05000423/LER-1997-015-03, Provides List of Commitments Made Re LER 97-015-03 Per 10CFR50.7.(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D) & 10CFR50.73 (a)(2)(vii)

From kanterella
(Redirected from ML20135C701)
Jump to navigation Jump to search
Provides List of Commitments Made Re LER 97-015-03 Per 10CFR50.7.(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D) & 10CFR50.73 (a)(2)(vii)
ML20135C701
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/21/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135C703 List:
References
B16261, NUDOCS 9703040219
Download: ML20135C701 (4)


LER-1997-015, Provides List of Commitments Made Re LER 97-015-03 Per 10CFR50.7.(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D) & 10CFR50.73 (a)(2)(vii)
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
4231997015R03 - NRC Website

text

p --

ggg Hope Ferry Rd. (Route 156), Waterford, CT 06385 buetear Energy nu. ion, soci,ar rower station Northea : Nuclear Energy Cornpany P.O. Box 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277

%e Northeast Utilitien Systeau February 21,1997 Docket No. 50-423 B16261 Re: 10CFR50.73(a)(2)(li)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-01543 Submitted Pursuant to 10CFR 50.73(aM2MiiWB).10CFR50.73 (aM2MvMD). and j

10CFR50,73(aM2)(vii)

This letter forwards Licensee Event Repoft (LER) 9641543, documenting a condition that was initially determined at Millstone Unit No. 3 on June 10,1996.

This LER was initially submitted pursuant to 10CFR50.73(a)(2)(ii)(B). The first LER supplement, submitted on September 5,1996 was submitted pursuant to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii).

The second LER supplement, submitted on November 22, 1996 was also submitted pursuant to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), 'and 10CFR50.73(a)(2)(vii).

This supplement reports that additional electrical panels were identified that had

- not been included in the past described electrical separation inspections. The results of these inspections will be reported in a supplemental report. NNECO's additional commitments in response to this event are contained within i to this letter.

97o304o219 97o221

[

ADon OMog3 j 7

j J

appsppppm.sg

_mm s i

U'.S. Nuclear Reguistory Commission D,16261\\Page 2 d

i i

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

.D W =

  1. ~

Director, Millstone Unit No. 3

)

i Attachment: 1)

NNECO's commitments in response to LER 96-015-03 2)

LER 96-015-03 cc:

H. J. Miller, Region 1 Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects

I Docket No. 50-423 B16261

[

l Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 96-015 03) l February 1997 l

. -. = - -

U.S. Nuclear Regulatory Commission B.16261%ttachment 1\\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO.

They are described to the NRC for the NRC's j

irdormation and are not regulatory commitments. Please notify the Manager Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

I Number

Commitment

Due B16261-01 The applicable work planning process March 19,1997 j

procedures were revised prior to January 1,1997, to incorporate j

guidance for electrical separation inspection plan development. Due to the revised method of determining i

electrical panels requiring electrical i

separation inspection the procedure is being further revised. This revision will be completed by March 19,1997.

B1626102 Additional electrical panels inspections May 1,1997 s