ML20135C235
| ML20135C235 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/15/1996 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcmeekin T DUKE POWER CO. |
| Shared Package | |
| ML20135C237 | List: |
| References | |
| NUDOCS 9612060238 | |
| Download: ML20135C235 (2) | |
See also: IR 05000369/1996008
Text
__
. _ . . _ . . . . . . _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ . - _ _ _ _ _ .
_ . _ _ _ _ .
I
!
!
I
Novmber 15, 1996
'
,3
,
Duke Power Company
ATTN: Mr. T. C. McMeekin
'
Vice President
.
McGuire Site
'
12700 Hagers Ferry Road
Huntersville. NC 28078-8985
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-369/96-08 and 50-370/96-08.
!
!
l
Dear Mr. McMeekin:
On October 19. 1996, the NRC completed an inspection at your McGuire 1 and 2
I
reactor facilities. The enclosed report presents the results of that inspec-
l
tion,
i
i
During the 6-week 3eriod covered by this inspection )eriod, your conduct of
)
activities at the icGuire facilities was generally claracterized by safety-
'
conscious operations, sound engineering and maintenance practices, and careful
i
radiological work controls.
However, a violation of NRC requirements was
i
identified regarding a testing procedure which did not fully implement
!
Technical Specification Surveillance requirements.
'
The Violation is cited in the enclosed Notice of Violation and the
circumstances surrounding the issue are described in detail in the enclosed
report.
Please note that you are required to respond to this letter and
should follow the instructions specified in the enclosed Notice when preparing
your response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
i
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
original signed by:
L. Wert. Acting Chief
,
fd 206 M $ bbo!69
Reactor Projects Branch 1
A
i
e
1
Division of Reactor Projects
Docket Nos. 50-369. 50-370
Enclosures:
1.
2.
Inspection Report 50-369/96-08. 50-370/96-08
cc w/encls:
(See page 2)
1
nw
2
cc w/encls:
James Snyder
Peter R. Harden. IV
'
Regulatory Compliance
Account Sales Manager
Duke Power Company
Power Systems Field Sales
12700 Hagers Ferry Road
Westinghouse Electric Corporation
Huntersville, NC 28078-8985
P. O. Box 7288
.
Charlotte, NC 28241
l
G. A. Copp
Licensing - EC050
Dr. John M. Barry Director
Duke Power Company
MecklenburgCounthDepartment
P. O. Box 1006
of Environmental Protection
.
Charlotte, NC 28201-1006
700 North Tryon Street
Charlotte, NC 28203
l
Paul R. Newton
Legal Department (PB05E)
Karen E..
Long
Duke Power Company
Assistant Attorney General
422 South Church Street
N. C. Department of Justice
Charlotte. NC 28242-0001
P. O. Box 629
Raleigh, NC 27602
Mr. Robert P. Gruber
Executive Director
Distribution w/encls:
Public Staff - NCUC
V. Nerses. NRR
P. O. Box 29520
S. Rudisail. RII
Raleigh, NC 27626-0520
L. Wert, RII
N. Economos. RII
J.-Michael.McGarry III. Esq.
R. Baldwin, RII
Winston and Strawn
G. Hallstrom, RII
1400 L Street, NW
PUBLIC
D. C.
20005
NRC Resident Inspector
Dayne H. Brown. Director
U.S. Nuclear Regulatory Commission
Division of Radiation Protection
12700 Hagers Ferry Road
N. C. Department of Environment.
Huntersville, NC 28078-8985
Health & Natural Resources
P. O. Box 27687
Raleigh, NC 27611-7687
County Manager of Mecklenburg County
720 East Fourth Street
Charlotte, NC 28202
orrice
. tr opp
pit.nup
pit.nop
p17 000
pit Ops
p
_
SIGNATURE
(p
p
NAME
- M d sa11
$$HA FER
GHARRIS
I
vKES h &
RBALDWIN
a
DATE
11 / 9, / 96
11 / l% / 96
11 /th / 96
11-tt / 96
11 /
1
i / 96
11 /
/ 96
COPY?
jd5)
N0
fd
NO
/h
NO
.YES/
NO
h
NO
YES
NO
OFFillAL RELOkD DOCUMEM hAME: G:\\ML65t606.RFi
V
"
3
!
1
i
..