Text
..
OPERATING DATA REPORT DOCKET NO.
50-413 9-13-85 DATE COh!PLETED BY J. A. Reavis TELEPil0NE 704/373-7567 OPERATING STATUS
- 1. Unit Name:
Catawba 1 N l'5
- Nameplate Rating
- 2. Reporting Period: August 1.
198 ts-Aua u s t 11. 198t; 1450'.000 J1VA x.90 power
- 3. Licensed Thermal Power (MWt):
3411 factor per Page 111,
- 4. Nameplate Rating (Gross MWe):
1205 NUREG-0020.
1145
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
1145
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period 744.0 1 536.0 1 536.0
- 12. Number Of Hours Reactor Was Critical 744.0 1 500.1 1 500.1
- 13. Reactor Reserve Shutdown flours
- 14. Hours Generator On.Line 741.1 1 435.9 1 435.9
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 380 104 4 593 186 4 593 186
.17. Gross Electrical Energy Generated (MWH) 821 409 1 571 047 1 571 047
- 18. Net Electrical Energy Generated (MWH) 775 236 1 475 899 1 475 899
- 19. Unit Service Factor 99.6 93.5 93.5
- 20. Unit Availability Factor 99.6 93.5 93.5
- 21. Unit Capacity Factor (Usin MDC Net) 91.0 83.9 83.9
- 22. Unit Capacity Factor (Using DER Net) 91.0 83.9 83.9
- 23. Unit Forced Outage Rate 0.4 6.5 6.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8509180428 850831 y
ADOCK 050g3 DR
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-413 UNIT Catawba 1 DATE 09/13 /85 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 MONTH August, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(Mwe-Net) 1 484 17 1 058 2
1 103 18 1 007 3
1 106 19 1 105 4
1 105 20 1 072 5
1 100 21 1 061 6
1 095 22 1 057 7
1 098 23 1 054 8
1 090 24 1 056 9
1 087 25 1 046 10 1 062 26 1 031 11 736 27 1 063 12 1 083 28 1 062 13 1 080 29 1 063 14 1 085 30 1 063 15 1 066 31 1 067 16 1 059 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute the nearest whole megawatt.
]
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0, 50-413 UNIT NAME Catawba 1 DATE 9/13/85
)
REPORT P5) NTH August 1985 COMPLETED BY J. A.
Reavis Page 1 TELEPHONE 704-373-7567 iO o,$
License y
Cause &, Corrective 3
e32 "c
v5E 8
No.
Date
%h jg Event
,5e, go, o
Action to xmh RE
$2 R
YE 8
%E Prevent Recurrence Report i mv uu H
o~
c=:
3 85-08-01 F
2.92 A
3 CH PUMPXX Feedwater Pump Trip due to High Pump Dischtrge Pressure bP 35-08-05 F
A CC HEATEX Moisture Separator Reheater Drains Valve to Condenser were Inoperable 10-P 85-08-08 S
B CC VALVEX Control Valve Movement Test 11-p 85-08-09 S
B CB HEATEX Moisture Carry-over Test HF INSTRU Stuck Pitot Tube used in Cooling Tower 12-p 85-08-11 F
B Performance Test (Isol. Cooling Tower to Repair Tube) 13-p 85-08-11 F
A CB HEATEX Moisture Carry-over Test out of Spec at 100% power 14-p 85-08-13 F
A CB HEATEX Moisture Carry-over Test out of Spec at 100% power (Maintain 95%)
15-p 85-08-14 S
B CB HEATEX Moisture Carry-over Test 16-p 85-08-15 S
B CB HEATEX Moisture Carry-over Test A
CB HEATEX Moisture Carry-over out of Spec at 100%
17-p 85-08-15 F
Power (Maintain 95%)
l l
1 2
3 4
Reason:
Method:
Exhibit G - Instructions S
led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) i l
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training 4 License Examination l
F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
O/771
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME Catawba 1 DATE 9/13/85 REPORT MDNTH August 1985 COMPLETED BY J. A. Reavis Page 2
'fELEPHONE 704-373_7567 m
E U
License u
Cause & Corrective E-FE 5
~
UE E
EU" Event Er Em Action to
~N*
Date E.
EE E
5$E
% -E
$"8 E
& 85 Edie Report #
&8 Prevent Recurrence 18-p 85-08-15 S
B CC VALVEX Control Valve Movement Test j9-p 85-08-15 F
A CB HEATEX Moisture Carry-over out of Spec at 100%
Power (Maintain 95%)
20-p 85-08-18 F
A CB HEATEX Implement Modification to Lower S/G Levels due to Koisutre Carry-over out of Spec at 100%.
21-p 85-08-20 F
A CB HEATEX Moisture Carry-over out of Spec at 100%
22-p 85-08-21 F
A CB HEATEX Removed Modification to Lower Steam Generator Levels 23-p 85-08-23 S
B CC VALVEX Control Valve Movement Test A
CB HEATEX Moisture Carry-over out of Spec at 100%
24-p 85-08-23 F
25-p 85-08-25 F
A HH PUMPXX Secured C Heater Drain Pump (ICl) to Repair Pump Motor Bearing Support f
Bolts 26-p 85-08-26 F
CB HEATEX Moisture Carry-over out of Spec at 1001 A
Power (Maintain 94%)
1 2
3 4
Reason:
Method:
Exhibit G - Instructions A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
S eI led l
B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling.
3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161).
E-Operator Training & License Examination F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain) 19/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME Catawba 1 DATE 9/13/85 REPORT MONTH August 1985 COMPLETED BY J. A. Reavls Page 3 TELEPHONE 704-373-7567 m
5 o o,$
License y
Cause & Corrective e3?
"c a5E E
No.
Date
%b S
2g Event
,5,
g Action to s$ 5E E
USb EE 83 Prevent Recurrence o-a:
zmo Report #
ma vu 27-P 85-08-30 S
B CC VALVEX Control Valve Movement Test 28-p 85-08-31 F
A CB HEATEX Moisture Carry-over out of Spec at 100% power (Maintain 94%)
1 2
3 4
Reason:
Method:
Exhibit G - Instructions ed h
A-Equipment Failure (Explain) 1-Manual for Preparation of Data gled B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative.
S G-Operational Errcr (Explain)
Exhibit I - Same Source H-Other (Explain)
!9/77)
C
\\
l l
DOCKET NO: 50-413 UNIT: Catawba 1 DATE: 9/13/85 NARRATIVE SUlefARY Month: August 1985 Catawba Unit 1 began the month off line completing an outage to repair Condenser tube leaks. On August 1st the operating Feedpump tripped during restart but the unit returned to service a few hours later. The unit was subjected to a number of Moisture Carryover tests to measure the amount of I
moisture being carried over to the turbine from the Steam Generators.
Based upon the results of the tests the unit reduced power to 95% in order to stay within administrative limits. The unit operated at 95% starting August 12, and remained there for the balance of the month.
- _ ~
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name:
Catawba Unit 1 2.
Scheduled next refueling shutdown:
August, 1986 3.
Scheduled restart following refueling:
October, 1986 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
YES If yes, what will these be?
Technical Specification Revision if no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A l
S.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A l
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
8.
Present licensed fuel pool capacity:
1418 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 2008 DUKE POWER COMPANY Date:
September 13, 1985 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
CATAWBA NUCLEAR STATION Monthly Operating Status Report
.1.
Personnel Exposure For the month of July, no individual (s) exceeded their allowable annual radiation dose limit.
2.
The total station liquid release for July has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.
' The total station gaseous release for July has been compared with the Technical Specifications maximum annual dose commit-I
. ment and was less than 10 percent of this limit.
I
4
.o i,.
I i
DuxE POWER GOMPANY P.O. BOX 33180 CHAMLOTTE, N.O. 28242 i
MALB. TUCKER tut.nenown (Fu4) 373-4 sat vam:
=,
September 13, 1985 Director-Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk l
l l
Re: Catawba Nuclear Station l
Docket No. 50-413
Dear Sir:
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of August, 1985.
f Very truly yours.
-Q
}
I
/ C&T
- S Hal B. Tucker JAR:slb Attachment cc:
Dr. J. Nelson Grace, Regional Administrat.or American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library _
Region 11 The Exchange, Suite 245 101 Marietta. Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross Robert Guild Esq.
U. S. Nuclear Regulatory Commission
.P. O. Box 12097 l
MNBB-5715 Charleston, South Carolina 29412 Washington, D. C..'20555 Palmetto Alliance INPO Records Center 2135 Devine Street Suite 1500-Columbia South Carolina 29205 1100 Circle 75 Parkway Atlanta, Georgia 30339 l
l NRC Resident Inspector Catawba Nuclear Station k
4+'
- -