE ORGANIZATION Changes may be made to the organization without prior license amendment provided that the NRC is notified in writing within 30 days and a revision to Section 6.2 is included in a subsequent license amendment request.
l Amendment No. 67, 80, 88 208-
6.0 ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF QUALIFICATIONS The qualifications with regard to educational and e<perience backgrounds of the facility staff at the time of appointment to the active position shall meet the requirements as described in the American National Standards Institute N18.1-1971, " Selection and-Training of Personnel for Nuclear Power Plants." In addition, the individual performing the function of Radiation Protection Manager shall meet or exceed the qualifications of Regulatory Guide 1.8, September, 1975.
6.4 TRAINING A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager.
The training programs for the licensed personnel shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix A of 10CFR Part 55.
The training programs for the Fire Brigade shall meet or exceed the requirements of NFPA Standard No. 27-1975
" Private Fire Brigade".
Fire Protection Training sessions will be held quarterly.
1 l
Amendment No.61, 66, 69, 88' 208a
- s rt Chfet Executive Officer 8
Sr. Vice President Nuclear Nuclear Safety Review and Audit Consetttee 7
~ ~ ~ ~
I I
Vice President I
Nuclear Engineering and Vice-President f)uality Assurance Nuclear Operations l
I i
I I
Quality Assurance Nuclear Engineering Nuclear Management NuCItar Trainin9 Nuclear Operations Nuclear Operations Manager Manager Services Department Department (Off-stte)
(Off-site)
(Of f-s t te)
(Off-site)
Support Department Department t
(On-site)
(On-site) l 1
Operations Plant Staff Review
_ _a (On-stte)
Cement tlee (On-site)
Boston Edison Company -
Orgenfration for Operation of Pfigrfe !
i Ffgure 6.2.1
- 209 -
f F
ail 3
NUCLEAR e+
OPERATIONS z
MMAGER TECHNICAL SECTION HEAD (ORC CHAIRMAN)
(SRO) l l
CHIEF CHIE F CHIEr CHIEF OPERATIONS mlNTENANCC RADIOLOGICAL CHEMICAL CHIEF ON-5ITE SAFET1 TECHNICAL
& PERFORMANCE ENGINEER ENGINEER ENGINEER ENGINEER ENGINEER GROUP LEADER
($RO) (ORC)
(ORC)
(ORC)
(ORC)
(ORC)
(ORC)
NUCEEAR TECHNICAL TECHNICAL WTCH TECNngCAC TECHNICAL TECHNICAL 5 tart STAFF ENGINEER $
STAfr STAFF STAFF
. Mechanical
- Radletten (5R0)
.Cheefca)
- 0n.5fte
- 5hift
- [lectrical Protection
- Instrument Engineering Technical and Control
- Reactor Advisors Engineertog
- Performance NUCLEAR Engineering OPERATING SUPERVISORS (5RO)
Code: ORC - Member of ORC R0
- NRC Reactor Operator License MUCLEAR 540 - NRC Senior Reactor Operator Lf tense PLANT OPERATORS Pilgrim Station Orgenfration (RO)
)
4 Ffgure 6.2.2 l
- 210 -
e 6.5 REVIEW AND AUDIT A.
OPERATIONS REVIEW COMMITTEE (ORC) 1.
FUNCTION The CRC shall function to advise the Nuclear Operations Manager on all matters related to safety.
2.
COMPOSITION The ORC shall be composed of the:
Chairman:
Technical Section Head Members:
Chief Operating Engineer Chief Maintenance Engineer Chief Technical Engineer Chief Radiological Engineer Chief Chemical Engineer Onsite Safety and Performance Group Leader 3.
ALTERNATES Alternates shall be appointed in writing by the Nuclear Operations Manager to serve on a temporary basis.
4.
MEETING FREQUENCY The ORC shall meet at least once per calendar month and as convened by the ORC Chairman.
5.
QUORUM A quorum of the ORC shall consist of the Chairman or designated alternate and a majority of members / designated alternates; however, no more than two alternates shall be allowed to meet quorum requirements.
6.
RESPONSIBILITIES The ORC shall be responsible for:
a.
Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto that affect nuclear safety.
Amendment No. (p, 69, 88 212
c 6.
RE5?CNSIBILZT!ES (Cont.)
b.
Review all proposed tests and esperiterts that affect nuclear safet).
c.
Review of all proposed changes to the Technical Spe:lfications.
d.
Review of all proposed changes or mcdifications to olant systems er equipment that affect nuclear safety, e.
Review of facility operations to dete:t cotential safety nazarcs.
f.
Review of the Station Security Plan and implementing procecures and changes to the plan and procedures.
g.
Review of the Emergency Plan and implementing procedures anc changes to the plan and procedures.
h.
Performance of special reviews and investigations and reports thereon as requested by the NSRAC Chairman.
1.
Investigation of all violations of the Technical Specifications and shall prepare and forward a report covering evaluation and recommendations to prevent recurrence to the Nuclear Operations Manager, the NSRAC Chairman, and the Vice President - Nuclear Operations.
- j. Review the Station Fire Protection Plan and implementing procedures and changes to the plan and procedures.
The ORC Chairman may appoint subcommittees composed of personnel who are not members of ORC to perform staff work necessary to the efficient functioning of ORC.
7.
AUTHORITY a.
Recommend in writing to the Nuclear Operations Manager approval or disapproval of items considered under 6.5.A.6(a) through (d) above.
b.
Render determinations in writing with regard to whether or not each item considered under 6.5.A.6(a) through (d) above constitutes an unreviewed safety question.
c.
Provide immediate written notification to the Nuclear Operations Manager, the Nuclear Safety Review and Audit Committee and the Vice President - Nuclear Operations, of disagreement between the ORC Members and the ORC Chairman.
The Nuclear Operations Manager shall have responsibility for resolution for such disagreements.
8.
RECORDS The ORC shall maintain written Minutes of each meeting and copies shall be forwarded to the Nuclear Operations Manager, the l
. Nuclear Safety Review and Audit Committee Chairman, and the Vice President - Nuclear Operations.
l Amendment No. 29, 116, 69, 88 213
B.
NUCLEAR SAFETY REV!EW AND AUD1T COMMfTTEE (NSRAC) 1.
FUNCTION.
The NSRAC shall function to provide independent review and audit of designated activities in the areas of:
1.
nuclear power plant operations; 2.
nuclear engineering; 3.
chemistry and radiochemistry; 4.
metallurgy; 5.
Instrumentation and control; 6.
radiological safety; 7.
mechanical and electrical engineering; 8.
quality assurance practices 9.
fire protection 2.
COMPOSITION The NSRAC Chairman and other members shall be appointed by the Senior Vice President - Nuclear, or such other person as he shall designate. NSRAC members shall collectively possess experience and competence required to review and audit the designated 3reas noted in 6.5.B.1.
The collective competence of the committee will be maintained as changes to the membership are made.
The membership shall consist of a minimum of five persons.
3.
ALTERNATES Alternate members shall be appointed in writing by the Senior Vice President - Nuclear or the chairman to serve on a temporary basis; however, no more than two alternates shall participate in a quorum at any one time.
4.
CONSULTANTS Consultants shall be utilized as determined by the NSRAC Chairman to provide expert advice to the NSRAC.
5.
MEETING FREQUENCY The NSRAC shall meet at least once per six months.
6.
QUORUM A quorum of the NSRAC shall consist of the Chairman and a majority of the NSRAC members including alternates.
No more than a minority of the quorum shall have line responsibility for operation of the facility.
Amendment No. 69, 88 214
I l
1 7.
REVIEW The NSRAC shall revien:
a.
The safety evaluations for:
(1) -Changes to procedures, equipment or systems and (2)
Tests or experiments completed under the provision of Section 50.59, 10 CFR to verify that such actions did not constitute an unreviewed safety question.
b.
Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
c.
Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d.
Proposed changes in Technical Specifications or operating license.
e.
Violations of appilcable statutes, codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f.
Significant operating abnormalities or deviations from normal and expected performance of plant equipment that effect nuclear safety.
g.
All events which are required by 10 CFR 50.73 to be reported to the NRC in writing.
h.
Any other matter involving safe operation of the nuclear plant which NSRAC deems appropriate for consideration or which is referred to NSRAC for the onsite operating organization or by other functional organizational units within Boston Edison.
1.
Reports and meeting minutes of the Operations Review Committee.
8.
AUDITS Audits of facility activities shall be performed under the cognizance of the NSRAC.
These audits shall encompass:
a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per year.
b.
The training and qualifications of the entire facility staff at least once per year.
Amendment No. 27, 39, 67, 88 215
c.
The results of all actions required by deficiencies cccurring in facility equipment, structures, systems or metnod of cperation that affect nuclear safety at least once per six mentns.
d.
The performance of all activities required by the Quality Assurance Program to meet the criteria of Appendin "B",
10 CFR 50, at least once per two years.
e.
The Emergency Plan and implementing procedures at least once per two years.
f.
The Station Security Plan and implementing procedures at least once per two years.
g.
Any other area of facility operation considered appropriate by the NSRAC or the Senior Vice President - Nuclear.
h.
The Fire Protection Program and implementing procedures at least once per.two years.
9.
AUTHORITY The NSRAC shall report to and advise the Senior Vice President -
Nuclear on those areas of responsibility specified in Section 6.5.B.7 and 6.5.8.8.
- 10. RECORDS Records of NSRAC activities shall be prepared, approved and distributed as indicated below:
a.
Minutes of each NSRAC meeting shall be prepared, approved and forwarded to the Senior Vice President - Nuclear, NSRAC members, and others the Chairman may designate, within 14 days following each meeting.
b.
Reports of reviews encompassed by Section 6.S.B.7 e, f, g and h above, shall be prepared, approved and forwarded to the Senior Vice President - Nuclear, with a-copy to the Nuclear Operations Manager within 21 days following the completion of the review.
.c.
Audit reports encompassed by Section 6.5.B.8 above shall be forwarded to the Senior Vice President - Nuclear and to the management positions responsible for the areas audited within 30 days after completion of the audit.
6.6 REPORTABLE EVENT ACTION The following actions shall be taken for each reportable event:
A.
The Commission shall be notified and/or a report submitted pursuant to the requirements of either 10 CFR 50.72 or 10 CFR 50.73.
B.
Each Reportable Event Report submitted to the Commission shall be reviewed by the ORC and submitted to the NSRAC Chairman and the Nuclear Operations Manager.
Amendment No. M, H, H N, 88 216
6.7 SAFETY LIMIT VIOLATION The following actions shall be taken in the event a Safety Limit is violated:
A.
The provisions of 10 CFR 50.36(c) (1) (1) shall be compiled with immediately.
B.
The Safety Limit Violation shall be reported to the Commission within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 10CFR50.36(c)(6) and 50.72, and to the Nuclear Operations Manager and the NSRAC Chairman immediately.
C.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the ORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
D.
The Safety Limit Violation Report shall be submitted to the Commission within 30 days in accordance with 10CFR50.36(c)(7) and 50.73 and to the NSRAC Chairman and the Nuclear Operations Manager.
6.8 PROCEDURES A.
Written procedures and administrative policies shall be established, implemented and maintained that meet or exceed the requirements and recommendations of Sections 5.1 and 5.3 of ANSI N18.7 - 1972 and Appendix "A" of USNRC Regulatory Guide 1.33, except as provided in 6.8.B and 6.8.C below.
B.
Each procedure of 6.8.A above, and changes thereto, shall be reviewed by the ORC and approved by the Nuclear Operations Manager prior to implementation.
These procedures shall be reviewed periodically as set forth in administrative procedures.
NOTE:
ORC review and approval of procedures for vendors / contractors, who have a QA Program approved by Boston Edison Company, is not required for work performed at the vendor / contractor facility.
C.
Temporary changes to procedures of 6.8.A above may be made provided:
1.
The intent of the original procedure is not altered.
2.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's license on the unit affected.
3.
The change is documented, subsequently reviewed by the ORC within 7 days of implementation, and approved by the Nuclear Operations Manager.
D.
Written procedures to implement the Fire Protection Program shall be established, implemented and maintained.
Amendment No. 29, )@, (6, 7(, 88 217
6.9 REPCRTING REQUXREMENTS In addition to the applicable reporting requirements of Title 10, Code o' Federal Regulations, the following identified reports shall te submitted to the Director of tne appropriate Regiona! Office of Inspection and Enforcement unless otherwise noted.
A. Routine Reports 1.
.Startue Report.
A summary report of plant startup and pcwer escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to tne license involving a planrad increase in poaer level. (3) installation of fuel that has a different design or nas been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of tne plant.
The report shall address each of the tests identified in the FSAR and shall in general include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.
Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.
If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation), supplementary reports shall be submitted at least every three months until all three events have been completed.
2.
Monthly Operating Report.
Routine reports of operating statistics, shutdown experience and forced reductions in power shall be submitted on a monthly basis to Director, Office of Inspection and Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, to arrive no later than the 15th of'each month following the calendar month covered by the report.
The Monthly Operating Report shall include a narrative summary of operating experience that describes the operation of the facility, including safety-related maintenance, for the monthly report period.
3.
Occupational Exposure Tabulation. A tabulation of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mrem /yr and their associated man-rem exposure according to work and job functions, e.g. reactor operations and surveillance inservice inspection, routine maintenance, special maintenance (including a description), waste processing, and refueling shall be submitted on an annual basis.
This tabulation supplements the requirements of 20.407 of 10 CFR 20.
The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measurements. Small exposures totalling less than 20% of the individual total dose need not be accounted for.
In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific' major work functions.
Amendment No. M, 68, 88 (the next page is 220) 218 w
This page intentionally left blank Amendment No. 88 220
This page intentionally left blank Amendment No. 88 221
r This page intentionally left blank Amendment No. 88 222
3.
Special Reports Special reports shall be submitted as indicated in Table 6.9.1.
6.10 RECORD RETENTION A.
The following records shall be retained for at least five years:
1.
Records of facility operation covering time interval at each power level.
2.
Records of principal maintenance activities, inspections, repair and replacement of principal items of equipment related to nuclear safety.
3.
Reportable Event Reports.
l 4.
Records of surveillance activities, inspections and calibrations required by these Technical Specifications.
5.
Records of reactor tests and experiments.
6.
Records of changes made to Operating Procedures.
7.
Records of radioactive shipments.
8.
Records of sealed source leak tests and results.
9.
Records of annual physical inventory of all source material of record.
B.
The following records shall be retained for the duration of the Operating License:
1.
Record and drawing changes reflecting facility design modifications made to systems and equipment described in the Final Safety Analysis Report.
2.
Records of new and irradlated fuel inventory, fuel transfers and' assembly burnup histories.
3.
Records of facility radiation and contamination surveys.
4.
Records of radiation exposure for all individuals entering radiation control areas.
5.
Records of the service lives of all hydraulic and mechanical snubbers listed on Tables 3.6.I(a) and 3.6.I(b) including the date at which the service life commences and associated installation and maintenance records.
Amendment No. 3@, 69, 88 224